weekly-planner
Skill0 starsChanged 31 days agoMITView on GitHub
Plans Glody's upcoming week end to end: reconciles last week's plan against what actually happened (done/partial/not touched, from agent sessions of every indexed agent and direct fact-check), collects state (tasks, projects, quarterly — including the yearly plan's current-quarter section, email, recent agent sessions, calendar), weighs and prioritizes every commitment, writes the collected state and the proposed focus into the week's note, and STOPS at a human gate before touching the calendar. Only after explicit approval does it apply the plan to the calendar and mark the focus as confirmed. Use this skill when the user says "pianifichiamo la settimana", "/weekly-planner", "pianificazione settimanale", "prepara la settimana", or when the Monday planning routine fires. Complements planning-review-system (backward-looking weekly review) and time-energy-manager (daily execution): weekly-planner looks forward across the whole week. Works with any task database, calendar, and email MCP, or in chat-only mode. Do NOT use for a single-day plan (use time-energy-manager) or a retrospective weekly review (use planning-review-system).
1 other project uses a version of this.
Adopted by
Most recently taken up by
- GTMify/aigtmtheir own version, first seen May 25, 2026
Other versions1 project uses a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 1
- GTMify/aigtm★ 25same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository15 other files it gives its agents.
- CLAUDE.mdCLAUDE.md
- agent-teams-playbookSkill
- bash-portability-linterSkill
- bnb-academy-distillSkill
- document-collectorSkill
- forfettario-tax-calculatorSkill
- java-spring-clean-codeSkill
- pa-data-vaultSkill
- pa-form-fillerSkill
- pa-legal-clause-analyzerSkill
- planning-review-systemSkill
- portable-local-routineSkill
- quick-captureSkill
- session-retrospectiveSkill
- time-energy-managerSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
28 rules. About 0 are common, 14 are distinctive, and 14 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈14
Distinctive · estimate
This author's own choices. Worth a look.
14
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 22
If a config file exists: read task_tool, calendar_tool, notes_tool, and email_tool from the frontmatter, plus vault_path when notes_tool = …
- Very specific: line 27
If NO config file exists: run the same mini-setup as planning-review-system / time-energy-manager (auto-detect tools, ask language + tools …
- Distinctive: line 37
Default target = the week starting the next Monday (or the current week if invoked Mon-morning).
- Distinctive: line 60
any other exit, or the venv is missing: stop and report the output.
- Distinctive: line 84
Before gathering new material, reconcile the previous plan against what happened.
- Very specific: line 103
Run collect first: the LaunchAgent runs it once a day, so today's sessions are missing otherwise.
- Very specific: line 117
If the aggregator is missing or the command fails, say so in the note and fall back to scanning ~/.claude/projects/*/*.jsonl (closing turns …
- Distinctive: line 195
Do not make everything a 2h busy block: it falsifies the 4h count.
- Very specific: line 222
Planning rules file (read it before weighing anything): If <vault_path>/areas/glody/procedure/regole-di-pianificazione.md exists, it …
- Distinctive: line 236
If a valuable event does not fit this week by priority or space, move it to next week (a real date).
- Very specific: line 247
Never two COGNITIVE blocks back-to-back — alternate cognitive ↔ handoff/physical/light.
- Distinctive: line 302
Never stop at listing a problem: each one comes with a next action, and anything answerable from mail, chats, logs or files is looked up, …
- Distinctive: line 315
Wait for explicit approval: Do NOT proceed to Phase 4 on anything less than a clear OK.
- Distinctive: line 316
If Glody asks for changes, revise Phase 2/3 and re-present the gate.
- Distinctive: line 327
Only after explicit approval:
- Very specific: line 331
Use calendar_id from config (same calendar read in Phase 1).
- Very specific: line 341
Do NOT notify attendees (sendUpdates: none).
- Very specific: line 344
If calendar_tool = none: skip calendar export.
- Distinctive: line 355
If Glody asks for changes before the OK, update the proposal in the note too, then re-present the gate.
- Distinctive: line 385
Commit + push the note and the Decision YAML after confirming the focus (only those two files, plus the learning-signal files if they …
- Very specific: line 397
Read <vault_path>/.brain/weekly/<target Monday>-weekly.md.
- Distinctive: line 402
If the focus is already confirmed (the Decision YAML says so), do nothing and say so.
