Generates a detailed project budget (project-budget.xlsx) for Phase 2 —
In this repository20 other files it gives its agents.
- coordinate-executorsSkill
- coordinate-meetingSkill
- generate-approval-letterSkill
- generate-change-impactSkill
- generate-charterSkill
- generate-checklistSkill
- generate-closure-reportSkill
- generate-comm-planSkill
- generate-comparison-tableSkill
- generate-estimateSkill
- generate-meeting-protocolSkill
- generate-plan-fact-reportSkill
- generate-project-planSkill
- generate-questionnaireSkill
- generate-resource-planSkill
- generate-response-planSkill
- generate-risk-registerSkill
- generate-stakeholder-mapSkill
- monitor-progressSkill
- send-emailSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
20 rules. About 0 are common, 14 are distinctive, and 6 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈14
Distinctive · estimate
This author's own choices. Worth a look.
6
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 33
If the request is in Russian → use templates with the -ru suffix, respond in Russian
- Distinctive: line 66
If the request contains: WBS, task decomposition, man-hours per task, work breakdown by assignee — respond: "generate-budget produces a …
- Distinctive: line 72
Do not start the workflow.
- Distinctive: line 74
Check for required files:
- Distinctive: line 132
If rates are unavailable at role level in both resource-plan.md and preliminary-estimate.xlsx, and the estimate contains only aggregated …
- Distinctive: line 136
Update rates in resource-plan.md for improved accuracy." In Sheet 3, column "Rate" — mark as "from estimate (aggregated)".
- Very specific: line 144
If data is unavailable — use default ranges from templates/project-budget-{lang}.md (§ Default Infrastructure).
- Distinctive: line 149
If GTM is in scope: take from preliminary-estimate.xlsx → Section C by phase.
- Distinctive: line 150
If GTM is not in scope: set to zero, add note "GTM is not in scope".
- Distinctive: line 159
If risk-register.md is unavailable: 10% default, add note "Risk register unavailable — standard 10% reserve applied".
- Distinctive: line 163
Constraint check: if Grand Total > Ceiling (from constraints.md):
- Distinctive: line 164
Add risk flag to Summary: "Grand Total [$X] exceeds stated budget ceiling [$Y].
- Distinctive: line 166
Do not adjust numbers to fit the ceiling.
- Very specific: line 172
Follow the schema in templates/project-budget-{lang}.md:
- Very specific: line 196
Use the xlsx skill to create project-budget.xlsx following the template schema.
- Very specific: line 205
Write to logs/log.md: date, skill, file created, grand total, reserve %.
- Very specific: line 206
Update project-state.md: artifact project-budget.xlsx status → "draft".
- Distinctive: line 242
Does not update automatically on scope changes — re-run manually via generate-change-impact
- Distinctive: line 243
Does not build a detailed WBS or calculate task-level effort — use generate-project-plan
- Distinctive: line 245
If preliminary-estimate.xlsx is unavailable — skill does not run.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Skill: generate-budget
Generates a detailed IT project budget during the planning phase (Phase 2). Reads the
preliminary estimate (preliminary-estimate.xlsx) and resource plan (resource-plan.md),
builds a line-item budget by phase and cost category. Output: project-budget.xlsx —
one baseline scenario with a contingency reserve. Mode B: agent prepares draft, PM reviews.
Triggers
Russian: «сформируй бюджет проекта», «подготовь детальный бюджет», «сделай бюджет по фазам», «бюджет проекта», «детализируй бюджет» English: "generate project budget", "create budget", "project budget", "detailed budget", "budget by phase", "budget breakdown"
Language Detection
Determine the language of the user's request:
- If the request is in Russian → use templates with the
-rusuffix, respond in Russian - Otherwise → use templates with the
-ensuffix, respond in English
Input
| Data | Required | Source |
| Preliminary estimate | yes | 01-initiation/preliminary-estimate.xlsx |
| Resource plan | yes | 02-planning/resource-plan.md |
| Project charter | no | 01-initiation/project-charter.md |
| Hard constraints | no | input/constraints.md |
| Risk register | no | 01-initiation/risk-register.md — for reserve calibration |
Output
| File | Project path | Format |
project-budget.xlsx | 02-planning/ | .xlsx |
File structure — 3 sheets (Summary, Budget Detail, Resource Detail) — defined in
templates/project-budget-{lang}.md.
Instructions
Step 1 — Check Dependencies
Guard-rail — check request type. If the request contains: WBS, task decomposition, man-hours per task, work breakdown by assignee — respond: "generate-budget produces a line-item budget by phase and cost category, not a detailed WBS. For task decomposition use generate-project-plan — it builds a plan with tasks, timelines, and assignees. Once the plan is approved, generate-budget will calculate the financial side based on the resource plan." Do not start the workflow. Do not check for files.
Check for required files:
01-initiation/preliminary-estimate.xlsx02-planning/resource-plan.md
If preliminary-estimate.xlsx is not found: Stop. Respond: "A preliminary estimate is required to generate the budget. Run the generate-estimate skill (task #4) — it will create preliminary-estimate.xlsx with baseline timeline and cost data."
If resource-plan.md is not found: Stop. Respond: "A resource plan is required to generate the budget. Run the generate-resource-plan skill (task #8) — it will create resource-plan.md with team composition, roles, and rates by phase."
If both files are found: proceed to Step 2.
