agentleFS
styfinitystyfinity/claude-marketing-department/skills/launch-plan/SKILL.md

launch-plan

Skill6 starsChanged 4 months agoMITView on GitHub

Builds a full campaign or launch plan working backwards from a hard date — the big idea, the complete asset list with deadlines, the T-minus timeline, channel-by-channel choreography, and mid-launch decision triggers agreed before emotions are involved. Use when launching a product, offer, or campaign and the date is real.

13 other projects use a version of this.

Adopted by

Most recently taken up by

The file

We split this skill into the rules it gives an agent

1 rule. 0 are common, 1 is distinctive, and 0 are very specific to this project.

  • 0

    Common

    Most of the 10 edited versions we read keep these.

  • 1

    Distinctive

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Never launch cold. The warm-up phase is part of the launch, not overhead to trim.

    line 34

“Common” is measured: kept by at least 6 in 10 of the 10 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Launch Plan — work back from the date, decide plan B now

Launches fail in predictable ways: assets finish late, every channel fires the same generic announcement, and mid-launch panic produces day-3 decisions that should have been made in week minus-3. This plan works backwards from the date, gives every channel its native role, and writes the plan-B triggers while nobody is panicking.

Inputs

  • What is launching, the hard date, and the one number the launch must hit: $ARGUMENTS
  • From marketing-brief.md if present: top pains and desires (the big idea comes from them), the offer, the primary channel, the message pillars, and the language bank for copy.

Do this

  1. Fix the goal and the date. One number the launch must hit — revenue, signups, booked calls — and the date it must hit it by. Everything else flexes; these two do not.
  2. Choose the big idea: the one angle or story the whole campaign hangs on, drawn from the sharpest pain or desire in the brief. Test it in one sentence — would the ICP stop for it? A launch with three big ideas has none.
  3. Write the asset list — landing page, email sequence, posts, ads, creative, sales enablement — each tagged with the funnel stage it serves and the pillar it ladders to. Inside Claude Code, the launch-planner agent runs the deep version of this pass, and asset builds route to the creative skills (/marketing:hook-factory for the openers, for instance).
  4. Build the T-minus timeline backwards from launch day: assets locked, warm-up and seeding phase (the audience should feel it coming), open day, mid-launch proof drop, close sequence. Every item gets a deadline and an owner, even if every owner is the same person.
  5. Choreograph the channels — what fires where, when, in what order, each in its native role rather than reposting the same announcement:
    • Long-form and email carry the argument and do the closing.
    • Social builds surround-sound presence and pulls people into the argument.
    • The primary channel carries the weight; everything else exists to feed it.
  6. Pre-agree the mid-launch decisions: the day-2 or day-3 numbers that trigger plan B — swap the angle, drop more proof early, extend the close, or hold steady. Written now, not improvised on day 3.
  7. Name the two most likely failure points and the pre-built response to each.

Output

The one-page launch plan — goal and date, big idea, asset list with deadlines and owners, T-minus timeline, channel choreography grid, decision triggers, and the risk pass. After the launch, run /marketing:campaign-debrief to bank what it taught.

Rules

  • The date is fixed; scope flexes. Cut assets before cutting the deadline — a smaller launch on time beats a fuller one late.
  • One big idea. Every asset is a variation on it, or it gets cut.
  • Plan the close hardest. Most launch revenue arrives at the end, and the close sequence is the worst place to improvise.
  • Never launch cold. The warm-up phase is part of the launch, not overhead to trim.
  • Real urgency only. If there is no genuine reason to act now, build one into the offer before launching, or launch without a countdown.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.