generate-change-impact

Skill6 starsChanged 7 months agoMITView on GitHub

Generates a change impact assessment file (change-impact-CR-001.xlsx) for Phase 4 — Development. PM describes a scope change request; the agent classifies the change (scope / budget / timeline / resource), analyzes impact on project-plan.md and project-budget.xlsx, calculates timeline delta, budget delta, and risk level (Low / Medium / High), then produces a two-sheet xlsx artifact with a summary and detailed breakdown. PM reviews the draft and makes the final approval decision. Covers task #21 of the project management agent. Mode B: agent prepares draft, PM decides. If approved — updates project-plan.md via generate-project-plan. Triggers EN: 'scope change request', 'change impact assessment', 'generate change impact'.

The file

Show its rules and text

We split this skill into the rules it gives an agent

23 rules. About 0 are common, 18 are distinctive, and 5 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈18

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 5

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    If the request is in Russian → use templates with -ru suffix, respond in Russian

    line 25
  2. Distinctive:

    If the request concerns general change management (methodology, processes) or does not describe a specific scope change → respond: …

    line 55
  3. Distinctive:

    Do not start the workflow.

    line 60
  4. Distinctive:

    If the request contains a description of a specific change → proceed to Step 2.

    line 62
  5. Distinctive:

    Ask a clarifying question before proceeding to Step 3: "To calculate impact accurately, please clarify:

    line 76
  6. Distinctive:

    Do not proceed to Step 3 without an answer.

    line 80
  7. Distinctive:

    Ask: "Please describe the change in more detail:

    line 83
  8. Distinctive:

    If the change affects multiple categories — assign a primary one, list the rest as secondary.

    line 98
  9. Distinctive:

    Read project files for impact analysis:

    line 104
  10. Distinctive:

    Ask PM a clarifying question: "Files project-plan.md / project-budget.xlsx not found.

    line 109
  11. Distinctive:

    If this data is not available — I will generate the assessment based on the change description only." Use the answers in the Step 4 …

    line 114
  12. Distinctive:

    Use the answers in the Step 4 analysis.

    line 115
  13. Distinctive:

    If budget data is unavailable — mark as "to be confirmed by PM"

    line 134
  14. Distinctive:

    Ask: "Is this data correct?

    line 165
  15. Very specific:

    Follow the schema from templates/change-impact-{lang}.md.

    line 173
  16. Very specific:

    Use the xlsx skill to create change-impact-{id}.xlsx.

    line 175
  17. Distinctive:

    Add a comment if needed."

    line 181
  18. Very specific:

    Update project-state.md: artifact change-impact-{id}.xlsx → "approved".

    line 191
  19. Very specific:

    Write to logs/log.md: date, CR-ID, category, impact level, decision.

    line 192
  20. Distinctive:

    If decision is Approved → notify PM: "Change approved.

    line 193
  21. Distinctive:

    If project-plan.md and project-budget.xlsx are unavailable — analysis is based on PM data, marked "estimate — no project files"

    line 228
  22. Distinctive:

    Does not modify project-plan.md directly — only recommends running generate-project-plan after approval

    line 229
  23. Distinctive:

    Does not create Jira tasks — use coordinate-executors for that

    line 230

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Skill: generate-change-impact

Generates a change impact assessment for Phase 4 — Development (task #21). PM describes the change request; the agent classifies it, analyzes impact on timeline and budget, calculates deltas and risk level. Output: change-impact-{id}.xlsx. Mode B: agent prepares draft, PM makes the decision.


Triggers

Russian: «запрос на изменение скоупа», «оценка изменения», «влияние изменения на проект», «изменение скоупа», «CR по проекту», «оцени изменение», «изменение требований», «корректировка скоупа» English: "scope change request", "change impact assessment", "generate change impact", "change request analysis", "evaluate scope change", "change order impact"


Language Detection

Determine the language of the user's request:

  • If the request is in Russian → use templates with -ru suffix, respond in Russian
  • Otherwise → use templates with -en suffix, respond in English

Input

DataRequiredSource
Change descriptionyesPM writes in chat
Request ID (CR-001, etc.)noPM provides or agent assigns next in sequence
RequesternoPM provides or leave blank
Project planno02-planning/project-plan.md — deadlines and tasks
Project budgetno02-planning/project-budget.xlsx — budget items

Output

FileProject pathFormatDescription
change-impact-{id}.xlsx04-development/.xlsxChange impact assessment

File structure — 2 sheets (Summary, Impact Detail) — defined in templates/change-impact-{lang}.md.


Instructions

Step 1 — Validate Request

Guard-rail — check request type. If the request concerns general change management (methodology, processes) or does not describe a specific scope change → respond: "generate-change-impact assesses the impact of a specific scope change request. Describe the specific change: what needs to change, the rationale, and the expected impact. The skill will produce a structured assessment for decision-making." Do not start the workflow.

If the request contains a description of a specific change → proceed to Step 2.


Step 2 — Collect Change Request Data

Extract from chat:

  • Change description — what is changing (functionality, technology, scope of work)
  • Rationale — why the change is needed
  • ID — if PM provided one (CR-001, CR-002, etc.)
  • Requester — who initiated the change (client, team, PM, external factor)

If the change involves replacing a technology, architecture, or platform (keywords: "rewrite", "replace platform", "migrate to", "entire [component]"): Ask a clarifying question before proceeding to Step 3: "To calculate impact accurately, please clarify:

  1. Does the change affect the entire [component] or only part of it?
  2. Is the work planned in parallel with current sprint tasks or sequentially (after the current sprint)?" Do not proceed to Step 3 without an answer.

