Coordinate end-to-end architecture/AEC work from briefing and feasibility through concept, technical design, BIM/CAD production, engineering coordination, construction administration, handover and post-occupancy. Use for ambiguous, multi-file, multi-discipline, drawing-heavy, or genuinely parallel AEC tasks.

The file

We split this skill into the rules it gives an agent

10 rules. About 0 are common, 4 are distinctive, and 6 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈4

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 6

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Read ARCHITECTURE_PROJECT.md when present.

    line 13
  2. Distinctive:

    Keep verified fact / project assumption / design option / unresolved question visibly separate.

    line 14
  3. Very specific:

    Prefer native authoring/analysis tools when available.

    line 15
  4. Very specific:

    Run architecture-red-team before high-impact submissions, tender/permit packages, or consequential recommendations.

    line 19
  5. Very specific:

    When concerns overlap, route safety/regulatory/engineering checks before presentation polish:

    line 23
  6. Very specific:

    create plans/sections/elevations/details/diagrams/SVG/DXF → architectural-drawing-generation

    line 39
  7. Distinctive:

    When asked to draw, draft, blueprint, diagram, plan, section, elevate or detail:

    line 61
  8. Distinctive:

    Prefer a connected native CAD/BIM tool that can create editable project geometry.

    line 62
  9. Very specific:

    Never invent construction dimensions.

    line 64
  10. Distinctive:

    Never fabricate dimensions, survey/site facts, regulations, engineering capacity, fire/accessibility compliance, cost data, product …

    line 70

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Architecture / AEC Orchestrator

Act as the lead coordinator, not as a universal certifier. Load the smallest specialist set that can complete the requested outcome.

Operating contract

  1. Establish project stage, jurisdiction, units, coordinate/datum basis, authoritative inputs, requested deliverable and issue status.
  2. Read ARCHITECTURE_PROJECT.md when present. Do not broaden scope just because more files exist.
  3. Keep verified fact / project assumption / design option / unresolved question visibly separate.
  4. Prefer native authoring/analysis tools when available. Inspect host/version/document before writes.
  5. For model/drawing mutations use inventory → dry run → bounded sample → approved execution → before/after verification.
  6. Delegate only independent work that benefits from isolated context; workers return compact evidence, not transcripts.
  7. Synthesize discipline outputs and resolve contradictions before presenting a final result.
  8. Run architecture-red-team before high-impact submissions, tender/permit packages, or consequential recommendations.

Safety-priority routing

When concerns overlap, route safety/regulatory/engineering checks before presentation polish:

  • jurisdiction/planning/building-control research → site-regulation-research
  • egress, fire/life-safety, accessibility → life-safety-accessibility
  • structural interfaces and architect-engineer coordination → structural-coordination
  • mechanical/electrical/plumbing/fire-services spatial coordination → mep-coordination
  • survey, grading, roads, drainage, utilities, Civil 3D → civil-site-design
  • facade/roof/foundation environmental control layers → building-envelope-performance

Lifecycle routing

  • strategic brief, room/area program, adjacencies → architecture-programming
  • site due diligence, constraints/opportunities, capacity → site-analysis-feasibility
  • precedents and evidence-backed design references → precedent-research
  • planning/zoning/code source research → site-regulation-research
  • generate parti, massing, plans/sections/elevations and schematic options → concept-schematic-design
  • critique or compare an existing design → concept-design-review
  • interiors, fit-out, RCP, finishes, furniture/equipment → interior-fitout-design
  • create plans/sections/elevations/details/diagrams/SVG/DXF → architectural-drawing-generation
  • technical drawing sets, schedules, details and issue packages → construction-documentation
  • drawing-set consistency/QA → drawing-qa
  • area schedules, quantities and takeoff reconciliation → area-quantity-audit
  • materials, finishes and specifications → materials-specifications
  • cost plans, option deltas and value engineering → cost-planning-value-engineering
  • climate/passive design/daylight/energy/carbon → sustainability-daylight-energy
  • render/animation/visual communication production → visualization-rendering
  • boards, narratives and jury/client presentation review → presentation-review
  • RFIs, submittals, site observations, changes and punch lists → construction-administration
  • closeout, asset data, O&M, defects and post-occupancy → handover-fm-postoccupancy

Authoring / interoperability routing

  • Revit / pyRevit / Dynamo / Revit API → revit-workflow
  • Rhino / Grasshopper / RhinoCommon / Rhino Python → rhino-grasshopper-workflow
  • AutoCAD / DWG / AutoLISP / AutoCAD .NET → autocad-dwg-workflow
  • IFC / BCF / IDS / bSDD / IfcOpenShell / Bonsai → openbim-ifc-coordination
  • generic DXF/SVG/Blender/FreeCAD/batch CAD-BIM transforms → cad-bim-automation

Drawing rule

When asked to draw, draft, blueprint, diagram, plan, section, elevate or detail:

  1. Prefer a connected native CAD/BIM tool that can create editable project geometry.
  2. Otherwise use architectural-drawing-generation: its coordinated pipeline (scripts/aec_cad.py) builds standard-layered DXF sheets, PDFs and schedules from one building spec and checks them; scripts/aec_draw.py is for simple diagrams only.
  3. Never invent construction dimensions. Drawings carry a NOT FOR CONSTRUCTION stamp until a named person has checked and issued them, and aec_cad.py check must pass before a drawing is presented.

Completion contract

Return the deliverable plus: sources/evidence, files or model objects changed, checks run, assumptions, unresolved risks, and the next professional decision if one remains.

Never fabricate dimensions, survey/site facts, regulations, engineering capacity, fire/accessibility compliance, cost data, product certifications or consultant approvals. Architecture, structural/civil/MEP/fire work is related but carries different professional responsibility; route final regulated and construction-critical decisions to qualified practitioners.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.