Decomposes a milestone into atomic GitHub issues with commit plans and test requirements. Triggers ONLY when: roadmap-steer has selected a feature/milestone to build next, biz-think acid test has passed and work is greenlit, or user explicitly asks to plan/decompose/break down work. Do NOT trigger when: implementation is already in progress, the task is a single-file quick fix requiring no planning, or issues already exist for the milestone.

4 other projects use a version of this.

Adopted by

Most recently taken up by

The file

We split this skill into the rules it gives an agent

11 rules. 0 are common, 10 are distinctive, and 1 is very specific to this project.

  • 0

    Common

    Most of the 3 edited versions we read keep these.

  • 10

    Distinctive

    This author's own choices. Worth a look.

  • 1

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Before starting, confirm you have both:

    line 12
  2. Distinctive:

    If either is missing, stop and ask.

    line 17
  3. Distinctive:

    NEVER decompose based on imagination: Before creating any issues:

    line 23
  4. Distinctive:

    Do not conflate behaviors.

    line 45
  5. Distinctive:

    If you can't name the files, you haven't read the codebase enough — go back to Step 0

    line 74
  6. Distinctive:

    Commit descriptions are present tense, imperative mood: "add", not "added" or "adds"

    line 83
  7. Distinctive:

    After all issues are drafted, map which issues must complete before others can start.

    line 124
  8. Distinctive:

    Verify there are no cycles.

    line 144
  9. Distinctive:

    Create all issues in dependency order (create blockers first so you have their issue numbers when writing dependents).

    line 148
  10. Very specific:

    After all issues are created, update dependents that reference predecessors to include the actual issue numbers.

    line 185
  11. Distinctive:

    Before marking this skill complete, verify every item:

    line 189

“Common” is measured: kept by at least 6 in 10 of the 3 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Work Breakdown

Decompose a milestone into atomic, independently-implementable issues — each with a commit plan, test plan, and dependency mapping — before any code is written.

Input Requirements

Before starting, confirm you have both:

  1. Milestone: An existing GitHub milestone (verify with gh api repos/{owner}/{repo}/milestones or gh milestone list). If it does not exist, create it first with gh api repos/{owner}/{repo}/milestones -f title="..." -f description="...".
  2. Requirement description: A clear statement of what the milestone delivers — user-facing behaviors, not implementation details. If this is vague, ask the user to clarify before proceeding.

If either is missing, stop and ask. Decomposing without a milestone or clear requirements produces orphaned issues that never ship.

Decomposition Process

Step 0: Read the Codebase First

NEVER decompose based on imagination. Before creating any issues:

  • Read the project's file structure: find . -type f -name "*.ts" -o -name "*.tsx" -o -name "*.js" -o -name "*.py" | head -50 (or the relevant language)
  • Read key files: entry points, routing, database schema, existing components
  • Identify what ALREADY EXISTS — do not create issues for features that are already built
  • Identify which files would need to change for each planned feature
  • If a feature touches only ONE existing file, it's likely smaller than you think

Anti-pattern: Decomposing a "dashboard" into 5 issues when the dashboard component already exists and just needs 3 lines changed. Read the code. Count the actual changes needed. Then decompose.

Step 1: Identify User-Facing Behaviors

List every distinct thing a user can do or observe after the milestone is complete. Write these as behavior statements, not technical tasks.

Format:

Behaviors delivered by [Milestone Name]:
- B1: User can [action]
- B2: System [observable outcome]
- B3: User sees [UI state / response]

Do not conflate behaviors. "User can log in and see their dashboard" is two behaviors.

Step 2: Break Each Behavior into Atomic Issues

For each behavior, identify the smallest independently-implementable unit of work. One issue = one concern.

Splitting rules:

  • Backend logic and frontend rendering are separate issues
  • Data model changes and business logic are separate issues
  • A feature and its error handling are separate issues (unless the error path is one line)
  • A new endpoint and its authentication guard are separate issues
  • A UI component and the API call it triggers are separate issues

Name each issue: [verb] [specific thing] — e.g., "Add user authentication middleware", not "Auth stuff".

Step 3: Granularity Check

Each issue must pass ALL four gates. If any gate fails, split the issue further.

GateLimitFail condition
Acceptance criteria≤ 5 itemsMore than 5 distinct verifiable outcomes
Files touched≤ 3 filesImplementation spans more than 3 files
Predicted commits≤ 3 commitsRequires more than 3 atomic commits
Estimated work≤ 4 hoursHonest estimate exceeds half a day

A failing issue is not a problem — it is information. Split it and recheck.

