Process controllability and operability — operating envelope mapping, turndown analysis, startup/shutdown sequencing, control valve sizing per ISA-75 (Fl, Fp, choked flow), rangeability, hunting/loop tuning, recycle stability. USE WHEN: a task involves operability assessment, turndown studies, control valve sizing, startup/shutdown procedures, or 'will this design operate?' questions. Complements neqsim-dynamic-simulation (transient solver) with steady-state operability framing.

The file

We split this skill into the rules it gives an agent

6 rules. About 0 are common, 5 are distinctive, and 1 is very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈5

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 1

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Minimum flow: must be at > 20% open (rangeability check)

    line 92
  2. Distinctive:

    Maximum flow: must be at < 90% open (margin)

    line 93
  3. Distinctive:

    If turndown ratio > rangeability, you need a split-range or two valves in parallel.

    line 104
  4. Distinctive:

    Add an explicit pressure setpoint instead of free-floating P

    line 145
  5. Distinctive:

    Document each major mode as a state machine:

    line 149
  6. Very specific:

    Use neqsim-dynamic-simulation to validate the transient.

    line 160

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

NeqSim Controllability & Operability Skill

The "can this plant be operated?" half of process design — operating envelopes, turndown, startup/shutdown sequencing, control valve sizing, and steady-state operability checks. Pairs with neqsim-dynamic-simulation which solves the transient response.

When to Use

  • Mapping operating envelope (P, T, flow, composition window where the plant runs)
  • Turndown analysis (10–100% capacity)
  • Control valve sizing per ISA-75 / IEC 60534
  • Startup / shutdown sequence definition
  • Recycle stability / loop interaction screening
  • Identifying hidden constraints (compressor surge, tray weeping, HX pinch)
  • Evaluating P&ID-derived valve changes such as closing an isolation valve, partly closing a control valve, opening a bypass, or changing controller mode

For P&ID-driven operational changes, load neqsim-pid-process-operations first to classify symbols, define the topology, bind plant tags, and turn each action into a NeqSim model delta.

For MCP or Java workflows that already have a ProcessSystem, use neqsim.process.operations.envelope.OperationalEnvelopeEvaluator or MCP runOperationalStudy with action="evaluateOperatingEnvelope". The evaluator does not duplicate equipment physics; it ranks margins from EquipmentCapacityStrategyRegistry, uses optional tagreader field data through OperationalTagMap, and can turn margin history into simple time-to-limit screening.

Standards: ISA-75.01 / IEC 60534-2-1, API 685 (control valves), NORSOK P-002 (operability).

Pattern 1 — Operating Envelope Map

Sweep two key handles (e.g. flow and composition) and check that every constraint is satisfied in the operating window:

double[] flows = linspace(0.1, 1.0, 10);   // 10–100% turndown
double[] gors  = linspace(50.0, 800.0, 8); // GOR variation

for (double f : flows) {
    for (double g : gors) {
        SystemInterface fluid = makeFluid(g);
        feed.setFlowRate(f * design_kgh, "kg/hr");
        process.run();
        envelope.recordPoint(f, g, checkConstraints(process));
    }
}

Constraints to check on every point:

ConstraintCheckSource
Compressor surgeQ_actual > Q_surge × 1.10Vendor curve
Compressor stonewallQ_actual < Q_choke × 0.95Vendor curve
Separator vapor velocityv < K × √((ρL−ρV)/ρV)NORSOK P-100 (K=0.107)
Separator residence timet_res ≥ 3 min liquid, ≥ 30 s gasAPI 12J
HX ΔTminΔT > 5 °C everywherePinch design
Column floodingC_factor < 0.85 × C_floodSouders–Brown
Column weepingC_factor > 0.55 × C_floodTray vendor
Pump NPSHaNPSHa > NPSHr + 1 m marginAPI 610
Control valve opening20% < travel < 80%ISA-75

Pattern 2 — Control Valve Sizing (ISA-75)

import neqsim.process.equipment.valve.ThrottlingValve;

ThrottlingValve cv = new ThrottlingValve("LV-1101", inletStream);
cv.setOutletPressure(P_downstream_bara);
cv.run();

double Cv_required = cv.getCv();          // ISA-75 sizing
double opening     = cv.getPercentValveOpening();
double dpRatio     = cv.getDeltaPressure() / cv.getInletPressure();
boolean choked     = dpRatio > cv.getFL() * cv.getFL() * (1 - cv.getFf() * cv.getXt());

Sizing rules:

  • Pick valve such that normal flow is at 60–70% open
  • Minimum flow must be at > 20% open (rangeability check)
  • Maximum flow must be at < 90% open (margin)
  • For choked flow: use Fl × ΔP_choke instead of actual ΔP

Rangeability:

Trim typeRangeability
Linear30:1
Equal percentage50:1
Quick opening10:1

If turndown ratio > rangeability, you need a split-range or two valves in parallel.

