sprint-management

Skill1 starsChanged 6 months agoMITView on GitHub

Automate sprint lifecycle: start a new sprint (create iteration, roll over incomplete items), end a sprint (snapshot results, capture metrics), and manage the transition between sprints. Use at sprint boundaries or when setting up a new iteration.

1 other project uses a version of this.

Adopted by

Most recently taken up by

The file

Show its rules and text

We split this skill into the rules it gives an agent

16 rules. About 0 are common, 15 are distinctive, and 1 is very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈15

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 1

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    When incomplete work needs to move to the next iteration

    line 18
  2. Distinctive:

    If the next iteration doesn't exist yet, create one.

    line 44
  3. Distinctive:

    Ask the user what the sprint goals are, or detect them from:

    line 98
  4. Distinctive:

    Ask: "Does this look right?

    line 123
  5. Distinctive:

    Ensure all items have correct iteration assignment

    line 128
  6. Distinctive:

    Update status of rolled-over items if needed (e.g., reset "In Review" back to "In Progress" if the PR was abandoned)

    line 129
  7. Distinctive:

    After the user reviews:

    line 196
  8. Distinctive:

    If yes, chain into the Start Sprint flow

    line 199
  9. Very specific:

    Iteration field exists: Use gh project field-list to find iteration fields, parse their configuration for start/end dates

    line 211
  10. Distinctive:

    Date-based: If iterations have date ranges, match today's date to find current

    line 212
  11. Distinctive:

    Manual: If iterations are just named (e.g., "Sprint 14"), ask the user which is current

    line 213
  12. Distinctive:

    Fallback: Ask the user for the sprint name/number and date range

    line 214
  13. Distinctive:

    Don't auto-modify without confirmation: Always present the plan (rollovers, new items, goals) and get a "yes" before making changes to the …

    line 218
  14. Distinctive:

    Comment on rolled items: When moving an item to the next sprint, add a comment so the history is visible.

    line 219
  15. Distinctive:

    Preserve status: When rolling over, keep the item's current status (In Progress stays In Progress).

    line 220
  16. Distinctive:

    Fiscal year awareness: If the team uses a custom fiscal calendar, respect that mapping from the team roster config for quarterly sprint …

    line 223

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Sprint Management

Automate the sprint lifecycle on GitHub Projects. Handles creating iterations, rolling over incomplete work, snapshotting results, and keeping the board clean between sprints.

When to use

  • "Start the next sprint", "end this sprint", "roll over sprint items"
  • At the beginning or end of a sprint cycle
  • When incomplete work needs to move to the next iteration

Prerequisites

  • GitHub Projects board with iteration field configured
  • GitHub CLI (gh) authenticated with org and project access
  • Team roster (team.json) for context on assignees

Operations

Start Sprint

Triggered by: "start sprint", "start next sprint", "kick off next sprint", "new sprint"

Step 1: Detect sprint state

# Get iteration field metadata
gh project field-list {project-number} --owner {org} --format json

Identify:

  • Current iteration (date range includes today, or most recently ended)
  • Next iteration (if it already exists)
  • Whether there's a gap or overlap

If the next iteration doesn't exist yet, create one. GitHub Projects auto-creates iterations with auto-incremented names that are often wrong (e.g., "Iteration 47" instead of "Sprint 15").

Step 2: Fix iteration naming

GitHub Projects auto-increments iteration names using an internal counter that doesn't match the team's sprint numbering. After creating or finding the next iteration:

  1. Read the current/last sprint name to determine the naming convention (e.g., "Sprint 14", "S14", "2026-05 Sprint 2")
  2. Calculate the correct next name by incrementing the number from the current sprint
  3. Rename the iteration via the API:
# Update iteration name via GraphQL
gh api graphql -f query='
  mutation {
    updateProjectV2IterationField(input: {
      projectId: "{project-node-id}"
      fieldId: "{iteration-field-id}"
      iterationId: "{iteration-id}"
      title: "Sprint {N+1}"
      startDate: "{start-date}"
      duration: {days}
    }) {
      projectV2IterationField { id }
    }
  }
'

Always verify the name is correct before proceeding. Present to the user: "Next sprint will be 'Sprint 15' (May 19 → Jun 1). Correct?"

