neqsim-energy-systems-and-electrification

Skill167 starsChanged 7 months agoApache-2.0View on GitHub

Guides agents through NeqSim energy-bus coupling and facility electrification. USE WHEN: users ask to balance electrical or thermal buses, couple process demand to energy supply, screen power-from-shore, compare electric/gas/steam drivers, dispatch wind/solar/gas turbines, assess turbine degradation or wash intervals, or include carbon-price effects in dispatch. Anchors: EnergyBus, CoupledProcessEnergySolver, MotorDriveTrain, GasTurbineUnit, TurbineDispatchOptimizer, OffshoreEnergySystem.

The file

We split this skill into the rules it gives an agent

4 rules. About 0 are common, 4 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈4

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Run interval profiles for generation, demand, cost, emissions, unmet load, or curtailment.

    line 16
  2. Distinctive:

    Keep shaft power, electrical input power, and fuel thermal power on separate bases when calculating conversion loss or emissions.

    line 67
  3. Distinctive:

    Do not compare a one-hour peak load with annual-average renewable output.

    line 69
  4. Distinctive:

    Check power closure per bus, convergence reason/residuals for coupled solves, duration including a partial final interval, and energy …

    line 130

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Energy Systems and Electrification

When to use this

  • Balance competing electrical, shaft-work, or thermal-utility producers and consumers.
  • Couple process equipment to an energy bus when power allocation changes process operation.
  • Compare power-from-shore, gas-turbine generation, steam, wind, solar, fuel-cell, or hybrid supply cases.
  • Connect electric, gas-turbine, or steam-turbine drivers to a compressor or other shaft load.
  • Evaluate gas-turbine site derating, degradation, water-wash economics, fleet dispatch, or late-life retrofit.
  • Run interval profiles for generation, demand, cost, emissions, unmet load, or curtailment.

Use neqsim-power-generation for thermodynamic turbine/HRSG/combined-cycle construction. This skill covers the energy bus and electrification layer those equipment recipes do not cover. It complements neqsim-compressor-antisurge-recycle: use that skill for compressor protection and recycle power penalties, and this one for source/driver selection and facility energy dispatch.

Class map

For a dedicated common-shaft compressor supply, select CompressorPowerTrain (directDrive, electricDrive, gasElectricDrive) and attach it through CompressorShaft.setPowerTrain. Follow the matching and evidence guide. Power-train and turbine connections are live references. Preserve their identities for blackout, trip and derating updates; serialize the connected graph together and do not evaluate shared mutable equipment concurrently. Include gearbox loss once, motor/VFD and generator losses, and electrical auxiliary demand. Zero setElectricalSupplyLimitW means blackout. Inspect getPowerTrainResult for required versus delivered power, shortfall, fuel, CO2 and feasibility. The adapter does not allocate energy ports; retain CoupledProcessEnergySolver for shared generation/dispatch and a real splitter/recycle for process fuel extraction.

