Fast, concise sprint snapshot — burndown and emerging risks for situational awareness. 'How is the sprint going?'
11 other projects use a version of this, 7 of them edited.
Adopted by
Most recently taken up by
- striderZA/OpenCodeGameStudiosedited, first seen Nov 4, 2026
- Donchitos/Claude-Code-Game-Studiosedited, first seen Oct 19, 2026
- HunLuanZhiZhu/Game-Studios-Pluginedited, first seen Oct 5, 2026
- rohitg00/pro-workflowtheir own version, first seen Sep 29, 2026
- gonimar/claude-web-studiotheir own version, first seen Sep 27, 2026
- dawn840705/claude-code-studiosedited, first seen Aug 28, 2026
Other versions11 projects use a version of this.
Word for word · 0
None found.
Edited · 7
- Donchitos/Claude-Code-Game-Studios★ 27k98% same
- striderZA/OpenCodeGameStudios★ 11885% same
- dawn840705/codex-code-studios★ 1785% same
- lilangMax/ClaudeCodeGameStudios★ 885% same
- hongyuanc/codex-game-studios★ 581% same
- dawn840705/claude-code-studios★ 185% same
- HunLuanZhiZhu/Game-Studios-Plugin★ 187% same
Wrote their own version · 4
- rohitg00/pro-workflow★ 2.9ksame name
- cenconq25/claude-code-app-studio★ 40same name
- gonimar/claude-web-studio★ 4same name
- philpalmieri/engineering-manager-skills★ 1same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository153 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CCGS Skill Testing Framework/CLAUDE.mdCLAUDE.md
- CLAUDE.mdCLAUDE.md
- design/CLAUDE.mdCLAUDE.md
- docs/CLAUDE.mdCLAUDE.md
- src/CLAUDE.mdCLAUDE.md
- adoptSkill
- architecture-decisionSkill
- architecture-reviewSkill
- art-bibleSkill
- asset-auditSkill
- asset-specSkill
- balance-checkSkill
- brainstormSkill
- bug-reportSkill
- bug-triageSkill
- changelogSkill
- code-reviewSkill
- consistency-checkSkill
- content-auditSkill
- create-architectureSkill
- create-control-manifestSkill
- create-epicsSkill
- create-storiesSkill
- day-one-patchSkill
- design-reviewSkill
- design-systemSkill
- dev-storySkill
- estimateSkill
- gate-checkSkill
- helpSkill
- hotfixSkill
- launch-checklistSkill
- localizeSkill
- map-systemsSkill
- milestone-reviewSkill
- onboardSkill
- patch-notesSkill
- perf-profileSkill
- playtest-reportSkill
- project-stage-detectSkill
- propagate-design-changeSkill
- prototypeSkill
- qa-planSkill
- quick-designSkill
- regression-suiteSkill
- release-checklistSkill
- retrospectiveSkill
- reverse-documentSkill
- review-all-gddsSkill
- scope-checkSkill
- security-auditSkill
- settingsSkill
- setup-engineSkill
- skill-improveSkill
- skill-testSkill
- smoke-checkSkill
- soak-testSkill
- sprint-planSkill
- sprint-statusSkill
- The first 60 shown.
The file
Show its rules and text
We split this skill into the rules it gives an agent
23 rules. 14 are common, 2 are distinctive, and 7 are very specific to this project.
14
Common
Most of the 11 edited versions we read keep these.
2
Distinctive
This author's own choices. Worth a look.
7
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 34
If an argument is given (e.g., /sprint-status 3), search production/sprints/ for a file matching sprint-003.md, sprint-03.md, sprint-3.md, …
- Very specific: line 37
If no argument is given, find the most recently modified file in production/sprints/ and treat it as the current sprint.
- Very specific: line 39
If production/sprints/ does not exist or is empty:
- Very specific: line 60
Every story Complete (or Done) → "Build order done: [M] of [M] stories complete." Offer three ways on: play the build.
- Common: line 78
Read the sprint file in full.
- Common: line 80
Start date and end date
- Common: line 81
All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate
- Common: line 94
If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."
- Very specific: line 103
If it exists, read it directly — it is the authoritative source of truth.
- Very specific: line 105
Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.
- Common: line 110
If the entry references a story file path, check if the file exists.
- Common: line 111
Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).
- Common: line 113
If the entry has no file path (inline task in the sprint plan), scan the sprint plan itself for status markers next to that entry.
- Common: line 115
If no status marker is found, classify as NOT STARTED.
- Common: line 116
If a file is referenced but does not exist, classify as MISSING and note it.
