neqsim-lng-liquefaction
Skill167 starsChanged 7 months agoApache-2.0View on GitHub
LNG liquefaction modelling in NeqSim. USE WHEN: building or sizing a liquefaction plant (SMR, DMR, C3MR, nitrogen expander), calibrating a mixed refrigerant, computing liquefaction specific energy or power, scaling to trains, choosing gas-turbine against electric drive and the resulting carbon intensity, or sizing LNG storage and cargo loading. Covers LNGProcessBuilder, LNGProcessModel, specific-energy validation and phase-state checks.
In this repository140 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- .github/copilot-instructions.mdCopilot instructions
- analyze-convergenceSkill
- analyze-gibbs-convergenceSkill
- book-creationSkill
- design-flash-benchmarkSkill
- design-reactor-benchmarkSkill
- figure-discussionSkill
- generate-publication-figuresSkill
- journal-formattingSkill
- neqsim-acid-gas-treatingSkill
- neqsim-advanced-control-mpc-and-virtual-sensingSkill
- neqsim-agent-handoffSkill
- neqsim-agentic-process-optimizationSkill
- neqsim-api-patternsSkill
- neqsim-autonomous-investigationSkill
- neqsim-capability-mapSkill
- neqsim-capacity-and-utilization-analysisSkill
- neqsim-capacity-increase-screeningSkill
- neqsim-ccs-hydrogenSkill
- neqsim-code-healthSkill
- neqsim-code-hygieneSkill
- neqsim-code-reviewSkill
- neqsim-column-internals-and-rate-basedSkill
- neqsim-compressor-antisurge-recycleSkill
- neqsim-consequence-analysisSkill
- neqsim-continuous-task-improvementSkill
- neqsim-controllability-operabilitySkill
- neqsim-cooling-waterSkill
- neqsim-cpa-water-boundariesSkill
- neqsim-depressurization-mdmtSkill
- neqsim-distillation-designSkill
- neqsim-document-intelligence-extractionSkill
- neqsim-dynamic-equipment-implementationSkill
- neqsim-dynamic-simulationSkill
- neqsim-electrolyte-systemsSkill
- neqsim-emulsion-separationSkill
- neqsim-energy-systems-and-electrificationSkill
- neqsim-engineering-design-packageSkill
- neqsim-eos-regressionSkill
- neqsim-equipment-cost-estimationSkill
- neqsim-exploration-strategy-selectionSkill
- neqsim-field-developmentSkill
- neqsim-field-economicsSkill
- neqsim-firewater-deluge-designSkill
- neqsim-flow-accelerated-corrosionSkill
- neqsim-flow-assuranceSkill
- neqsim-flow-assurance-study-reportSkill
- neqsim-forward-separator-trainSkill
- neqsim-future-operation-studySkill
- neqsim-hazid-fmea-eta-ftaSkill
- neqsim-heat-integrationSkill
- neqsim-hydrogen-productionSkill
- neqsim-input-validationSkill
- neqsim-integrated-production-and-lifecycleSkill
- neqsim-in-writingSkill
- neqsim-java8-rulesSkill
- neqsim-jurisdiction-regulatory-basisSkill
- neqsim-literature-searchSkill
- The first 60 shown.
The file
We split this skill into the rules it gives an agent
2 rules. About 0 are common, 1 is distinctive, and 1 is very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈1
Distinctive · estimate
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 53
Call public build() to obtain an LNGProcessModel.
- Distinctive: line 167
Use these classes for LNG storage and voyage ageing.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
LNG liquefaction with NeqSim
When to use this
Any task that turns a treated gas stream into LNG and needs a defensible power, specific energy,
train count, storage volume or carbon intensity. Pair with neqsim-process-modeling for the
upstream treatment train and neqsim-equipment-cost-estimation for the cost side.