- Very specific: line 414
Write the plan only into the five fixed sections of the vault's rhythm contract (<vault_path>/.brain/system/schema/ritmi.md):
- Distinctive: line 438
No external send happens here: email and messages stay drafts.
- Very specific: line 441
Write tool, frontmatter doc_type: log, created/updated = today, week: <ISO week>, then the same five fixed sections and the extras.
- Very specific: line 444
If
notes_tool = notion: create/update the week's page under output_page_url with the same sections. - Very specific: line 451
Every piece of feedback Glody gives on the planner becomes one row of an append-only log.
- Distinctive: line 472
Do not force a class to make it count.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Weekly Planner
Forward-looking weekly planning in 4 phases. Collects the week's state, weighs every
commitment, proposes a plan, gates on human approval, then applies it. A facade: it
reuses planning-review-system's collect and time-energy-manager's calendar-export
pattern, and writes the weekly plan as plain markdown. Its few helpers live in the vault
(consuntivo-check, agent_activity, learning_signal, confirm_decision).
Principle: a full calendar is not a planned week. Weigh every event, or you are just filling holes.
Config Guard
Config lookup: open and follow _shared-refs/config-lookup.md (or ../_shared-refs/config-lookup.md when running from the synced plugin copy).
If a config file exists: read task_tool, calendar_tool, notes_tool, and
email_tool from the frontmatter, plus vault_path when
notes_tool = vault_filesystem. These decide MCP vs conversational fallback. Read also
work_morning_block and work_afternoon_block (the only work fascia, used in Phases 2-4).
If NO config file exists: run the same mini-setup as planning-review-system /
time-energy-manager (auto-detect tools, ask language + tools + schedule, save to
~/.claude/life-os.local.md). Never hardcode database IDs, field names, or schedule times.
Language
See _shared-refs/language.md (or ../_shared-refs/language.md in the synced copy).
The week being planned
Default target = the week starting the next Monday (or the current week if invoked Mon-morning). Confirm the Monday date with the user in one line before Phase 1 if ambiguous. All dates below use that Monday as the anchor.
Phase 0 — Open the week's note (FIRST step, before anything else)
The week's note must exist on disk whether or not Glody ever answers the gate: a plan only in the chat is lost when the session goes idle (validated 2026-10-09: 8 Monday runs out of 12 waited for an OK that never came and left no file, because the note was written in Phase 4).
If notes_tool = vault_filesystem and the directory <vault_path>/.brain/system/vault_lint/review/
exists (the vault's rhythm chain, contract in <vault_path>/.brain/system/schema/ritmi.md):
PYTHONPATH=<vault_path>/.brain/system <vault_path>/.brain/system/.venv/bin/python \
-m vault_lint.review apri <vault_path> --date <target Monday>- exit 0: the command created the levels that were due (the week's note, and the monthly or quarter drafts if missing) and printed their paths. Work on those files.
- exit 2: the week's note already exists and nothing else is due. Work on that file.
- any other exit, or the venv is missing: stop and report the output. Do not create the note by hand.
Then run … -m vault_lint.review stato <vault_path> (read-only) and keep its signals
for Phase 3. If the command opened a monthly or quarter draft, say so in Phase 3: those
levels follow <vault_path>/areas/glody/procedure/revisione-ritmi.md, not this skill.
The note is <vault_path>/.brain/weekly/<target Monday>-weekly.md. Never overwrite it
or rewrite its frontmatter: edit sections in place (see "Writing into the note").
Then run conta and act on its verdict ("Learning signal" below).
Otherwise (no rhythm chain, or notes_tool is not the vault): skip Phase 0; the note
is written in Phase 3 as described under "Writing into the note".
Phase 1 — Collect
Gather everything the week's plan depends on. Skip any source whose tool is none.
(This phase reuses the read logic of the sibling life-os skills; if they aren't loaded,
the steps below are self-contained enough to run directly.)
Phase 1a — Consuntivo (runs first in Phase 1, before collecting anything new)
Before gathering new material, reconcile the previous plan against what happened. Skipping this is how commitments quietly vanish (validated 2026-07-27: "prenota appuntamento INPS" sat as a reminder in the 2026-07-20 plan and was never done).