Class familyPackageWhat it doesVerified entry points / result methods
Typed energy buses and ports: EnergyBus, EnergyPort, EnergyNetworkReportneqsim.process.equipment.streamRoutes signed electrical, shaft, heat, and other energy contributions with dispatch and allocation reports.new EnergyBus(name, EnergyType), setContribution, solveBalance, getLastReport, getServedDemand, getUnmetDemand
Process coupling: EnergyNetworkSolver, CoupledProcessEnergySolver, CoupledProcessEnergyResultneqsim.process.equipment.energyRuns bus dispatch inside equipment execution or iterates process and power balances together.addEnergyBus, run, solve, isConverged, getIterations, getMaximumPowerResidual
Interval profiles: EnergyTimeSeriesProfile, EnergyTimeSeriesSimulator, EnergyTimeSeriesResultneqsim.process.equipment.energyApplies step/linear profiles and integrates served/unmet/curtailed energy, cost, and emissions over intervals.step, linear, addProfile, setIntervalSeconds, setDurationSeconds, run, getServedEnergyMWh
Utility heat and demand quality: UtilityEnergyBus, ThermalUtilitySource, ThermalUtilityConsumer, ThermalUtilityQualityAnalysisneqsim.process.equipment.energyAllocates typed thermal utilities and checks level and temperature-grade compatibility.setThermodynamicStates, solveBalance, setAvailablePower, setRequestedPower, getAllocatedPower, canServeProcessTemperature
Conversion and electrified drives: EnergyConverter, ElectricMotor, Gearbox, Inverter, LoadEfficiencyCurve, LoadMappedEnergyConverter, MotorDriveTrain, MotorAssistedDriveTrainneqsim.process.equipment.energyRepresents conversion losses, load-dependent efficiency, motor assist, and shaft/electrical interconnection.setEfficiency, setPerformanceModel, setLoadEfficiencyCurve, setRequestedShaftPower, setPowerTargets, validateSetup
Driver curves: ElectricMotorDriver, GasTurbineDriver, SteamTurbineDriverneqsim.process.equipment.compressor.driverProvides rated power/speed and driver-curve availability for rotating equipment.Constructors with rated power/efficiency; getAvailablePower(speed), getDriverType
Mechanical work boundary: MechanicalShaft, EnergyPortneqsim.process.equipment.streamBalances generated and consumed shaft power and couples it to driven equipment.setGeneratedPower, setConsumedPower, getSpeed, getLastReport
GT site performance: GasTurbineCatalog, GasTurbineSpec, GasTurbinePerformanceMap, GasTurbineUnit, GasTurbineEmissionsneqsim.process.equipment.powergeneration.gasturbineUses catalog ratings, ambient correction, compressor demand, degradation, and fuel-based emissions.GasTurbineCatalog.get, setAmbient, addPowerConsumer, run, getAvailablePowerW, getLoadFraction, getCO2EmissionKgPerS
GT degradation and wash economics: GasTurbineDegradation, GasTurbineWashPlannerneqsim.process.equipment.powergeneration.gasturbineTracks fired-hour penalties and compares wash intervals with fuel, emissions, and outage cost inputs.addFiredHours, offlineWash, onlineWash, optimize
Dispatch and carbon price: TurbineDispatchOptimizer, CO2TaxSchedule, LateLifeRetrofitStudyneqsim.process.equipment.powergeneration.gasturbineSelects a feasible fleet dispatch and evaluates retrofit cases with explicit fuel/carbon costs.dispatch, CO2TaxSchedule.getTotalNOKPerTonne, LateLifeRetrofitStudy.run
Renewable and hybrid supply: WindTurbine, WindFarm, SolarPanel, OffshoreEnergySystemneqsim.process.equipment.powergenerationCalculates renewable generation profiles and evaluates offshore hybrid dispatch and avoided emissions.setWindSpeedTimeSeries, runTimeSeries, getPowerTimeSeries, runHourlyDispatch, getWindPowerFraction
Other generation and reference case: SteamTurbine, FuelCell, OffshoreEnergyReferenceCaseneqsim.process.equipment.powergeneration and neqsim.process.equipment.energyProvides steam/fuel-cell generation and a reproducible offshore 24-hour energy-system example.SteamTurbine.getPower("kW"), FuelCell.getPower, OffshoreEnergyReferenceCase.run24HourCase

Energy-system data flow

  • Bus balance: producer/consumer ports publish signed power -> dispatch strategy allocates supply -> EnergyNetworkReport records served demand, unmet demand, curtailment, losses, and emissions/cost metadata.
  • Process coupling: process equipment requests power -> CoupledProcessEnergySolver dispatches its buses and reruns the process -> convergence result reports process and power residuals. Use this only when the process response feeds back on demand.
  • Electrification: simulated shaft demand -> motor/drive conversion and bus request -> grid or hybrid supply -> unmet load and fuel/emissions comparison. Keep site grid intensity and availability as explicit inputs.
  • Hybrid supply and time series: wind/solar/weather and gas-turbine availability -> interval dispatch -> MWh, curtailment, fuel/cost, and CO2 totals.
  • GT health/dispatch: measured or declared fired hours and wash effectiveness -> performance-map correction -> feasible fleet dispatch -> fuel/carbon cost or retrofit comparison.

