change-request
Skill2 starsChanged 6 months agoMITView on GitHub
ITIL change request and CAB review workflow. This skill should be used when the user asks to "create a change request", "write an RFC", "plan a change", "CAB review", "change management", "schedule maintenance", "server migration plan", "upgrade plan", "AI model deployment", "GitOps change", or describes any planned modification to IT infrastructure or services. Produces a complete RFC document following ITIL v5 Change Enablement.
6 other projects use a version of this.
Adopted by
Most recently taken up by
- nisarth/claude-skills-storetheir own version, first seen Nov 8, 2026
- danielvm-git/bigpowerstheir own version, first seen Nov 6, 2026
- Lwhieldon/claude-project-mgmt-playbooktheir own version, first seen Oct 13, 2026
- anthropics/knowledge-work-pluginstheir own version, first seen Oct 13, 2026
- aygp-dr/standard-changetheir own version, first seen Sep 16, 2026
- kenmulford/PMSkillstheir own version, first seen Apr 19, 2026
Other versions6 projects use a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 6
- anthropics/knowledge-work-plugins★ 35ksame name
- danielvm-git/bigpowers★ 288same name
- Lwhieldon/claude-project-mgmt-playbook★ 4same name
- nisarth/claude-skills-store★ 1same name
- aygp-dr/standard-change★ 0same name
- kenmulford/PMSkills★ 0same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository8 other files it gives its agents.
- ai-changeSkill
- commsSkill
- done-opsSkill
- incidentSkill
- itilSkill
- postmortemSkill
- problemSkill
- statuspageSkill
The file
We split this skill into the rules it gives an agent
7 rules. 0 are common, 6 are distinctive, and 1 is very specific to this project.
0
Common
Most of the 6 edited versions we read keep these.
6
Distinctive
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 36
Default output directory: ./changes/.
- Distinctive: line 38
All change request documents are written in English.
- Distinctive: line 98
MUST include the risk assessment table in the RFC with this exact format.
- Distinctive: line 114
Create the change request file.
- Distinctive: line 221
Verify all required sections are complete:
- Distinctive: line 238
Always ask about blackout windows — some organizations have change freezes around releases, holidays, or fiscal close
- Distinctive: line 240
If the change was triggered by an incident, link the incident ID
“Common” is measured: kept by at least 6 in 10 of the 6 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Change Request Workflow
Structured change management following ITIL 4 Change Enablement. Produces a complete RFC (Request for Change) document that serves as both the change plan and the CAB review submission.
Related Skills (auto-loaded)
- itil — change types (Standard/Normal/Emergency), CAB process, risk assessment matrix
- done-ops — verification gate before finalizing the change
Output
File: {OUTPUT_DIR}/change-request-{YYYY-MM-DD}-{slug}.md
- slug: lowercase kebab-case summary, e.g.
exchange-upgrade,ad-entra-migration - Change ID (
CHG-{YYYYMMDD}-{NNN}):{NNN}is a daily sequence number starting at 001. If the organization uses a ticketing system, use that system's ID instead.
Default output directory: ./changes/. If a docs/changes/ directory exists in the project, use that instead. Ask the user if neither exists. A user-specified path takes precedence over all defaults.
All change request documents are written in English. Before writing to file, preview the content for the user in their preferred language.
Workflow
Step 1: Gather Change Details
Collect the following from the user (use AskUserQuestion for missing items):
| Field | Required | Example |
| What is being changed? | Yes | "Upgrade Exchange Server 2019 to 2022" |
| Why is this change needed? | Yes | "End of support, security compliance" |
| Which systems/services affected? | Yes | "Email service, Active Directory" |
| Expected downtime? | Yes | "4-hour maintenance window" |
| Proposed schedule? | Yes | "Saturday 02:00-06:00" |
| Who will implement? | Yes | "IT Infrastructure team" |
Step 2: Classify the Change
Determine the change type using the itil skill:
| Question | Standard | Normal | Emergency |
| Is this a routine, pre-approved procedure? | Yes → Standard | No | No |
| Is there a documented SOP for this? | Yes → Standard | Maybe | No |
| Is this time-critical (active incident)? | No | No | Yes → Emergency |
| Otherwise | — | → Normal | — |
Clarification: Compliance deadlines or business mandates with hard dates are Normal changes (with appropriate urgency), not Emergency. Emergency is reserved for active incidents or immediate security threats requiring same-day implementation.
AI / ML System Changes: If the change involves any AI or ML component (model update, prompt change, training data, RAG index, AI autonomy scope), load
itil/references/change-enablement.mdand follow the "AI / ML System Changes" section. Changes involving Cognition or Coordination capabilities require Normal (Significant) classification at minimum.
GitOps / IaC Changes: Changes delivered via pull request and automated pipeline may qualify as Standard if they meet pre-authorization criteria. See
itil/references/change-enablement.md→ "GitOps / IaC Change Pattern".