- Read last week's plan:
<vault_path>/.brain/weekly/<last-monday>-weekly.md, its## Focus settimanafirst (older notes: Golden Rule and priorities): the commitment list to check against reality. If last week has no note, take the most recent one and say how many weeks are missing. - Read last week's diary first (
.brain/weekly/<last-monday>-diario.md, seereferences/diario.md): the aggregator below is then needed only for the days it leaves open. Then read the week's agent sessions through the aggregator (all agents it indexes: Claude Code local, Cursor, and the git-based cloud adapters), never by guessing from file dates. Whennotes_tool = vault_filesystemand<vault_path>/.brain/system/agent_activity/exists:
RunV=<vault_path> PYTHONPATH=$V/.brain/system $V/.brain/system/.venv/bin/python -m agent_activity.collect --vault $V PYTHONPATH=$V/.brain/system $V/.brain/system/.venv/bin/python -m agent_activity.query \ --vault $V --since <start of last week, ISO UTC>collectfirst: the LaunchAgent runs it once a day, so today's sessions are missing otherwise. The query returnssessions(id, agent, project, title, turns,closing_excerpt,source_path),collector_staleness_daysandwarnings.- For every session judge delivery from
closing_excerpt(where completion/handoff is usually declared). File mtimes are not evidence: files get touched without new work (validated 2026-10-13), and work can be delivered the same day a source file was last touched (validated 2026-07-27). - An empty
closing_excerpt(cloud/git sessions, or not collected) is reported as "estratto assente", never silently skipped and never replaced by a guess. - Drill down: for each session whose title or excerpt touches an open commitment
from step 1, or that has no usable excerpt, open the transcript at
source_pathand read the part that matters (search the commitment's keywords, then read around the hits). The excerpt is the map, the transcript is the evidence. - Report
collector_staleness_dayswhen it isnullor above 3. - If the aggregator is missing or the command fails, say so in the note and fall back
to scanning
~/.claude/projects/*/*.jsonl(closing turns of each session in the window), stating that Cursor and cloud sessions were not covered. - Cite what you used in
## Consuntivoassessione:<first 8 chars of the session_id>next to each judgment (see Phase 3: the gate refuses a Consuntivo with no citation).
- For every session judge delivery from
- Reconcile line by line: for each commitment in last week's plan, mark DONE / PARTIAL / NOT TOUCHED, with the evidence (session excerpt, commit, or file) — not an assumption. If a commitment turns out already resolved by direct fact-check (e.g. the user states it plainly), trust the direct statement over inferred session evidence.
- Surface unresolved captures: any reminder, idea, or task that appeared last week and was neither done nor explicitly dropped rejoins this week's raw material as an open item to place or discard — it does NOT get silently deferred to an undefined "retro" that has no calendar slot. If it implies real money or a hard consequence (a call to book, a cancellation with a window), it becomes a calendar event, not a reminder — a reminder with no slot is how it gets missed twice.
- Check predicted load vs actual load: for each commitment marked DONE or PARTIAL,
compare the load type it was weighed as (Phase 2, attribute 3) with what the session
evidence shows it took. Flag a commitment predicted as light/handoff that turned out
cognitive-heavy with no deliverable (validated 2026-07-27: a cashflow session weighed as
a build produced design reasoning but no code, and Glody called it "tempo buttato").
One line per mismatch, feeding Phase 3's report; a mismatch repeated across weeks on the
same recurring commitment is surfaced explicitly. Register each one as a learning-signal
row (
registra --origine consuntivo --classe carico-stimato-male --fase 2, see "Learning signal");--testois Glody's words if he named it, else the mismatch line with the commitment and the week.
Output of this sub-phase: a short reconciliation summary (what was done, what wasn't, what re-enters as open, and any load mismatch) — feeds directly into Phase 3's report.