Validate the cycle design
Refrigerant composition, mass circulation and operating pressures define the cycle design. A default inventory is a starting configuration, not evidence that the required feed, product state, pinch, capacity or duty is feasible. Validate those inputs and outputs against the intended design and independent benchmarks before scaling a train. Broad energy bands are screening checks; meeting one does not independently calibrate or qualify the model.
Illustrative screening bands (specific energy on the feed-to-LNG basis):
| Cycle | kWh/kg LNG | Notes |
| Single mixed refrigerant (SMR) | 0.19 – 0.43 | Typical reference ~0.26 |
| Dual mixed refrigerant (DMR) | 0.25 – 0.35 | |
| Propane-precooled MR (C3MR) | 0.27 – 0.35 | Baseload workhorse |
| Cascade | 0.30 – 0.38 | |
| Nitrogen expander | 0.45 – 0.70 | Small scale / FLNG, simplicity over efficiency |
Source: Pereira et al., Energy Conversion and Management 272 (2022) 116364, and the open liquefaction literature. Always cite the band you validate against.
Verified builder contract (Java and Python)
Inspect src/main/java/neqsim/process/lng/LNGProcessBuilder.java and the executable
LNGProcessBuilderTest / LNGProcessBuilderRefrigerantTest under
src/test/java/neqsim/process/lng/ before building the model.
- Construct
LNGProcessBuilderwith no arguments, then set its name and select anLNGProcessCycle: SMR, DMR, C3MR or NITROGEN_EXPANDER. The current enum does not expose a cascade cycle. - Supply the treated feed with
setFeedStream(StreamInterface)or the documented fluid/flow/T/P setters. Set the cold-end target withsetTargetLiquefactionTemperature(double)in °C, and the product pressure withsetProductPressure(double)in bara. - Set refrigerant composition (mole fractions), suction/discharge pressures in
bara and cooling temperature in °C.
setRefrigerantCirculationRatio(double)is refrigerant mass flow/feed mass flow, not a molar circulation ratio. - Call public
build()to obtain anLNGProcessModel. Individual cycle builders such asbuildSMR()are private implementation methods. There is no string constructor,setLngTemperatureorsetLngPressureAPI. LNGProcessModel.run()returns aResult; readgetSpecificEnergyKWhPerKgLNG(),getNetPowerKW()andgetLNGMassFlowKgPerHour()from that result. Inspect yield, exchanger approach, convergence and the energy boundary before accepting the values.- For area composition, retain the live feed and the model's
getProcessSystem().setUpstreamProcess(...)extends its supplied process in place; do not also register the same upstream equipment in a second area and run it twice.
In Python, resolve these same Java classes/enums through the selected NeqSim
bridge (workspace notebooks use neqsim_init and ns.JClass). Do not assume
convenience wrappers or recreate the refrigeration equations in Python. Reuse
one case specification and engine build when comparing Java/Python results.
Validate the refrigerant design
Specify the actual cycle/refrigerant design or fit independently justified design inputs, then assess the resulting model. Sweep circulation and pressures within physical and equipment bounds; inspect duty, pinch/approach, phase states, yield and constraints. An energy number falling inside a broad literature band is a screening check, not a calibration dataset or proof of a valid design. Do not accept the first in-band candidate while ignoring infeasibility or independent benchmarks. Retain the objective, bounds, failed cases and benchmark evidence.
For the current source-backed synthetic SMR example and its acceptance checks,
use LNGProcessBuilderRefrigerantTest.calibratedRefrigerantLandsInsideThePublishedBand
and circulationRatioChangesCompressorPower. This verifies those cases only.
Scaling to a plant
Scale on specific energy, not by multiplying a single train's absolute power, so the train count and the plant rate stay consistent:
train_mtpa = lng_kg_per_h * 8766 * availability / 1e9
n_trains = ceil(plant_mtpa / train_mtpa)
plant_power = specific_energy * plant_mtpa * 1e9 / (8766 * availability) # kWThen add, as separate items:
- End-flash and BOG compression: typically 5–8 % of refrigeration power.