Seat Leakage Tightness (screening)

To rank candidate valve tightness requirements (isolation/ESDV block valves vs throttling control valves), use the ValveSeatLeakageClass enum (neqsim.process.equipment.valve). It covers EN 12266-1 Rates A–G (isolation valves) and ANSI/FCI 70-2 Classes II–VI (control valves); Class IV (0.01% of rated capacity) is the typical control-valve default, Class VI is the soft-seat essentially-zero-leakage class:

import neqsim.process.equipment.valve.ValveSeatLeakageClass;

ValveSeatLeakageClass ctrl = ValveSeatLeakageClass.FCI_70_2_CLASS_IV;
boolean tight = ctrl.isEssentiallyZeroLeakage();   // false for Class IV, true for Class VI

// ANSI/FCI 70-2 Class V closed-form liquid leak-rate screening estimate (test medium water)
double leakRateMlPerMin =
    ValveSeatLeakageClass.estimateFciClassVLeakRate(50.0e5 /* Pa */, 0.10 /* m port */);

This is screening-level only and not a substitute for a manufacturer seat-leakage test certificate. See docs/process/ValveMechanicalDesign.md for the full reference.

Pattern 3 — Recycle Stability

A process with strong recycles can have multiple steady states or be unstable:

ProcessSystem.RecycleConvergenceMonitor mon = process.getRecycleMonitor();
process.run();
double[] residual = mon.getMassResidualHistory();
// Plot residual vs iteration — should be monotone decreasing.
// If oscillating: recycle interactions; if diverging: bad initial guess or fundamental instability

Stabilization tactics:

  • Increase damping factor on recycle stream (0.3–0.7)
  • Set initial guess from previous-load solution (warm start)
  • Decompose with ProcessModel so each area converges first
  • Add an explicit pressure setpoint instead of free-floating P

Pattern 4 — Startup / Shutdown Sequence

Document each major mode as a state machine:

StateP / T / flowActive controllersActive SIFs
Cold shutdownatmospheric, ambientnoneall in OOS
Pressurizationramp to design × 0.3 in 30 minPIC slow rampHIPPS armed
Cold circulationfull rate, ambient (recycle to flare)LIC, FICall armed
Heat-upramp 50 °C/h to design TTIC, LIC, FICall armed
Normaldesign pointall loops in AUTOall armed
Emergency BDdepressurize per API 521 in 15 mincontrollers trippedBDV open

Use neqsim-dynamic-simulation to validate the transient.

Pattern 5 — Loop Tuning Sanity

For each PID:

  • Gain (Kp): 0.5 × Ziegler–Nichols ultimate; tighten only if oscillation
  • Integral (Ti): 1–3 × dead time
  • Derivative (Td): usually off; only for slow exotherms / temperature

Common bad loops:

  • Level on a vessel with rapid throughput change → use averaging level (P-only, low gain)
  • Composition (e.g. column reflux) → cascade onto temperature
  • Surge control on compressor → fast PI + proportional kicker

Pattern 6 — Operability Scorecard for the Report

Operability Scorecard
=====================
Turndown        : 25–110% of design     PASS (target ≥ 25%)
Compressor      : surge margin 18% @ low end   PASS (≥ 10%)
Column          : flooding margin 22% @ high end  PASS (≥ 15%)
Recycle stab.   : converges in 8 iters @ all loads  PASS
Control valves  : 4 valves outside 20–80% range — RESIZE
Startup time    : 6.5 hr (cold→full)    PASS (target ≤ 8 hr)
SD time         : 12 min API 521 BD     PASS (target ≤ 15 min)

Common Mistakes

MistakeFix
Sizing CV with normal ΔP and forgetting choked flowAlways check σ = ΔP / Fl² × ΔP_max; if exceeded use choked formula
One CV across full 10–110% rangeRangeability > 30:1 needs split-range or two valves
Designing only at 100% flowMin/max constraints often govern (surge, weeping, NPSH)
Ignoring recycle interactions until commissioningDecompose with ProcessModel, verify convergence at each load
Aggressive Kp on level controlCauses throughput oscillation downstream; use P-only averaging
No startup BD pathCold flare/atmospheric vent path required for trip-from-pressurized
Using "design rate" pump curvePumps often run at 60–80% Qbep at normal — pick BEP at normal

Validation Checklist

  • Operating envelope plotted with turndown range and at least 2 disturbance axes
  • All control valves: 20% < normal opening < 80%
  • Compressor surge margin ≥ 10% at lowest expected flow
  • All recycles: convergence in ≤ 20 iterations across the envelope
  • Startup sequence documented as state machine with controller modes
  • Emergency BD validated dynamically per API 521 (≤ 15 min to 50% MAWP)
  • Operability scorecard included in the report (results.json → operability section)

Related Skills

  • neqsim-dynamic-simulation — solve the transient
  • neqsim-process-safety — link operability gaps to safety scenarios
  • neqsim-relief-flare-network — startup/SD blowdown loads
  • neqsim-platform-modeling — multi-area recycle decomposition
  • neqsim-control-authority-screening (community) — the operational counterpart: whether an installed loop has already run out of authority in the historian, as opposed to whether it was sized with enough

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.