agentleFS
HunLuanZhiZhuHunLuanZhiZhu/Game-Studios-Plugin/skills/day-one-patch/SKILL.md

day-one-patch

Skill1 starsChanged 38 days agoMITView on GitHub

Prepare a day-one patch for a game launch. Scopes, prioritises, implements, and QA-gates a focused patch addressing known issues discovered after gold master but before or immediately after public launch. Treats the patch as a mini-sprint with its own QA gate and rollback plan.

9 other projects use a version of this, 8 of them edited.

Adopted by

Most recently taken up by

The file

Show its rules and text

We split this skill into the rules it gives an agent

20 rules. 13 are common, 0 are distinctive, and 7 are very specific to this project.

  • 13

    Common

    Most of the 9 edited versions we read keep these.

  • 0

    Distinctive

    This author's own choices. Worth a look.

  • 7

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Common:

    Every shipped game has a day-one patch.

    line 12
  2. Common:

    After the gold master build is locked (cert approved or launch candidate tagged)

    line 18
  3. Common:

    When known bugs exist that are too risky to address in the gold master

    line 19
  4. Common:

    When cert feedback requires minor fixes post-submission

    line 20
  5. Common:

    When a pre-launch playtest surfaces must-fix issues after the release gate passed

    line 21
  6. Common:

    Only P1/P2 bugs that are SAFE to fix quickly

    line 24
  7. Common:

    No new features — this is fix-only

    line 25
  8. Common:

    No refactoring — minimum viable change

    line 26
  9. Very specific:

    If production/stage.txt is not Release or Polish:

    line 42
  10. Very specific:

    If [C]: output "No day-one patch required.

    line 72
  11. Very specific:

    Use AskUserQuestion to confirm proceeding or reduce scope.

    line 79
  12. Common:

    Before any code is written, define the rollback procedure.

    line 85
  13. Common:

    Do not proceed to Phase 4 until the rollback plan is written.

    line 95
  14. Common:

    Ask qa-lead to determine: Is a targeted smoke check sufficient, or do any fixes touch systems that require a broader regression?

    line 125
  15. Common:

    Run the required QA scope:

    line 127
  16. Very specific:

    Ask: "May I write this patch record to production/releases/day-one-patch-[version].md?"

    line 196
  17. Common:

    After the patch record is written:

    line 202
  18. Very specific:

    Run /patch-notes to generate the player-facing version of the patch notes

    line 204
  19. Very specific:

    Run /bug-report verify [BUG-ID] for each fixed bug after the patch is live

    line 205
  20. Very specific:

    Run /bug-report close [BUG-ID] for each verified fix

    line 206

“Common” is measured: kept by at least 6 in 10 of the 9 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Day-One Patch

Every shipped game has a day-one patch. Planning it before launch day prevents chaos. This skill scopes the patch to only what is safe and necessary, gates it through a lightweight QA pass, and ensures a rollback plan exists before anything ships. It is a mini-sprint — not a hotfix, not a full sprint.

When to run:

  • After the gold master build is locked (cert approved or launch candidate tagged)
  • When known bugs exist that are too risky to address in the gold master
  • When cert feedback requires minor fixes post-submission
  • When a pre-launch playtest surfaces must-fix issues after the release gate passed

Day-one patch scope rules:

  • Only P1/P2 bugs that are SAFE to fix quickly
  • No new features — this is fix-only
  • No refactoring — minimum viable change
  • Any fix that requires more than 4 hours of dev time belongs in patch 1.1, not day-one

Output: production/releases/day-one-patch-[version].md


Phase 1: Load Release Context

Read:

  • production/stage.txt — confirm project is in Release stage
  • The most recent file in production/gate-checks/ — read the release gate verdict
  • production/qa/bugs/*.md — load all bugs with Status: Open or Fixed — Pending Verification
  • production/sprints/ most recent — understand what shipped
  • production/security/security-audit-*.md most recent — check for any open security items

If production/stage.txt is not Release or Polish:

"Day-one patch prep is for Release-stage projects. Current stage: [stage]. This skill is not appropriate until you are approaching launch."


Phase 2: Scope the Patch

Step 2a — Classify open bugs for patch inclusion

For each open bug, evaluate:

CriterionInclude in day-one?
S1 or S2 severityYes — must include if safe to fix
P1 priorityYes
Fix estimated < 4 hoursYes
Fix requires architecture changeNo — defer to 1.1
Fix introduces new code pathsNo — too risky
Fix is data/config only (no code change)Yes — very low risk
Cert feedback requirementYes — required for platform approval
S3/S4 severityOnly if trivial config fix; otherwise defer

Step 2b — Present patch scope to user

Use AskUserQuestion:

  • Prompt: "Based on open bugs and cert feedback, here is the proposed day-one patch scope. Does this look right?"
  • Show: table of included bugs (ID, severity, description, estimated effort)
  • Show: table of deferred bugs (ID, severity, reason deferred)
  • Options: [A] Approve this scope / [B] Adjust — I want to add or remove items / [C] No day-one patch needed

If [C]: output "No day-one patch required. Proceed to /launch-checklist." Stop.