Phase 1b — New material
- Tasks / projects / quarterly (
task_tool): reuse planning-review-system's collect: open tasks with due dates, active projects and their status, quarterly goals and progress, fromtask_toolper config. If<vault_path>/.brain/system/piano-annuale-<year>.md(or equivalent) exists, read the current quarter's section from there: it is the source of truth for quarterly goals, not the Notiongoals_page_urlfallback. Read also## Priorità del mesefrom<vault_path>/.brain/monthly/<YYYY-MM>-monthly.md: each focus of the week must serve one of those priorities. - Email (
email_tool): scan the last 7 days (configemail_scan_labels, default INBOX; applyemail_exclude_patterns). Extract only actionable items with a date or a decision — not newsletters. - Calendar (
calendar_tool): read every event already on the target week. These are existing commitments — they get weighed too (Phase 2), not just worked around. - Open deadlines (deadlines other systems keep in their own files: project MOCs,
pricing-agent proposals; vault only): run
PYTHONPATH=<vault_path>/.brain/system <vault_path>/.brain/system/.venv/bin/python -m vault_lint.review scadenze <vault_path> --date <target Monday> --giorni 21 --json. Every row inscadenze(overdue included) is a hard deadline candidate: weigh it in Phase 2 and list it in Phase 3's "Hard deadlines of the week" with its Rome time; report everyproblemientry. Exit 2 = bad arguments. - Recent agent sessions: query the aggregator again with
--since <2 weeks ago>(same command, staleness rule and fallback as Phase 1a) to surface threads still open (a build mid-flight, a deferred follow-up) that deserve a slot this week. Use metadata andtitle_or_first_messageto spot open threads, not to judge delivery. - Future directions (
<vault_path>/areas/glody/knowledge/direzioni-future.md, if it exists): for each direction, is there a new real signal this week (an email, a session, a contact)? Is any direction dead, or is a new one emerging from what Glody said? Pick at most one item from its Radar section that could get a small slot this week. Report proposed edits to the file in Phase 3; never edit directions without Glody's OK.
Output of Phase 1 is raw material plus the reconciliation summary, not yet a plan. Do not schedule anything here.
Phase 2 — Weigh & Prioritize (the core)
This is the phase that makes the difference. Apply the weighing discipline to every event — the ones you'd create, the ones already on the calendar from Phase 1, AND the unresolved captures surfaced by Phase 1a's reconciliation. An open item from last week is not automatically high priority just because it's old — weigh it like anything else.
Weigh each event by five attributes, declared before placing it:
- Nature — BLOCK (occupies real time,
busy, counts toward the 4h/day: "in that slot I'm doing this") vs REMINDER (no time,free/all-day, sits at the top of the day: "remember that"). There's a middle: a reminder that still implies a short task → occupies space but with a lighter specific weight (short block, not a 2h focus wall). Do not make everything a 2h busy block: it falsifies the 4h count. - Glody-time, not machine-time — the load is measured on Glody's attention-hours (supervision + checkpoint decisions), NOT the total execution time. A job that is big in execution-hours (e.g. building a skill: design+TDD+code = 6-8h) can be LIGHT for Glody if it's assisted: he approves the design (~30min), the code is HANDOFF to a subagent (he approves output ~15min) → his real time ~1-1.5h scattered. Always separate machine-time (mine + subagent, runs while Glody does other things) from Glody-time (checkpoints) and weigh the event ONLY on the second.
- Load type — delegated (a person or an agent owns it end to end; Glody only spends the 10-15 minute checkpoint) vs handoff (an LLM carries it with little supervision: a message, an extraction, a routine to launch, the code part of an assisted build) vs cognitive (Glody must be present and focused: approving a design, a strategic decision) vs physical/out-of-house (an errand). A project decomposes into phases of different load: weigh each phase, not the whole project.
- Real weight / priority — hard deadline? legal/economic consequence? or deferrable?
- Where — at the desk / out / with people.
The judgment is yours to make, but when genuinely in doubt about an event's nature or weight, ask Glody instead of guessing. A targeted question beats a wrong classification.
The two work fascia — ONLY two, distinct, read from the config, never typed here:
work_morning_block and work_afternoon_block in the life-os config; the day's cap is
daily_work_cap_hours, read from the config, never the sum of the fasce. Read them in the Config Guard and use them everywhere below ("the
morning fascia", "the afternoon fascia"); if a key is missing, ask Glody instead of assuming.
The time between and outside them is NOT work time — it is life, not "free holes to fill".
Never place a work event outside these two fascia: two separate islands, not one block.
Planning rules file (read it before weighing anything). If
<vault_path>/areas/glody/procedure/regole-di-pianificazione.md exists, it overrides the
defaults below for: the execution tiers, the DoD requirement, the capacity target
and the one-theme-per-day rule. The axes are the ordered ## Priorità del mese of the
current monthly note (<vault_path>/.brain/monthly/<YYYY-MM>-monthly.md), not a separate
list. Apply the file as written: axes are the main ones, not the only
ones, and an urgent or deadline item outside any axis is still done, with no hour cap.