If the description is insufficient: Ask: "Please describe the change in more detail:

  1. What exactly is changing in scope (features, requirements, scope of work)?
  2. Why is this change needed?
  3. Are there any known deadline or budget constraints for this change?"

If no ID is provided: assign the next in sequence (find the last CR-XXX in 04-development/ or start with CR-001). Notify PM: "Request assigned ID: CR-001."

Change category classification: Based on the description, determine the category:

  • scope — adding or removing functionality or requirements
  • budget — change in funding without altering functionality
  • timeline — deadline shift without changing scope or budget
  • resource — replacing, adding, or removing team members

If the change affects multiple categories — assign a primary one, list the rest as secondary.


Step 3 — Read Project Data

Read project files for impact analysis:

  • 02-planning/project-plan.md — current deadlines, tasks, milestones
  • 02-planning/project-budget.xlsx — budget items and approved amounts

If files are unavailable or not found: Ask PM a clarifying question: "Files project-plan.md / project-budget.xlsx not found. For a more accurate assessment, please provide:

  1. Approximate project completion date?
  2. Approved budget (approximate amount)?
  3. Dates of the nearest key milestones (if known)? If this data is not available — I will generate the assessment based on the change description only." Use the answers in the Step 4 analysis. Mark the data source in the artifact: "data provided by PM (files not loaded)" or "estimate — no project files".

Step 4 — Impact Analysis

Analyze across four dimensions. Record each value with an explicit data source (from file or agent estimate based on PM description).

4.1 Timeline Impact

  • Identify affected tasks and milestones from project-plan.md
  • Calculate the shift in working days for each affected task
  • Determine the total shift of the final deadline (if applicable)
  • Identify critical path: does the change shift the project completion date?

4.2 Budget Impact

  • Identify affected budget items from project-budget.xlsx
  • Estimate the delta in monetary terms (absolute and %)
  • If budget data is unavailable — mark as "to be confirmed by PM"

4.3 Resource Impact

  • Determine whether additional or different team members are required
  • Specify roles and time volume (if applicable)

4.4 Risk Level and Overall Impact Level Determine the impact level using the matrix:

LevelCriteria
LowShift ≤ 5 working days, budget delta ≤ 5%, does not affect critical path
MediumShift 6–15 working days OR budget delta 6–15% OR affects critical path
HighShift > 15 working days OR budget delta > 15% OR changes architecture/core requirements

Record the final level: Low / Medium / High.


Step 5 — Confirm Data with PM

Show PM a brief impact summary in chat before generating the file:

CR-001 — [change title]
Category: [scope/budget/timeline/resource]
Timeline impact: [+X working days / "no impact"]
Budget impact: [+X / ±0 / "to be confirmed"]
Impact level: [Low/Medium/High]

Ask: "Is this data correct? Confirm or correct — I will generate the file."

Do not create the file until PM confirms.


Step 6 — Create xlsx and Save

Follow the schema from templates/change-impact-{lang}.md.

  1. Use the xlsx skill to create change-impact-{id}.xlsx.
  2. Save to {project}/04-development/change-impact-{id}.xlsx.
  3. Output in chat:
    • Confirmation: "File saved: 04-development/change-impact-{id}.xlsx"
    • Sheet 1 Summary as a Markdown table (key blocks only)
    • Question: "Assessment ready. Your decision: Approved / Rejected / Postponed? Add a comment if needed."
  4. Do not make the decision for PM — this is always the human's call.

Step 7 — Record Decision

After PM responds:

  1. Record the decision (Approved / Rejected / Postponed + date + comment) in the "PM Decision Block" of the file (if xlsx is edited) or save separately in logs/log.md.
  2. Update project-state.md: artifact change-impact-{id}.xlsx → "approved".
  3. Write to logs/log.md: date, CR-ID, category, impact level, decision.
  4. If decision is Approved → notify PM: "Change approved. To update the project plan, run generate-project-plan (task #7) using data from CR-{id}: [task shifts and budget delta]."

Templates

FilePurpose
templates/change-impact-ru.mdxlsx artifact schema (RU)
templates/change-impact-en.mdxlsx artifact schema (EN)

Dependencies

Reads:

  • Change description from chat (required)
  • 02-planning/project-plan.md — deadlines and tasks (optional)
  • 02-planning/project-budget.xlsx — budget items (optional)

Passes data to:

  • 04-development/change-impact-{id}.xlsx → generate-project-plan (#7) — on change approval, to update the project plan

Calls:

  • xlsx skill — to create the .xlsx file

Constraints

  • Mode B: assessment is a draft for PM; approval decision is always made by the human
  • One CR per invocation; for multiple CRs — run the skill separately for each
  • If project-plan.md and project-budget.xlsx are unavailable — analysis is based on PM data, marked "estimate — no project files"
  • Does not modify project-plan.md directly — only recommends running generate-project-plan after approval
  • Does not create Jira tasks — use coordinate-executors for that
  • Category classification is automatic based on description; PM can correct it at Step 5

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.