Step 2 — Extract Data from Sources
From preliminary-estimate.xlsx (realistic scenario):
- Duration of each phase (weeks or months)
- Total costs by category (team, infrastructure, GTM)
- Assumptions recorded in the estimate
- Risk flags (if budget exceeds constraints)
From resource-plan.md:
- Team composition: roles, FTE allocation per phase
- Rates per role (if specified)
- Total person-months per phase
From project-charter.md (if available):
- Project name, PM, objectives
- Whether GTM is in scope — determines whether Section C is populated
From risk-register.md (if available):
- Number of HIGH-level risks → reserve calibration:
- 0–2 HIGH risks: 10% reserve
- 3–5 HIGH risks: 15% reserve
- 6+ HIGH risks: 20% reserve, add PM warning
From constraints.md (if available):
- Hard budget ceiling — record in assumptions.
Step 3 — Calculate Costs by Phase
Section A: Team (for each phase 1–6)
For each role:
Cost = FTE × Phase duration (months) × Rate ($/month)- FTE and duration: from resource-plan.md
- Rates: from resource-plan.md → if not available, from preliminary-estimate.xlsx
- If rates are unavailable at role level in both resource-plan.md and preliminary-estimate.xlsx, and the estimate contains only aggregated team costs by phase: use the aggregate as Section A total for that phase without role breakdown. Record in assumptions: "Role-level rates unavailable — aggregated data from estimate used. Update rates in resource-plan.md for improved accuracy." In Sheet 3, column "Rate" — mark as "from estimate (aggregated)".
Phase total (team) = Σ costs of all roles in the phase.
Section B: Infrastructure (for each phase)
Take data from preliminary-estimate.xlsx (realistic scenario, infrastructure row by phase).
If data is unavailable — use default ranges from templates/project-budget-{lang}.md
(§ Default Infrastructure).
Section C: Marketing/GTM (for each phase)
- If GTM is in scope: take from preliminary-estimate.xlsx → Section C by phase.
- If GTM is not in scope: set to zero, add note "GTM is not in scope".
Step 4 — Calculate Reserve and Totals
- Baseline budget = Σ (Team + Infrastructure + GTM) across all phases.
- Contingency Reserve:
- Percentage: determined in Step 2 from the risk register (10%, 15%, or 20%).
- If risk-register.md is unavailable: 10% default, add note "Risk register unavailable — standard 10% reserve applied".
- Reserve = Baseline budget × %
- Grand Total = Baseline budget + Reserve.
- Constraint check: if Grand Total > Ceiling (from constraints.md):
- Add risk flag to Summary: "Grand Total [$X] exceeds stated budget ceiling [$Y]. Recommended: revise scope, reduce team, or phase the project funding."
- Do not adjust numbers to fit the ceiling.
Step 5 — Populate xlsx Sheets
Follow the schema in templates/project-budget-{lang}.md:
Sheet 1 — Summary:
- Header: project, PM, date, version
- Assumptions (minimum 3): calculation method, data sources, rates, GTM status, reserve %
- Phase summary table: A (Team) + B (Infra) + C (GTM) = Total per phase
- "Contingency Reserve" row: % and amount
- Grand Total
- Risk flag (if budget > ceiling)
Sheet 2 — Budget Detail:
- Rows: phase → category → cost line item
- Columns: Unit | Qty | Rate | Total
- Example row: "Phase 2 | Team | Product Manager | person-month | 2 | $5,000 | $10,000"
Sheet 3 — Resource Detail:
- Rows: role
- Columns: Phase 1 | Phase 2 | ... | Phase 6 | Total (p-m) | Rate | Total ($)
- Source: resource-plan.md
Step 6 — Create xlsx and Save
- Use the xlsx skill to create
project-budget.xlsxfollowing the template schema. - Save to
{project}/02-planning/project-budget.xlsx. - Show in chat:
- Confirmation: "Budget saved as project-budget.xlsx in 02-planning/."
- Sheet 1 Summary as a markdown table.
- List of assumptions.
- Risk flags (if any).
- Next step: "Budget is ready. Review rates and team composition. Once approved by PM, use generate-approval-letter to send it for stakeholder approval."
- Write to
logs/log.md: date, skill, file created, grand total, reserve %. - Update
project-state.md: artifactproject-budget.xlsxstatus → "draft".
Templates
| File | Purpose |
templates/project-budget-ru.md | xlsx artifact schema (RU) |
templates/project-budget-en.md | xlsx artifact schema (EN) |
Dependencies
Reads:
01-initiation/preliminary-estimate.xlsx— realistic scenario (team, infra, GTM by phase)02-planning/resource-plan.md— roles, FTE, rates by phase01-initiation/project-charter.md— project name, PM, GTM scope statusinput/constraints.md— budget ceiling (if any)01-initiation/risk-register.md— for reserve calibration
Passes data to:
monitor-progress(#19) — budget deviation trackinggenerate-change-impact(#21) — scope change impact on budgetgenerate-plan-fact-report(#29) — plan vs. actual budget
Calls:
xlsx skill— to generate the .xlsx file
Constraints
- Mode B: budget is a draft for PM review, not a final document
- Single scenario (baseline) — scenario analysis is done in generate-estimate, not here
- Does not update automatically on scope changes — re-run manually via generate-change-impact
- Does not build a detailed WBS or calculate task-level effort — use generate-project-plan
- Operates on one project per invocation
- If preliminary-estimate.xlsx is unavailable — skill does not run; no fallback
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.