- Very specific: line 118
When using the fallback, add a note at the bottom of the output: "⚠ No sprint-status.yaml found — status inferred from markdown.
- Common: line 127
After collecting status for all stories, check each IN PROGRESS story for staleness:
- Distinctive: line 146
If the date is more than 4 days ago, flag the story as STALE.
- Common: line 147
If no date field is found in the story file, note "no timestamp — cannot check staleness."
- Common: line 148
If the story has no referenced file (inline task), note "inline task — cannot check staleness."
- Common: line 153
Stale story escalation: If any IN PROGRESS story is flagged STALE (no progress in 4+ days), the burndown verdict is upgraded to at least At …
- Common: line 176
If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."
- Distinctive: line 183
Keep the output concise. The story status table is mandatory — do not truncate it.
“Common” is measured: kept by at least 6 in 10 of the 11 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity,workflow
Sprint Status
This is a fast situational awareness check, not a sprint review. It reads the
current sprint plan and story files, scans for status markers, and produces a
concise snapshot in under 30 lines. For detailed sprint management, use
/sprint-plan update or /milestone-review.
This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.
story_granularity — it sets the
grain of the burn-down read: feature-sized chunks at coarse (the default, via rigor: minimal), task-sized
at balanced (rigor: standard), AC-sized at fine.
1. Find the Sprint
Argument: $ARGUMENTS (blank = use current sprint)
- If an argument is given (e.g.,
/sprint-status 3), searchproduction/sprints/for a file matchingsprint-003.md,sprint-03.md,sprint-3.md, or similar (/sprint-planwrites three digits). Report which file was found. - If no argument is given, find the most recently modified file in
production/sprints/and treat it as the current sprint. - If
production/sprints/does not exist or is empty:- At
workflow: minimalthere are no sprints by design — the brief's build order is the plan and the story files carry it. Report progress through it instead, then stop:- The list below was printed by
.claude/scripts/story-status.shbefore you read this skill: one line per unfinished story, already in the route's order (IN_REVIEW,IN_PROGRESS, thenTODO— aReadyorNot Startedstory — in build order), thenBLOCKED,OTHER,NO_STATUSand theCOMPLETEcount:
- The list below was printed by
- At
!bash "${CLAUDE_SKILL_DIR}/../../scripts/story-status.sh"
2. Print, in under 15 lines: `Build order: [N] of [M] stories complete`
from the `COMPLETE` line (count only `Complete` and `Done` stories —
`In Review` is not complete), then **Next**: the story on the first
`IN_REVIEW`, `IN_PROGRESS` or `TODO` line. The list is already
current; do not run the script again, and do not re-rank the story files — an `In Review` story is closed before an
`In Progress` one continues: its work is written. Recommend
`/story-done [path]` for `IN_REVIEW`, `/dev-story [path]` for
`IN_PROGRESS` or `TODO`. Name any `BLOCKED` story with its blocker; it is
never Next.
3. Every story `Complete` (or `Done`) → "Build order done: [M] of [M]
stories complete." Offer three ways on: play the build; add the next
stories from the brief with `/create-stories`; or `/settings` to raise
`modes.rigor` if the game has outgrown a one-page brief.
4. `STORIES none` — no story files at all → "No stories yet. Run
`/create-stories` to turn the brief's build order into stories."
5. No `IN_REVIEW`, `IN_PROGRESS` or `TODO` line, yet the `COMPLETE` line
is short of the total — every unfinished story is `BLOCKED`, `OTHER`
(such as `Draft`) or `NO_STATUS`. There is **no Next**, and the build
order is **not** done: never say it is. Print the `Build order` line,
then name each `BLOCKED` story with its blocker — read from its story
file, usually a `BLOCKED:` note — and each other story with its status
as written. Recommend one step: what the first blocker needs, or else
finishing the first `Draft` or unstatused story and setting its Status
to `Ready`.- At
standardorfull, report: "No sprint files found. Start a sprint with/sprint-plan new." Then stop.
Read the sprint file in full. Extract:
- Sprint number and goal
- Start date and end date
- All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate
2. Calculate Days Remaining
Using today's date and the sprint end date from the sprint file, calculate:
- Total sprint days (end minus start)
- Days elapsed
- Days remaining
- Percentage of time consumed
If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."
3. Scan Story Status
First: check for production/sprint-status.yaml.
If it exists, read it directly — it is the authoritative source of truth.
Extract each story's status, and its priority, owner and blocker when set — they fill the status table's columns. No markdown scanning needed.
Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.
If sprint-status.yaml does not exist (legacy sprint or first-time setup),
fall back to markdown scanning:
- If the entry references a story file path, check if the file exists. Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).
