Generates a detailed project budget (project-budget.xlsx) for Phase 2 —

The file

Show its rules and text

We split this skill into the rules it gives an agent

20 rules. About 0 are common, 14 are distinctive, and 6 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈14

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 6

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    If the request is in Russian → use templates with the -ru suffix, respond in Russian

    line 33
  2. Distinctive:

    If the request contains: WBS, task decomposition, man-hours per task, work breakdown by assignee — respond: "generate-budget produces a …

    line 66
  3. Distinctive:

    Do not start the workflow.

    line 72
  4. Distinctive:

    Check for required files:

    line 74
  5. Distinctive:

    If rates are unavailable at role level in both resource-plan.md and preliminary-estimate.xlsx, and the estimate contains only aggregated …

    line 132
  6. Distinctive:

    Update rates in resource-plan.md for improved accuracy." In Sheet 3, column "Rate" — mark as "from estimate (aggregated)".

    line 136
  7. Very specific:

    If data is unavailable — use default ranges from templates/project-budget-{lang}.md (§ Default Infrastructure).

    line 144
  8. Distinctive:

    If GTM is in scope: take from preliminary-estimate.xlsx → Section C by phase.

    line 149
  9. Distinctive:

    If GTM is not in scope: set to zero, add note "GTM is not in scope".

    line 150
  10. Distinctive:

    If risk-register.md is unavailable: 10% default, add note "Risk register unavailable — standard 10% reserve applied".

    line 159
  11. Distinctive:

    Constraint check: if Grand Total > Ceiling (from constraints.md):

    line 163
  12. Distinctive:

    Add risk flag to Summary: "Grand Total [$X] exceeds stated budget ceiling [$Y].

    line 164
  13. Distinctive:

    Do not adjust numbers to fit the ceiling.

    line 166
  14. Very specific:

    Follow the schema in templates/project-budget-{lang}.md:

    line 172
  15. Very specific:

    Use the xlsx skill to create project-budget.xlsx following the template schema.

    line 196
  16. Very specific:

    Write to logs/log.md: date, skill, file created, grand total, reserve %.

    line 205
  17. Very specific:

    Update project-state.md: artifact project-budget.xlsx status → "draft".

    line 206
  18. Distinctive:

    Does not update automatically on scope changes — re-run manually via generate-change-impact

    line 242
  19. Distinctive:

    Does not build a detailed WBS or calculate task-level effort — use generate-project-plan

    line 243
  20. Distinctive:

    If preliminary-estimate.xlsx is unavailable — skill does not run.

    line 245

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Skill: generate-budget

Generates a detailed IT project budget during the planning phase (Phase 2). Reads the preliminary estimate (preliminary-estimate.xlsx) and resource plan (resource-plan.md), builds a line-item budget by phase and cost category. Output: project-budget.xlsx — one baseline scenario with a contingency reserve. Mode B: agent prepares draft, PM reviews.


Triggers

Russian: «сформируй бюджет проекта», «подготовь детальный бюджет», «сделай бюджет по фазам», «бюджет проекта», «детализируй бюджет» English: "generate project budget", "create budget", "project budget", "detailed budget", "budget by phase", "budget breakdown"


Language Detection

Determine the language of the user's request:

  • If the request is in Russian → use templates with the -ru suffix, respond in Russian
  • Otherwise → use templates with the -en suffix, respond in English

Input

DataRequiredSource
Preliminary estimateyes01-initiation/preliminary-estimate.xlsx
Resource planyes02-planning/resource-plan.md
Project charterno01-initiation/project-charter.md
Hard constraintsnoinput/constraints.md
Risk registerno01-initiation/risk-register.md — for reserve calibration

Output

FileProject pathFormat
project-budget.xlsx02-planning/.xlsx

File structure — 3 sheets (Summary, Budget Detail, Resource Detail) — defined in templates/project-budget-{lang}.md.


Instructions

Step 1 — Check Dependencies

Guard-rail — check request type. If the request contains: WBS, task decomposition, man-hours per task, work breakdown by assignee — respond: "generate-budget produces a line-item budget by phase and cost category, not a detailed WBS. For task decomposition use generate-project-plan — it builds a plan with tasks, timelines, and assignees. Once the plan is approved, generate-budget will calculate the financial side based on the resource plan." Do not start the workflow. Do not check for files.

Check for required files:

  1. 01-initiation/preliminary-estimate.xlsx
  2. 02-planning/resource-plan.md

If preliminary-estimate.xlsx is not found: Stop. Respond: "A preliminary estimate is required to generate the budget. Run the generate-estimate skill (task #4) — it will create preliminary-estimate.xlsx with baseline timeline and cost data."

If resource-plan.md is not found: Stop. Respond: "A resource plan is required to generate the budget. Run the generate-resource-plan skill (task #8) — it will create resource-plan.md with team composition, roles, and rates by phase."

If both files are found: proceed to Step 2.