Delegated work still costs Glody 10-15 minutes of checkpoint. An activity with no DoD is
not placed: propose one and let Glody approve it. List, in the report, every activity that
is delegable together with the prep-run that would prepare it the day before. If the file
is missing, use the defaults below.
Default capacity (when the rules file is missing): fill the 4 hours inside the two fascia. The cap is also a target, and there is no "park it outside the fascia" shortcut. If a valuable event does not fit this week by priority or space, move it to next week (a real date); if it has no value, delete it. Deferrable meta-tooling that clutters the view moves to next week too.
Ordering (with the rules file: its tiers, then its axes as tie-break inside a tier; without it, the defaults here):
- Sort by hard deadline first (legal/economic consequences lead).
- Then by the week's Golden Rule (the single "priority of priorities").
- Group by theme: one theme per day when possible, delegated runs included. Fixed events that cannot move (a loop with a dependency) stay; say so and put their checkpoint at the start of the fascia.
- Never two COGNITIVE blocks back-to-back — alternate cognitive ↔ handoff/physical/light. Handoff work an LLM can carry doesn't compete for focus; cognitive work is isolated and protected. With one theme per day the alternation happens inside the theme.
Produce, for the whole Mon-Fri grid: which event goes in which fascia on which day, each with a one-line weighing (Glody-time + load type), respecting the rules above.
Phase 3 — Report + GATE (handoff stop)
First write the week's note (see "Writing into the note" below): the collected state and the proposed focus, marked as a proposal. This is local and reversible, and it is what survives if the gate is never answered. Then run the evidence check on the note:
PYTHONPATH=<vault_path>/.brain/system <vault_path>/.brain/system/.venv/bin/python \
-m vault_lint.review consuntivo-check <vault_path> --date <target Monday>Exit 0 = ## Consuntivo cites at least one real session (sessione:<8 chars> found in
the aggregator index). Any other exit = Phase 1a step 2 was not done: go back and do it,
then rewrite ## Consuntivo. Do not present the gate until the check passes. Only when
the aggregator has no sessions at all in the window, the section may carry the explicit
token sessioni:nessuna.
Then commit + push only the note, plus the learning-signal files if they changed (vault: the default branch, see the vault's git rules). Present a readable plan and STOP: do not touch the calendar and do not mark the focus as confirmed yet.
Structure of the report:
- Consuntivo settimana scorsa — from Phase 1a: what was done, what was partial, what was not touched, each with its evidence. Unresolved captures list explicitly what they're becoming this week (a placed event, a dropped item) — never "we'll look at it in retro" when no retro ritual actually owns that slot. Include any load mismatch flagged in Phase 1a step 5 (predicted handoff/light, actual cognitive/heavy or vice versa) — one line each, not a full audit.
- Hard deadlines of the week (dated, with consequence).
- Golden Rule of the week (the one priority of priorities, highlighted first).
- Priorities, ordered by the Phase 2 sort (P1..Pn with a one-line why each).
- Mon-Fri grid — for each fascia (the two blocks from the config), the event placed there with its one-line weighing (Glody-time + load type). Show the reasoning, not just the grid.
- Calendar proposal in ASCII (always, with every presentation of the plan) — a
Mon-Fri grid with the two fascia from the config as rows, built from the same list
Phase 4 will write, so what Glody approves is what gets created. Mark each cell:
[=]already on the calendar (not touched),[+]Phase 4 will create it,[~]an existing event Phase 4 would change (say what changes and why), and.free. Under the grid list every[+]and[~]with title, day, start-end,busy/free. Show it also when the gate is re-presented by "Resume the gate", after re-reading the calendar. - Cognitive vs handoff count — blocks per load type (Phase 2 attribute 3), as a plain number, to show whether the week leans cognitive or handoff.
- Prep-runs (always, proactive) — for every cognitive block and every delegable
activity, the one-shot delegated run that prepares it the day before: what it produces,
its DoD, when it fires (weekday, before the block). Mark them
(p)in the ASCII grid, and each work-item loop (prompt path, fire time, gates;references/work-item-loops.md)(L). Never stop at listing a problem: each one comes with a next action, and anything answerable from mail, chats, logs or files is looked up, not asked. - Actionable emails (from Phase 1, with the action + date).
- Conflicts / notes — anything that didn't fit, moved to next week, or needs a Glody
decision, plus the
review statosignals from Phase 0. - Where the note is — the path of the week's note just written.