- If the entry has no file path (inline task in the sprint plan), scan the sprint plan itself for status markers next to that entry.
- If no status marker is found, classify as NOT STARTED.
- If a file is referenced but does not exist, classify as MISSING and note it.
When using the fallback, add a note at the bottom of the output:
"⚠ No sprint-status.yaml found — status inferred from markdown. Run /sprint-plan update to generate one."
Optionally (fast check only — do not do a deep scan): grep the code root for a directory or file name that matches the story's system slug to check for implementation evidence. This is a hint only, not a definitive status.
Stale Story Detection
After collecting status for all stories, check each IN PROGRESS story for staleness:
- Resolve the dates with one grep across the story set, not a read per story
— a date is a single line, and opening every in-progress story to find it is
the whole cost of this check:
That one pattern accepts every field-name variant. A story with no match has no date, which is not the same as being stale — report it as "never stamped" and do not compute an age for it.Grep pattern="\*{0,2}(Last Updated|Updated|last-updated|updated_at)\*{0,2}[[:space:]]*:" glob="production/epics/**/story-*.md" output_mode="content"
The
\*{0,2}wrappers are why this works at all./create-storiesemits> **Last Updated**: …, so a pattern requiring:immediately after the word matched no story ever written. Combined with the "no match = never stamped" rule directly above — which is correct in itself — the failure was completely silent: every in-progress story reported as never stamped, and stale-story detection never once fired. A bareUpdated:anchor will regress it.
- Calculate days since that date using today's date.
- If the date is more than 4 days ago, flag the story as STALE. (4-day threshold accounts for weekends — a story last touched on Friday won't appear stale until Wednesday.)
- If no date field is found in the story file, note "no timestamp — cannot check staleness."
- If the story has no referenced file (inline task), note "inline task — cannot check staleness."
STALE stories are included in the output table and collected into an "Attention Needed" section (see Phase 5 output format).
Stale story escalation: If any IN PROGRESS story is flagged STALE (no progress in 4+ days), the burndown verdict is upgraded to at least At Risk — even if the completion percentage is within the normal On Track window. Record this escalation reason: "At Risk — [S] stale story(ies): [title] ([D] days)[, …]" — [S] is how many stories are STALE, and each is named with its own [D], the days since its own Last Updated date (not the oldest age, not an average).
4. Burndown Assessment
Calculate:
- Tasks complete (DONE or COMPLETE)
- Tasks in progress (IN PROGRESS)
- Tasks blocked (BLOCKED)
- Tasks not started (NOT STARTED or MISSING)
- Completion percentage: (complete / total) * 100
Assess burndown by comparing completion percentage to time consumed percentage:
- On Track: completion % is within 10 points of time consumed % or ahead
- At Risk: completion % is 10-25 points behind time consumed %
- Behind: completion % is more than 25 points behind time consumed %
If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."
5. Output
Keep the output concise. The story status table is mandatory — do not truncate it. Aim for under 50 lines total; omit the Emerging Risks section if nothing notable was found. Use this format:
## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])
### Progress: [complete/total] tasks ([%])
| Story / Task | Priority | Status | Owner | Blocker |
|----------------------|------------|-------------|---------|----------------|
| [title] | Must Have | DONE | [owner] | |
| [title] | Must Have | IN PROGRESS | [owner] | |
| [title] | Must Have | BLOCKED | [owner] | [brief reason] |
| [title] | Should Have| NOT STARTED | [owner] | |
### Attention Needed
| Story / Task | Status | Last Updated | Days Stale | Note |
|----------------------|-------------|----------------|------------|----------------|
| [title] | IN PROGRESS | [date or N/A] | [N days] | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |
*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*
### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]
### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]
### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]
### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]6. Fast Escalation Rules
Apply these rules before outputting, and place the flag at the TOP of the output if triggered (above the status table):
Critical flag — if Must Have stories are BLOCKED or NOT STARTED and less than 40% of the sprint time remains:
SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.Completion flag — if all Must Have stories are DONE:
All Must Haves complete. Team can pull from Should Have backlog.Missing stories flag — if any referenced story files do not exist:
NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.Collaborative Protocol
This skill is read-only. It reports observed facts from files on disk.
- It does not update the sprint plan
- It does not change story status
- It does not propose scope cuts (that is
/sprint-plan update) - It makes at most one recommendation per run
For more detail on a specific story, the user can read the story file directly
or run /story-readiness [path].
For sprint replanning, use /sprint-plan update.
For end-of-sprint retrospective, use /retrospective.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.