Support architectural cost planning, quantity-based option comparison, value engineering and life-cycle tradeoff analysis using traceable quantities and cost sources. Use for early cost plans, option deltas, budget reconciliation, VE workshops and scope prioritization.
In this repository31 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- architectural-drawing-generationSkill
- architecture-orchestratorSkill
- architecture-programmingSkill
- architecture-red-teamSkill
- area-quantity-auditSkill
- autocad-dwg-workflowSkill
- building-envelope-performanceSkill
- cad-bim-automationSkill
- civil-site-designSkill
- concept-design-reviewSkill
- concept-schematic-designSkill
- construction-administrationSkill
- construction-documentationSkill
- drawing-qaSkill
- handover-fm-postoccupancySkill
- interior-fitout-designSkill
- life-safety-accessibilitySkill
- materials-specificationsSkill
- mep-coordinationSkill
- openbim-ifc-coordinationSkill
- precedent-researchSkill
- presentation-reviewSkill
- revit-workflowSkill
- rhino-grasshopper-workflowSkill
- site-analysis-feasibilitySkill
- site-regulation-researchSkill
- structural-coordinationSkill
- sustainability-daylight-energySkill
- visualization-renderingSkill
The file
We split this skill into the rules it gives an agent
5 rules. About 0 are common, 4 are distinctive, and 1 is very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈4
Distinctive · estimate
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 15
Keep verified facts, project assumptions, design options, and unresolved questions visibly separate.
- Distinctive: line 20
Use sourced unit rates/ranges and state base date, currency, taxes/fees, contingency and escalation treatment.
- Distinctive: line 40
Do not present estimates as tenders, final accounts or professional QS certification.
- Distinctive: line 41
Do not invent current market rates or contractor pricing.
- Distinctive: line 45
If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application …
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Cost Planning & Value Engineering
Provide transparent estimates and option logic; keep professional quantity surveying/cost certification outside the skill.
Preflight
- Area/quantity basis, design stage, location/currency/base date, procurement assumptions, inflation/escalation basis, allowances and exclusions.
- Latest cost plan or benchmark sources and defined client budget.
Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.
Workflow
- Freeze a quantity/area baseline and map cost drivers to systems/elements rather than arbitrary percentages.
- Use sourced unit rates/ranges and state base date, currency, taxes/fees, contingency and escalation treatment.
- Compare options by cost delta plus performance/design/program consequences; avoid cost-only optimization.
- Track accepted/rejected VE items, design impacts and required drawing/spec changes.
Deliverables
- Cost-plan assumptions sheet
- Element/option cost matrix
- VE register with consequences
- Budget reconciliation and unknowns
Verification
- Quantities reconcile with area/quantity audits and cost sources are dated/location-specific.
- Ranges and uncertainty widen appropriately for earlier stages.
For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.
Professional boundaries
- Do not present estimates as tenders, final accounts or professional QS certification.
- Do not invent current market rates or contractor pricing.
If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.
If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.