- Utilities (cooling pumps, air, N2, instrument): typically 8–10 %.
A common sanity number: total FLNG/plant power lands near 0.35–0.40 kWh/kg once end-flash and utilities are included, against 0.26–0.32 for the refrigeration cycle alone.
LNG phase state and inventory density
Calculate equilibrium at the specified tank composition, temperature and pressure and inspect the actual phase state. A vapor result is not automatically a flash bug: the specified state may be outside the liquid region. Do not replace the requested operating temperature with a bubble-point temperature simply to obtain a plausible liquid density.
For a deliberately saturated-liquid inventory basis, solve the bubble temperature at the specified pressure, report that solved temperature and assumption, check which liquid phase is present, and initialize properties before retrieving its density. Keep vapor/boil-off mass and the selected density basis explicit. Use mixture-relevant reference data; pure-methane saturation density is only a screening comparison for an LNG mixture.
Driver selection and carbon intensity
This is usually the largest ESG lever in an LNG study and is cheap to compute:
# Gas-turbine drive
fuel_kg_per_h = power_kW / (gt_efficiency * LHV_kWh_per_kg)
co2_kg_per_h = fuel_kg_per_h * 2.72 # kg CO2 per kg of natural gas
intensity = co2_kg_per_h / lng_kg_per_h * 1000.0 # kg CO2 per tonne LNG
# Electric drive
co2_kg_per_h = power_kW * grid_intensity_kg_per_kWhTypical outcomes: gas-turbine drive ~180–220 kg CO2 per tonne of LNG; electric drive from a low-carbon grid ~5–15 kg CO2/t. Electric drive also releases the fuel gas back into production — quantify that, because it extends plateau life and is often worth more than the emission saving.
Storage and marine sizing
cargo_m3 = carrier_size_m3 * 0.985 # allow for heel and trim
cargo_t = cargo_m3 * lng_density / 1000.0
cargoes_per_y = plant_mtpa * 1e6 / cargo_t
days_between = 365.25 / cargoes_per_y
berth_occupancy = cargoes_per_y * turnaround_hours / (365.25 * 24)
loading_rate = cargo_m3 / loading_hours # m3/h -> number of armsRules of thumb: one berth serves up to ~50 % occupancy comfortably; storage of 1.5–2 cargo volumes (roughly 5 days of production) is the usual minimum; 16-inch arms carry ~3000–4000 m³/h each.
Validation gate for any LNG deliverable
- Specific energy inside the published band for the chosen cycle — assert it.
- LNG density cross-checked against a reference equation.
- Feed-to-LNG mass balance closes (account for NGL extraction, fuel and end-flash).
- Feed rate cross-checked against a published plant of similar capacity (~160–170 MMscfd per MTPA for a lean feed; higher for a rich feed with NGL extraction).
Related skills
neqsim-process-modeling— building the treatment train that feeds the liquefierneqsim-water-dewpoint-dehydration-screening— molecular-sieve specification upstreamneqsim-equipment-cost-estimation— costing the trains (watch the correlation validity range)neqsim-ccs-hydrogen— if the CO2 removed upstream is captured rather than ventedneqsim-benchmark-reference-data— the reference-data comparison layer for the validation gate
LNG storage, ageing, rollover and shipping
Use these classes for LNG storage and voyage ageing; they complement, not replace, the liquefaction-train design above.
