brainstorm
Skill4 starsChanged 8 months agoMITView on GitHub
Guided construction project concept ideation — from zero idea to a structured project brief. Uses professional planning frameworks and construction industry best practices.
189 other projects use a version of this.
Adopted by
Most recently taken up by
- nielsmadan/skillstheir own version, first seen Nov 8, 2026
- phuthuycoding/kanban-flowtheir own version, first seen Nov 8, 2026
- baethon/skillstheir own version, first seen Nov 8, 2026
- CloudChef/atlasclaw-providerstheir own version, first seen Nov 8, 2026
- nisarth/claude-skills-storetheir own version, first seen Nov 8, 2026
- LongJohnSilver1504/claude-skillstheir own version, first seen Nov 8, 2026
Used with
Projects with it also use playtest-report, team-polish and 8 more.
Other files people use alongside this one.
Files found in the same public projects as a version of this one, more often than they turn up anywhere else. Each project counts once, large collections count for less, and this file's own repository is left out.
CoralGameSkillplaytest-report
Generates a structured playtest report template or analyzes existing playtest notes into a structured format. Use this to standardize playtest feedback collection and analysis.
Also in 9 projects that use this
CoralGameSkillteam-polish
Orchestrate the polish team: coordinates performance-analyst, technical-artist, sound-designer, and qa-tester to optimize, polish, and harden a feature or area for release quality.
Also in 11 projects that use this
lilangMaxSkillsoak-test
Generate a soak test protocol for extended play sessions. Defines what to observe, measure, and log during long play sessions to surface slow leaks, fatigue effects, and edge cases that only appear after sustained play. Primarily used in Polish and Release phases.
Also in 6 projects that use this
lilangMaxSkillteam-live-ops
Orchestrate the live-ops team for post-launch content planning: coordinates live-ops-designer, economy-designer, analytics-engineer, community-manager, writer, and narrative-director to design and plan a season, event, or live content update.
Also in 6 projects that use this
- +6 more from CoralGame
Other versions189 projects use a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 189
- Donchitos/Claude-Code-Game-Studios★ 27ksame name
- codeaholicguy/ai-devkit★ 1.7ksame name
- jtydhr88/ComfyTV★ 1.2ksame name
- event-driven-io/emmett★ 562same name
- zaxbysauce/opencode-swarm★ 519same name
- ZaxbyHub/opencode-swarm★ 518same name
- automagik-dev/genie★ 351same name
- namastexlabs/automagik-genie★ 351same name
- bkywksj/knowledge-base★ 340same name
- pixel-cellar/Claude-Code-Game-Studios★ 324same name
179 more not listed
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository37 other files it gives its agents.
- CLAUDE.mdCLAUDE.md
- budget-checkSkill
- change-orderSkill
- deficiency-reportSkill
- design-decisionSkill
- design-reviewSkill
- design-systemSkill
- drawing-reviewSkill
- estimateSkill
- feasibility-studySkill
- gate-checkSkill
- handover-checklistSkill
- map-systemsSkill
- material-auditSkill
- milestone-reviewSkill
- occupancy-checklistSkill
- onboardSkill
- phase-planSkill
- project-stage-detectSkill
- punch-listSkill
- regulatory-adaptSkill
- retrospectiveSkill
- reverse-documentSkill
- revision-logSkill
- schedule-analysisSkill
- scope-checkSkill
- setup-project-typeSkill
- site-bulletinSkill
- site-inspectionSkill
- startSkill
- team-envelopeSkill
- team-handoverSkill
- team-interiorSkill
- team-mepSkill
- team-safetySkill
- team-siteSkill
- team-structuralSkill
The file
We split this skill into the rules it gives an agent
2 rules. 0 are common, 1 is distinctive, and 1 is very specific to this project.
0
Common
Most of the 156 edited versions we read keep these.
1
Distinctive
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 9
When this skill is invoked:
- Very specific: line 13
Check for existing work: Read design/architectural/project-brief.md if it exists.
“Common” is measured: kept by at least 6 in 10 of the 156 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
When this skill is invoked:
- Parse the argument for an optional building type hint (e.g.,
apartment,shopping mall,hospital). Ifopenor no argument, start from scratch. - Check for existing work: Read
design/architectural/project-brief.mdif it exists. - Run through ideation phases interactively:
Phase 1: Discovery
- What is the purpose of this building?
- Who are the primary users/occupants?
- What is the site context (urban/suburban/rural, climate)?
- Budget range and timeline expectations?
- Sustainability goals?
- Any regulatory constraints known?
Phase 2: Concept Generation
Generate 3 distinct concepts with different approaches:
- Working Title
- Building Type and Program
- Design Approach (traditional, modern, sustainable, adaptive reuse)
- Structural System recommendation
- Estimated Size (gross SF)
- Estimated Budget Range
- Unique Value — what makes this project distinctive
- Biggest Risk
Phase 3: Design Principles
Define 3-5 design principles for the chosen concept.
Phase 4: Program Development
Outline key spaces, areas, and adjacencies.
Phase 5: Feasibility
- Structural system recommendation
- MEP complexity assessment
- Sustainability target recommendation
- Preliminary schedule estimate
- Save to
design/architectural/project-brief.md - Suggest next steps:
/setup-project-typeto configure codes and standards/map-systemsto decompose into building systems/design-systemfor per-system design documents/feasibility-studyfor detailed feasibility analysis/phase-plan newto plan the first phase
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.