Then end with an explicit gate line:
"Questo è il piano, già scritto come proposta in
<path della weekly>. Dimmi OK per applicarlo al calendario e confermare il focus, oppure dimmi cosa cambiare. Se vuoi: cosa ti è sfuggito o ho pesato male?"
Wait for explicit approval. Do NOT proceed to Phase 4 on anything less than a clear OK. If Glody asks for changes, revise Phase 2/3 and re-present the gate.
Each change Glody asks for at the gate, and each answer to the optional question, is
feedback: classify it and registra it with --origine gate before revising (see
"Learning signal"). If the OK comes and no change was asked during the whole gate,
register one neutral row (--esito identica).
Phase 4 — Apply (only after OK)
Only after explicit approval:
Calendar export
MANDATORY when calendar_tool != none. Reuse time-energy-manager's Step 4.5 pattern:
- Use
calendar_idfrom config (same calendar read in Phase 1). Optionally ask if a different calendar is wanted. - Idempotent: list the target week's events first. Skip a planned block when an event
with the same title and the same fascia already exists (a resumed gate must never
duplicate events). For each planned block NOT already a calendar event (skip events
that came from the calendar in Phase 1 — they already exist), create an event:
- Title: block name (e.g. "Deep Focus: [task]", "Handoff: [routine]", "Reminder: [x]").
- Start/End: the fascia times from the plan.
- Description: brief context (priority, load type).
- Nature: BLOCK →
busy; REMINDER →free/all-day. - Do NOT notify attendees (
sendUpdates: none).
- Confirm: "Fatto — [N] blocchi aggiunti al calendario."
If calendar_tool = none: skip calendar export.
Prep-runs and work-item loops
The OK covers the prep-runs and the (L) loops in the report: each loop is a one-shot weekday
task launching a versioned /loop prompt, linked from its event (references/work-item-loops.md).
Confirm the focus in the note
Edit ## Focus settimana in the week's note: replace the proposal marker with the
focus Glody approved (with his changes, if any). Touch only that section and the
updated: date in the frontmatter.
If Glody asks for changes before the OK, update the proposal in the note too, then re-present the gate.
Record the Decision
review stato and the briefing do not read the note: they read the confirmed Decision
YAML of the current ISO week (read_confirmed_focus). Editing only the note leaves them
saying "focus non confermato" after a real OK. So write the Decision too:
PYTHONPATH=<vault_path>/.brain/system <vault_path>/.brain/system/.venv/bin/python - <<'EOF'
from pathlib import Path
from vault_lint.focus import confirm_decision
week = "<ISO year>-W<ISO week>" # e.g. 2026-W42
focus = [("<slug of focus 1>", "<label of focus 1>")] # the approved items, max 3
confirm_decision(
Path("<vault_path>"), f"week-{week}",
decision_override={
"horizon": "week", "arco_id": week,
"focus": [{"ref": r, "label": l, "tempo": None} for r, l in focus],
"delega": [], "lascia": [], "refs": [r for r, _ in focus],
},
)
EOFIt writes .brain/system/decisions/focus-week-<week>.yaml with status: confirmed; it
refuses an empty focus. Then run review stato <vault_path>: it must now say the focus
is confirmed. If it does not, say so instead of reporting success.
Commit
Commit + push the note and the Decision YAML after confirming the focus (only those two files, plus the learning-signal files if they changed).
Resume the gate (any later session)
The note and its commit exist before the gate on purpose, so the gate survives an idle or closed session. A later session resumes it from the note, without redoing Phases 1-2:
- Trigger: "ok weekly", "applica la weekly", "riprendi la weekly", or the briefing
signal
focus della settimana non confermato. - Read
<vault_path>/.brain/weekly/<target Monday>-weekly.md. If## Focus settimanastill carries the proposal marker ("da confermare"), re-present the Phase 3 report from the note (re-read the calendar for the week first: it may have changed, and say what changed), wait for the OK, then run Phase 4. Phase 4 is idempotent, so a repeated resume is safe. - If the focus is already confirmed (the Decision YAML says so), do nothing and say so.
Writing into the note
If notes_tool = vault_filesystem: the note is
<vault_path>/.brain/weekly/<target Monday>-weekly.md (filename = the Monday date,
never ISO YYYY-Www). Phase 0 created it, or it already existed: read it first and
edit sections in place with the Edit tool. Never overwrite the file, never rewrite its
frontmatter (only bump updated:), never delete what a person wrote there.