Step 2 — Extract Data from Sources

From preliminary-estimate.xlsx (realistic scenario):

  • Duration of each phase (weeks or months)
  • Total costs by category (team, infrastructure, GTM)
  • Assumptions recorded in the estimate
  • Risk flags (if budget exceeds constraints)

From resource-plan.md:

  • Team composition: roles, FTE allocation per phase
  • Rates per role (if specified)
  • Total person-months per phase

From project-charter.md (if available):

  • Project name, PM, objectives
  • Whether GTM is in scope — determines whether Section C is populated

From risk-register.md (if available):

  • Number of HIGH-level risks → reserve calibration:
    • 0–2 HIGH risks: 10% reserve
    • 3–5 HIGH risks: 15% reserve
    • 6+ HIGH risks: 20% reserve, add PM warning

From constraints.md (if available):

  • Hard budget ceiling — record in assumptions.

Step 3 — Calculate Costs by Phase

Section A: Team (for each phase 1–6)

For each role:

Cost = FTE × Phase duration (months) × Rate ($/month)
  • FTE and duration: from resource-plan.md
  • Rates: from resource-plan.md → if not available, from preliminary-estimate.xlsx
  • If rates are unavailable at role level in both resource-plan.md and preliminary-estimate.xlsx, and the estimate contains only aggregated team costs by phase: use the aggregate as Section A total for that phase without role breakdown. Record in assumptions: "Role-level rates unavailable — aggregated data from estimate used. Update rates in resource-plan.md for improved accuracy." In Sheet 3, column "Rate" — mark as "from estimate (aggregated)".

Phase total (team) = Σ costs of all roles in the phase.

Section B: Infrastructure (for each phase)

Take data from preliminary-estimate.xlsx (realistic scenario, infrastructure row by phase). If data is unavailable — use default ranges from templates/project-budget-{lang}.md (§ Default Infrastructure).

Section C: Marketing/GTM (for each phase)

  • If GTM is in scope: take from preliminary-estimate.xlsx → Section C by phase.
  • If GTM is not in scope: set to zero, add note "GTM is not in scope".

Step 4 — Calculate Reserve and Totals

  1. Baseline budget = Σ (Team + Infrastructure + GTM) across all phases.
  2. Contingency Reserve:
    • Percentage: determined in Step 2 from the risk register (10%, 15%, or 20%).
    • If risk-register.md is unavailable: 10% default, add note "Risk register unavailable — standard 10% reserve applied".
    • Reserve = Baseline budget × %
  3. Grand Total = Baseline budget + Reserve.
  4. Constraint check: if Grand Total > Ceiling (from constraints.md):
    • Add risk flag to Summary: "Grand Total [$X] exceeds stated budget ceiling [$Y]. Recommended: revise scope, reduce team, or phase the project funding."
    • Do not adjust numbers to fit the ceiling.

Step 5 — Populate xlsx Sheets

Follow the schema in templates/project-budget-{lang}.md:

Sheet 1 — Summary:

  • Header: project, PM, date, version
  • Assumptions (minimum 3): calculation method, data sources, rates, GTM status, reserve %
  • Phase summary table: A (Team) + B (Infra) + C (GTM) = Total per phase
  • "Contingency Reserve" row: % and amount
  • Grand Total
  • Risk flag (if budget > ceiling)

Sheet 2 — Budget Detail:

  • Rows: phase → category → cost line item
  • Columns: Unit | Qty | Rate | Total
  • Example row: "Phase 2 | Team | Product Manager | person-month | 2 | $5,000 | $10,000"

Sheet 3 — Resource Detail:

  • Rows: role
  • Columns: Phase 1 | Phase 2 | ... | Phase 6 | Total (p-m) | Rate | Total ($)
  • Source: resource-plan.md

Step 6 — Create xlsx and Save

  1. Use the xlsx skill to create project-budget.xlsx following the template schema.
  2. Save to {project}/02-planning/project-budget.xlsx.
  3. Show in chat:
    • Confirmation: "Budget saved as project-budget.xlsx in 02-planning/."
    • Sheet 1 Summary as a markdown table.
    • List of assumptions.
    • Risk flags (if any).
    • Next step: "Budget is ready. Review rates and team composition. Once approved by PM, use generate-approval-letter to send it for stakeholder approval."
  4. Write to logs/log.md: date, skill, file created, grand total, reserve %.
  5. Update project-state.md: artifact project-budget.xlsx status → "draft".

Templates

FilePurpose
templates/project-budget-ru.mdxlsx artifact schema (RU)
templates/project-budget-en.mdxlsx artifact schema (EN)

Dependencies

Reads:

  • 01-initiation/preliminary-estimate.xlsx — realistic scenario (team, infra, GTM by phase)
  • 02-planning/resource-plan.md — roles, FTE, rates by phase
  • 01-initiation/project-charter.md — project name, PM, GTM scope status
  • input/constraints.md — budget ceiling (if any)
  • 01-initiation/risk-register.md — for reserve calibration

Passes data to:

  • monitor-progress (#19) — budget deviation tracking
  • generate-change-impact (#21) — scope change impact on budget
  • generate-plan-fact-report (#29) — plan vs. actual budget

Calls:

  • xlsx skill — to generate the .xlsx file

Constraints

  • Mode B: budget is a draft for PM review, not a final document
  • Single scenario (baseline) — scenario analysis is done in generate-estimate, not here
  • Does not update automatically on scope changes — re-run manually via generate-change-impact
  • Does not build a detailed WBS or calculate task-level effort — use generate-project-plan
  • Operates on one project per invocation
  • If preliminary-estimate.xlsx is unavailable — skill does not run; no fallback

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.