  • Each issue must reference SPECIFIC files to modify (not vague "implement X")
  • If you can't name the files, you haven't read the codebase enough — go back to Step 0

Commit Planning Per Issue

For each atomic issue, pre-plan every commit before writing a single line of code. This forces clarity on implementation sequence and catches hidden complexity early.

Rules:

  • Implementation commits and test commits are always separate
  • Each commit message must follow conventional commits format: type(scope): description
  • Commit descriptions are present tense, imperative mood: "add", not "added" or "adds"
  • 1–3 commits per issue maximum (if you need more, the issue failed the granularity check)

Embed in the issue body under ## Commit Plan:

## Commit Plan

1. `feat(scope): add [thing]` — implement the core logic
2. `test(scope): add unit tests for [thing]` — cover happy path and edge cases
3. `feat(scope): wire [thing] to [integration point]` — only if a separate wiring step exists

Test Planning Per Issue

For each atomic issue, identify what must be tested and at which layer. Apply these rules without exception:

ConditionRequired test type
Touches an external service (API, DB, queue)Integration test required
Completes a user-facing flow end-to-endE2E test required
Contains pure logic (transformations, calculations, guards)Unit test required
Modifies shared state or a data modelIntegration test required
Renders a UI componentComponent/unit test required

An issue with no test requirement is a red flag — investigate whether it is truly atomic or whether it is glue code hiding inside a larger issue.

Embed in the issue body under ## Test Plan:

## Test Plan

- [ ] Unit: [what function/module, what cases]
- [ ] Integration: [what service interaction, what scenarios]
- [ ] E2E: [what user flow, what assertion]

Omit rows that do not apply. Never write "N/A" — if a test type is not needed, omit the row entirely.

Dependency Ordering

After all issues are drafted, map which issues must complete before others can start.

Dependency rules:

  • Data model issues block all issues that read or write that model
  • API endpoint issues block frontend issues that call them
  • Auth/middleware issues block all issues that require authentication
  • Shared utility issues block all issues that import them

Produce a topological sort — a numbered implementation order with dependency annotations:

Implementation Order:

1. [Issue title] — no dependencies
2. [Issue title] — no dependencies
3. [Issue title] — depends on #1
4. [Issue title] — depends on #2, #3
5. [Issue title] — depends on #4

Verify there are no cycles. A cycle means two issues each depend on the other — this indicates a design problem. Resolve by extracting the shared dependency into a new issue that both can depend on.

Batch Issue Creation

Create all issues in dependency order (create blockers first so you have their issue numbers when writing dependents).

For each issue, run:

gh issue create \
  --title "[verb] [specific thing]" \
  --milestone "[Milestone Name]" \
  --body "$(cat <<'EOF'
## Context

[1–2 sentences: why this issue exists and what it unblocks]

## Acceptance Criteria

- [ ] [Verifiable outcome 1]
- [ ] [Verifiable outcome 2]
- [ ] [Verifiable outcome 3]

## Dependencies

Depends on: #[issue number] — [brief reason]
(omit this section if no dependencies)

## Commit Plan

1. `type(scope): description`
2. `test(scope): description`

## Test Plan

- [ ] Unit: [what, which cases]
- [ ] Integration: [what, which scenarios]
EOF
)"

After all issues are created, update dependents that reference predecessors to include the actual issue numbers. Use gh issue edit #N --body "..." if a placeholder was used during creation.

Verification Checklist

Before marking this skill complete, verify every item:

  • Every issue has ≤ 5 acceptance criteria items
  • Every issue has a ## Commit Plan section with 1–3 conventional commit messages
  • Every issue has a ## Test Plan section with at least one test requirement
  • Dependency graph is a DAG — run a mental topological sort and confirm no cycles exist
  • Sum of all issue scopes covers the full milestone — no behavior from Step 1 is unaddressed
  • No issue is a catch-all ("misc cleanup", "other tasks", "finishing touches") — every issue has a single, named concern
  • All issues are assigned to the correct milestone (gh issue list --milestone "[Name]" to verify)

Next Steps

Report to user: "Milestone [name] decomposed: [N] issues. Dependencies: [order]. Test env needs: [list]"

Suggested next steps (user decides):

  • Issues created → "Start with Issue #[first] (run pre-code)"
  • Need quality review → "Review issues before starting"

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.