Practical study sequence

  1. Freeze the load basis: process shaft power, electrical auxiliaries, utility heat, operating hours, and the time interval represented by each sample.
  2. Choose a balance-only EnergyBus for a fixed snapshot; use CoupledProcessEnergySolver when process recalculation changes the requested power.
  3. For a real turbine driver, use a vendor-rated performance model for fuel matching or a catalog GasTurbineUnit for site correction, compressor loads, and fleet dispatch.
  4. For electrification, state imported-grid emissions intensity and availability explicitly; compare the released fuel gas separately from the grid CO2 result.
  5. For intermittent supply, pass a time-aligned wind/load profile to EnergyTimeSeriesSimulator or the applicable offshore dispatch model; report unmet and curtailed energy as well as totals.
  6. For a wash or retrofit decision, vary outage hours, recovery, fired-hour deterioration, fuel price, and CO2 schedule. Keep each economic assumption visible.
  7. Inspect participant allocations as well as net bus power; an aggregate balance can hide an individual curtailed load.
  8. Keep shaft power, electrical input power, and fuel thermal power on separate bases when calculating conversion loss or emissions.

Do not compare a one-hour peak load with annual-average renewable output. Preserve interval durations and include the partial final interval in energy integration.

Build pattern

This minimal Java example is a bus-level balance. Contributions are signed watts: generation is positive and consumption is negative. Use connected EnergyPorts plus EnergyNetworkSolver or CoupledProcessEnergySolver when the contributions must be produced by live process equipment.

EnergyBus grid = new EnergyBus("shore power", EnergyType.ELECTRICAL);
grid.setContribution("wind", 2.0e6);
grid.setContribution("process load", -1.5e6);
EnergyNetworkReport report = grid.solveBalance();

double servedDemandW = report.getServedDemand();
double unmetDemandW = report.getUnmetDemand();
double curtailedSupplyW = report.getCurtailedSupply();

Equivalent Python class lookup:

from neqsim import jneqsim

EnergyBus = jneqsim.process.equipment.stream.EnergyBus
EnergyType = jneqsim.process.equipment.stream.EnergyType

grid = EnergyBus("shore power", EnergyType.ELECTRICAL)
grid.setContribution("wind", 2.0e6)
grid.setContribution("process load", -1.5e6)
report = grid.solveBalance()
served_demand_w = report.getServedDemand()
unmet_demand_w = report.getUnmetDemand()
curtailed_supply_w = report.getCurtailedSupply()

For process feedback, create CoupledProcessEnergySolver(process), call addEnergyBus(bus), then solve(). Check result.isConverged() and result.getTerminationReason(); a normal ProcessSystem.run() is not a substitute for the coupled solve when equipment load depends on its dispatched allocation.

Result extraction

  • EnergyNetworkReport.getOfferedSupply, getAcceptedSupply, getRequestedDemand, getServedDemand, getUnmetDemand, and getCurtailedSupply are W. EnergyBus.setContribution(participant, power, unit) converts a supplied unit to W.
  • CoupledProcessEnergyResult.getIterations, getMaximumPowerResidual, getMaximumProcessResidual, and getTerminationReason are solver diagnostics; compare residuals with configured tolerances.
  • EnergyTimeSeriesResult.getServedEnergyMWh, getUnmetEnergyMWh, and getCurtailedEnergyMWh are MWh; getCo2EmissionsKg is kg. getOperatingCost uses the energy-price inputs supplied to the ports.
  • GasTurbineUnit.getAvailablePowerW() is W, getLoadFraction() is dimensionless, and getCO2EmissionKgPerS() is kg/s.
  • GasTurbineWashPlanner.WashPlan reports annual fuel volume, extra CO2 tonnes, costs, and wash interval; TurbineDispatchOptimizer.dispatch accepts demanded power in W.
  • SteamTurbine.getPower("kW") accepts a power unit. WindFarm.getPower("kW") accepts a power unit; its no-argument getPower() is documented as W.