Write the plan only into the five fixed sections of the vault's rhythm contract
(<vault_path>/.brain/system/schema/ritmi.md):
## Consuntivo— from Phase 1a: done / partial / not touched, with evidence, where each unresolved capture landed this week, and load mismatches (one line each).## Calendario— from Phase 1b: the week's events and hard deadlines (dated, with consequence), and what the next two weeks already hold.## Appunti della settimana— open captures and inbox items, each with a proposed title and folder. Keep what the command pre-filled; add, do not duplicate.## Progetti da guardare— projects past deadline, stalled, or without a goal, each with the suggested action.## Focus settimana— at most three items, eachN. <focus> — serve: <priorità del mese>; the first one is the week's Golden Rule. Before the gate the section opens with a proposal line: keep the onereview apripre-fills ("Proposta dalle priorità del mese …, da confermare …"), or writeProposta del <date>, da confermare:if there is none. Replace the pre-filled items, do not append a second list. Phase 4 replaces the proposal line once Glody approves.
Extra sections are allowed after the fixed ones, for what the contract does not cover:
## Griglia Lun-Ven (name the two fascia with the times read from the config) with one
weighing line per event followed by the same ASCII calendar proposal shown in the report,
## Bilancio cognitive/handoff, ## Email azionabili, ## Segnalazioni / conflitti.
Priorities are written only in ## Focus settimana, never in an extra section.
No external send happens here: email and messages stay drafts.
If the rhythm chain does not exist (Phase 0 skipped): create the note with the
Write tool, frontmatter doc_type: log, created/updated = today, week: <ISO
week>, then the same five fixed sections and the extras.
If notes_tool = notion: create/update the week's page under output_page_url with
the same sections. If notes_tool = none: present the plan in chat as formatted markdown.
Learning signal
Every piece of feedback Glody gives on the planner becomes one row of an append-only log;
the counts decide what this skill adapts to. Vault only: needs
<vault_path>/.brain/system/learning_signal/weekly.py (README next to it), else skip. Run
PYTHONPATH=<vault_path>/.brain/system <vault_path>/.brain/system/.venv/bin/python -m learning_signal.weekly <command>.
Register: whenever Glody gives feedback on the planner, at any point (the gate, the retro, a later chat, another session), register it before moving on. One row per request, not per message and not per section touched: split a message that carries two requests.
… registra --origine gate|retro|consuntivo --classe <class> --fase 0|1a|1b|2|3|4 \
[--fonte <source>] --testo - <<'EOF'
<his words, verbatim>
EOF--testo - reads the heredoc verbatim: apostrophes ("l'hai") break --testo='…'.
- Classes (closed list):
fonte-mancata(a source was not read; add--fonte sessione|mail|calendario|nota|scadenza|altro),peso-sbagliato,scadenza-mancata,carico-stimato-male,fascia-sbagliata,troppo-lungo,formato;altronever counts. Do not force a class to make it count. --faseis the phase whose output was wrong. A gate approved with no change:registra --origine gate --esito identica.- Exit 2 = refused, the reason is on stderr. "already registered" means the same gesture is already in the log: nothing to do.
Read (Phase 0): … conta returns adatta, promuovi, richieste, problemi.
adatta(same place and class at least 3 times): read those rows'testo_origand apply the correction in that phase during this run; say it in ONE line in the report.adattaempty: change nothing and say nothing about the signal.promuovi(at least 5 times over at least 14 days): propose to Glody, in the Phase 3 report, the edit to this skill that would make the correction permanent. Never edit the skill yourself. Once proposed, add"<dove>:<classe>"to the JSON list insuggeriti.jsonnext to the log (create it if missing), so it is not proposed again.probleminot empty (exit 1): name them in one line and go on. Never rewrite past rows. If the command fails, plan without adaptation and say so in one line.
The log and suggeriti.json are versioned: commit them with the run's next commit.
Trigger Mapping
- "pianifichiamo la settimana" / "prepara la settimana" → full run, Phases 0-4.
- "/weekly-planner" → full run.
- "ok weekly" / "applica la weekly" / "riprendi la weekly" → "Resume the gate" section.
- Monday planning routine → full run (the routine is a 3-line trigger, all logic is here).
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.