For Normal changes, further classify risk level:
- Minor: Low risk, Change Manager approval sufficient
- Significant/Major: Requires full CAB review
Step 3: Risk Assessment
Rate each dimension 1-3, multiply for Risk Score:
Impact (if change fails):
- 3 = High: critical service outage, data loss risk
- 2 = Medium: degraded service, limited users affected
- 1 = Low: minimal/no user impact
Likelihood (of failure):
- 3 = High: untested procedure, complex dependencies
- 2 = Medium: tested in non-prod, moderate complexity
- 1 = Low: routine procedure, well-documented, previously successful
| Risk Score | Level | Authorization |
| 7-9 | High | Full CAB + management approval |
| 4-6 | Medium | CAB review recommended |
| 1-3 | Low | Change Manager approval |
MUST include the risk assessment table in the RFC with this exact format.
Sustainability note: If the change involves significant compute (AI model deployment, server provisioning >10 units, cloud region migration), add the optional Sustainability assessment from
itil/references/sustainability.mdto the Risk Assessment section.
| Dimension | Rating | Justification |
|---|---|---|
| Impact (if failure) | {1-3} | {Reason} |
| Likelihood (of failure) | {1-3} | {Reason} |
| **Risk Score** | **{N}** | **{Low/Medium/High}** |Present the assessment to the user for validation.
Step 4: Build the RFC Document
Create the change request file. MUST follow this exact structure — do not rearrange or rename sections:
# Request for Change: {TITLE}
| Field | Value |
|---|---|
| Change ID | CHG-{YYYYMMDD}-{NNN} |
| Change Type | Standard / Normal / Emergency |
| Risk Level | {Low / Medium / High} (Score: {N}) |
| Status | Draft |
| Requester | {NAME} |
| Date Submitted | {YYYY-MM-DD} |
| Proposed Window | {DATE TIME} to {DATE TIME} ({TIMEZONE}) |
## Business Justification
{Why this change is needed. What problem it solves. What happens if not implemented.}
## Scope and Impact
### Systems Affected
{List of systems, services, and configuration items.}
### Users Affected
{Who will experience downtime or changes. Estimated number.}
### Dependencies
{Other systems, teams, or changes this depends on.}
## Risk Assessment
| Dimension | Rating | Justification |
|---|---|---|
| Impact (if failure) | {1-3} | {Reason} |
| Likelihood (of failure) | {1-3} | {Reason} |
| **Risk Score** | **{N}** | **{Low/Medium/High}** |
### Risk Mitigation
{Steps to reduce risk — e.g., tested in staging, phased rollout.}
## Implementation Plan
### Pre-Implementation
| Step | Action | Owner | Est. Duration |
|---|---|---|---|
| 1 | {Pre-check or preparation} | {Name} | {Time} |
### Implementation
| Step | Action | Owner | Est. Duration |
|---|---|---|---|
| 1 | {Step description} | {Name} | {Time} |
### Post-Implementation
| Step | Action | Owner | Est. Duration |
|---|---|---|---|
| 1 | {Verification step} | {Name} | {Time} |
## Test / Validation Plan
| Check | Expected Result | Method |
|---|---|---|
| {What to verify} | {Expected outcome} | {How to check} |
## Rollback Plan
**Trigger criteria:** {When to initiate rollback — specific, measurable conditions.}
**Estimated rollback time:** {Duration}
| Step | Action | Owner | Est. Duration |
|---|---|---|---|
| 1 | {Rollback step} | {Name} | {Time} |
## Communication Plan
| When | Audience | Channel | Message |
|---|---|---|---|
| Before change | {Who} | {Email/Teams/Statuspage} | Maintenance notification |
| During (if issues) | {Who} | {Channel} | Status update |
| After completion | {Who} | {Channel} | Completion confirmation |
## Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Change Manager | | | |
| CAB | | | |
| Technical Lead | | | |
## Related Records
{Linked incidents, problems, or previous changes.}Step 5: CAB Review Preparation
For Normal (Major) and Emergency changes, prepare the CAB review summary:
- Load the CAB Review Checklist from
itilskill (references/change-enablement.md) - Self-evaluate the RFC against each checklist item
- Flag any items that are incomplete or need discussion
- Present the checklist evaluation to the user
Step 6: Finalize
- Load done-ops verification gate
- Verify all required sections are complete:
- Business justification is clear
- Implementation plan has specific steps with owners
- Rollback plan has trigger criteria and tested procedure
- Communication plan identifies all audiences
- Risk assessment is realistic
- Present the final RFC for user review
- Note the authorization path: who needs to approve this change
Gotchas
- The RFC is the single document for the entire change lifecycle — plan, approval, implementation, and review all reference this document
- Phased changes (e.g., multi-weekend migrations): use separate Implementation Plan tables per phase, add phase gate criteria (go/no-go between phases), and note all proposed windows in the Schedule section
- Standard changes do not need individual CAB review, but the standard change catalog should be referenced
- Emergency changes still need an abbreviated RFC before implementation, with a full RFC completed within 48 hours
- Always ask about blackout windows — some organizations have change freezes around releases, holidays, or fiscal close
- Rollback plan must have specific trigger criteria, not just "if something goes wrong"
- If the change was triggered by an incident, link the incident ID
- Post-Implementation Review (PIR) is mandatory for Emergency changes (48h) and recommended for all Normal changes (5 business days)
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.