Gotchas

  • Contribution sign matters: positive injects power, negative withdraws. EnergyBus values are W by default; do not pass kW without the overload's unit argument.
  • A bus with no registered/connected ports may have a valid arithmetic balance but no process coupling. EnergyNetworkSolver.validateSetup() reports “No energy buses are configured” with “Call addEnergyBus(bus)” and warns when a bus has no connected ports.
  • EnergyConverter.validateSetup() asks for a connected input port and recommends connecting an input energy stream; the output port is a warning. MotorDriveTrain.validateSetup() separately requires the motor/bus, shaft, and driven equipment connections.
  • A UtilityEnergyBus needs a matching utility level and physically feasible supply/return enthalpy/temperature grade. A generic electrical bus is not a thermal utility substitute.
  • Ambient turbine temperature is K and ambient pressure is bara. Keep GT load demand in W; label vendor and fuel data separately from catalog defaults.
  • Site rating, exhaust-temperature limit, WHRU duty and an electric/shore/bottoming dispatch against ambient: GasTurbineUnit.getAvailablePowerAtAmbient, GasTurbinePerformanceMap.setSiteRatingFromPowerPoints, PlatformPowerSystem.evaluate (section "Site rating, exhaust limit and waste heat" in neqsim-power-generation); gas-turbine/motor drivers limiting compressors on a common shaft: CompressorShaft (see neqsim-rotating-equipment-design).
  • Wash optimization is only as credible as the measured degradation trend, wash recovery, outage/deferment, fuel value, and carbon-price inputs. A wash interval at a search bound is not proof of a global optimum.
  • These classes do not perform AC load-flow, grid stability/protection studies, power-quality certification, or project sanction economics. Hybrid dispatch and CO2 savings are screening evidence, not a grid connection design.
  • Electrode-boiler displacement: avoided electricity is heat / efficiency (about 0.99), and CO2 saved is that electricity times the grid factor. On a Power-from-Shore platform the average factor (20-25 g/kWh) makes platform CO2 small while the marginal factor (about 300 g/kWh) makes it large; report both and the NOK per tonne on each basis. The measured waste-heat-unit duty is not the electric-boiler duty - get the boiler power history before valuing displaced electricity. Worked pattern (hot-end exhaust coil on a gas turbine, steam-turbine loss while the OTSG is in service): neqsim-power-generation, section "Added exhaust heat recovery for a heating-medium (HM) circuit".

Validation / benchmarks

  • OffshoreEnergyReferenceCase.run24HourCase() provides a reproducible reference time-series case; compare totals via its associated helper methods rather than treating one illustrative profile as site data.
  • Regression coverage includes UtilityEnergyNetworkTest, CoupledProcessEnergySolverTest, EnergyTimeSeriesSimulatorTest, EnergyNetworkDynamicsTest, ElectricMotorPerformanceIntegrationTest, and OffshoreEnergyReferenceCaseTest.
  • Check power closure per bus, convergence reason/residuals for coupled solves, duration including a partial final interval, and energy integration in MWh. Cross-check GT availability and emissions against declared ratings/fuel composition.
  • The neqsim-power-generation examples remain the route for detailed GT/steam-cycle thermodynamics, HRSG heat recovery, and combined-cycle process integration.

Related skills

  • neqsim-power-generation — GT, steam turbine, HRSG, combined cycle, and thermodynamic generation models.
  • neqsim-compressor-antisurge-recycle — compressor surge protection and recycle power penalties.
  • neqsim-utility-design and neqsim-utilities-specification — utility duties, levels, and design basis.
  • neqsim-heat-integration — process heat recovery and utility targeting.
  • neqsim-field-economics — project NPV and fiscal economics beyond dispatch cost.
  • neqsim-process-modeling — process equipment and flowsheet assembly.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.