| Class | Package | Role and verified entry points |
LNGTankLayeredModel, LNGTankLayer | neqsim.process.equipment.lng | Stratified tank state; initialise(double), step(double,double), getLayers() |
LNGAgeingScenario, LNGAgeingResult | neqsim.process.equipment.lng | Process-equipment wrapper and time-series result; setters below, getResults(), getBogMassFlowRate(), getLiquidComposition() |
LNGVaporSpaceModel | neqsim.process.equipment.lng | Headspace pressure and BOG bookkeeping; constructor (double), update(double,double,double,Map,double) |
LNGRolloverDetector | neqsim.process.equipment.lng | Stratification/inversion assessment; assess(List<LNGTankLayer>) |
TankHeatTransferModel, TankGeometry | neqsim.process.equipment.lng | Zone-based heat ingress and tank geometry; TankHeatTransferModel(TankGeometry,double), TankGeometry(ContainmentType,double) |
LNGBOGHandlingNetwork, LNGHeelManager | neqsim.process.equipment.lng | BOG disposition and idealized cargo/heel mixing; calculateDisposition(double), calculateMixedComposition(Map<String,Double>,double,double) |
LNGVoyageProfile, LNGSloshingModel | neqsim.process.equipment.lng | Voyage conditions and sloshing model; LNGVoyageProfile(String), addSegment(Segment) |
LNGShipModel | neqsim.process.equipment.lng | Multiple tank scenarios and aggregate reporting; addTank(LNGAgeingScenario), run(), getTankResults(), getShipResults() |
MethaneNumberCalculator | neqsim.process.equipment.lng | Methane-number calculation from gas composition; calculate(Map<String,Double>) |
LNGTank, Tank, MountainCavern, VesselDepressurization | neqsim.process.equipment.tank | Storage equipment, cavern and vessel depressurization models; use the equipment-specific API and tests before combining with ageing scenarios |
Minimal Java 8 ageing pattern, following the source example:
SystemInterface lng = new SystemSrkEos(111.0, 1.013);
lng.addComponent("methane", 0.92);
lng.addComponent("ethane", 0.05);
lng.addComponent("propane", 0.02);
lng.addComponent("nitrogen", 0.01);
lng.setMixingRule("classic");
Stream feed = new Stream("LNG feed", lng);
feed.setFlowRate(140000.0, "m3/hr");
feed.run();
LNGAgeingScenario scenario = new LNGAgeingScenario("Laden Voyage", feed);
scenario.setTankVolume(140000.0);
scenario.setInitialFillingRatio(0.98);
scenario.setSimulationTime(480.0);
scenario.setTimeStepHours(1.0);
scenario.setOverallHeatTransferCoeff(0.045);
scenario.setAmbientTemperature(308.15);
scenario.run();
List<LNGAgeingResult> results = scenario.getResults();
LNGAgeingResult finalState = results.get(results.size() - 1);
double finalBogRateKgHr = finalState.getBogMassFlowRate();
double finalTankPressureBara = finalState.getPressure();Storage-model gotchas
- Temperatures passed to
setAmbientTemperatureare K; tank pressure is bara; volume is m3; overall U is W/(m2 K); time and step are hours. Do not reuse the liquefaction builder's Celsius setter assumptions here. LNGAgeingScenarioinitializes layered storage from a single feed stream and configured fill ratio. Confirm feed composition, pressure, phase state, tank geometry and heat-transfer basis before treating results as cargo predictions.LNGRolloverDetectoridentifies a stratification risk from supplied layer states; it is not a validated rollover-event CFD or safety model.LNGShipModelruns each tank scenario independently, then aggregates each time-step's results. It does not solve a fully coupled shared BOG header, ship motion, loading dynamics or cargo interaction.LNGHeelManager.calculateMixedComposition(...)documents instantaneous ideal mixing. It does not model incomplete mixing or a transient interface.- BOG disposition, methane number, sloshing, heat-transfer zones and geometry are separate model components. Do not infer full fidelity merely because the orchestrator exposes their classes.
- Results include composition/quality values and BOG rate; verify getter units in
LNGAgeingResultbefore reporting. In particulargetBogMassFlowRate()is kg/hr andgetTimeHours()is hours. - The ageing model's source and unit tests are regression evidence, not independent LNG cargo validation. Benchmark density, BOG, heat ingress and quality change against an approved reference case before design use.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.