Step 2c — Check total scope

Sum estimated effort. If total exceeds 1 day of work:

"⚠️ Patch scope is [N hours] — this exceeds a safe day-one window. Consider deferring lower-priority items to patch 1.1. A bloated day-one patch introduces more risk than it removes."

Use AskUserQuestion to confirm proceeding or reduce scope.


Phase 3: Rollback Plan

Before any code is written, define the rollback procedure. This is non-negotiable.

Spawn release-manager via Task. Ask them to produce a rollback plan covering:

  • How to revert to the gold master build on each target platform
  • Platform-specific rollback constraints (some platforms cannot roll back cert builds)
  • Who is responsible for triggering the rollback
  • What player communication is required if a rollback occurs

Present the rollback plan. Ask: "May I write this rollback plan to production/releases/rollback-plan-[version].md?"

Do not proceed to Phase 4 until the rollback plan is written.


Phase 4: Implement Fixes

For each bug in the approved scope, spawn a focused implementation loop:

  1. Spawn lead-programmer via Task with:
    • The bug report (exact reproduction steps and root cause if known)
    • The constraint: minimum viable fix only, no cleanup
    • The affected files (from bug report Technical Context section)
  2. The lead-programmer implements and runs targeted tests.
  3. Spawn qa-tester via Task to verify: does the bug reproduce after the fix?

For config/data-only fixes: make the change directly (no programmer agent needed). Confirm the value changed and re-run any relevant smoke test.


Phase 5: Patch QA Gate

This is a lightweight QA pass — not a full /team-qa. The patch is already QA-approved from the release gate; we are only re-verifying the changed areas.

Spawn qa-lead via Task with:

  • List of all changed files
  • List of bugs fixed (with verification status from Phase 4)
  • The smoke check scope for the affected systems

Ask qa-lead to determine: Is a targeted smoke check sufficient, or do any fixes touch systems that require a broader regression?

Run the required QA scope:

  • Targeted smoke check — run /smoke-check [affected-systems]
  • Broader regression — run targeted tests in tests/unit/ and tests/integration/ for affected systems

QA verdict must be PASS or PASS WITH WARNINGS before proceeding. If FAIL: scope the failing fix out of the day-one patch and defer to 1.1.


Phase 6: Generate Patch Record

# Day-One Patch: [Game Name] v[version]

**Date prepared**: [date]
**Target release**: [launch date or "day of launch"]
**Base build**: [gold master tag or commit]
**Patch build**: [patch tag or commit]

---

## Patch Notes (Internal)

### Bugs Fixed
| BUG-ID | Severity | Description | Fix summary |
|--------|----------|-------------|-------------|
| BUG-NNN | S[1-4] | [description] | [one-line fix] |

### Deferred to 1.1
| BUG-ID | Severity | Description | Reason deferred |
|--------|----------|-------------|-----------------|
| BUG-NNN | S[1-4] | [description] | [reason] |

---

## QA Sign-Off

**QA scope**: [Targeted smoke / Broader regression]
**Verdict**: [PASS / PASS WITH WARNINGS]
**QA lead**: qa-lead agent
**Date**: [date]
**Warnings (if any)**: [list or "None"]

---

## Rollback Plan

See: `production/releases/rollback-plan-[version].md`

**Trigger condition**: If [N] or more S1 bugs are reported within [X] hours of launch, execute rollback.
**Rollback owner**: [user / producer]

---

## Approvals Required Before Deploy

- [ ] lead-programmer: all fixes reviewed
- [ ] qa-lead: QA gate PASS confirmed
- [ ] producer: deployment timing approved
- [ ] release-manager: platform submission confirmed

---

## Player-Facing Patch Notes

[Draft for community-manager to review before publishing]

[list player-facing changes in plain language]

Ask: "May I write this patch record to production/releases/day-one-patch-[version].md?"


Phase 7: Next Steps

After the patch record is written:

  1. Run /patch-notes to generate the player-facing version of the patch notes
  2. Run /bug-report verify [BUG-ID] for each fixed bug after the patch is live
  3. Run /bug-report close [BUG-ID] for each verified fix
  4. Schedule a post-launch review 48–72 hours after launch using /retrospective launch

If any S1 bugs remain open after the patch:

"⚠️ S1 bugs remain open and were not patched. These are accepted risks. Document them in the rollback plan trigger conditions — if they occur at scale, rollback may be preferable to a follow-up patch."

Use AskUserQuestion:

  • Prompt: "Day-one patch complete. What's next?"
  • Options:
    • [A] Run /patch-notes — generate player-facing patch notes
    • [B] Run /bug-report to log any issues found post-deploy
    • [C] Stop here

Collaborative Protocol

  • Scope discipline is everything — resist scope creep; every addition increases risk
  • Rollback plan first, always — a patch without a rollback plan is irresponsible
  • Deferred is not forgotten — every deferred bug gets a 1.1 ticket automatically
  • Player communication is part of the patch — /patch-notes is a required output, not optional

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.