Step 3: Roll over incomplete items

Find items from the previous sprint that aren't done:

# Get all items in the project
gh project item-list {project-number} --owner {org} --format json --limit 200

Filter to items where:

  • Sprint iteration = previous sprint
  • Status != "Done" (or whatever the team's completion column is)

For each incomplete item:

  1. Update the iteration field to the new sprint
  2. Add a comment noting the rollover:
    Rolled over from Sprint N → Sprint N+1. [Originally planned for {date range}]
  3. Track the rollover for the summary

Step 4: Set sprint goals

Ask the user what the sprint goals are, or detect them from:

  • Issues labeled with initiative/epic labels assigned to the new sprint
  • Items marked as high priority in the new iteration

Present the proposed sprint composition:

Sprint N+1 (May 19 → Jun 1):

Rolled over (5 items):
  ⚠️ #1236 API endpoint (was In Progress)
  ⚠️ #1238 E2E tests (was Todo, blocked)
  ...

New items already assigned (8 items):
  #1300 New feature X
  #1301 Bug fix Y
  ...

Sprint goals (epics with items in this sprint):
  1. Notification Model (#1234) — 2 remaining items
  2. Dashboard Redesign (#1290) — 4 new items
  ...

Ask: "Does this look right? Anything to add, remove, or re-prioritize?"

Step 5: Confirm and save

After user confirmation:

  • Ensure all items have correct iteration assignment
  • Update status of rolled-over items if needed (e.g., reset "In Review" back to "In Progress" if the PR was abandoned)
  • Generate a sprint kickoff summary

End Sprint

Triggered by: "end sprint", "close this sprint", "sprint wrap-up"

Step 1: Snapshot the sprint

Fetch all items assigned to the current sprint:

gh project item-list {project-number} --owner {org} --format json --limit 200

Categorize by final status:

CategoryCriteria
✅ CompletedStatus = Done, issue closed, PR merged
🔄 IncompleteStatus != Done, will roll over
❌ DroppedItems removed from sprint mid-cycle (if trackable)
➕ AddedItems added after sprint start (scope creep signal)

Step 2: Capture metrics

Calculate:

  • Completion rate: done / total planned (exclude mid-sprint additions)
  • Scope change: items added or removed mid-sprint
  • Goal completion: for each sprint goal, did all child issues ship?
  • Rollover count: how many items are carrying over
  • Per-person breakdown: items completed by assignee

Step 3: Generate sprint summary

## Sprint [N] Summary: [Start] → [End]

### Results
- **Planned:** [X] items across [Y] goals
- **Completed:** [Z] items ([%] completion rate)
- **Rolling over:** [N] items
- **Added mid-sprint:** [M] items

### Goal Status
| Goal | Items | Done | Status |
|------|:-----:|:----:|--------|
| [Epic 1] | 6 | 6 | ✅ Complete |
| [Epic 2] | 4 | 2 | ⚠️ Partial (rolling 2) |

### By Team Member
| Member | Planned | Completed | Rolled |
|--------|:-------:|:---------:|:------:|
| @alice | 4 | 3 | 1 |
| @bob | 3 | 3 | 0 |

### Items Rolling Over
| Issue | Assignee | Status | Reason |
|-------|----------|--------|--------|
| [#1236](url) | @bob | In Progress | Race condition found late |

### Observations
- [Patterns, risks, process observations for retro discussion]

Step 4: Transition

After the user reviews:

  • Save the summary to the vault or as a GitHub discussion
  • Prompt: "Ready to start Sprint N+1? I'll roll over the incomplete items."
  • If yes, chain into the Start Sprint flow

Rollover Only

Triggered by: "roll over sprint items", "move incomplete to next sprint"

A lightweight version of the full start/end cycle. Just moves incomplete items from the most recently ended sprint to the current/next one without the full snapshot and metrics.

Sprint detection logic

Since teams configure iterations differently:

  1. Iteration field exists: Use gh project field-list to find iteration fields, parse their configuration for start/end dates
  2. Date-based: If iterations have date ranges, match today's date to find current
  3. Manual: If iterations are just named (e.g., "Sprint 14"), ask the user which is current
  4. Fallback: Ask the user for the sprint name/number and date range

Rules

  • Don't auto-modify without confirmation. Always present the plan (rollovers, new items, goals) and get a "yes" before making changes to the project board.
  • Comment on rolled items. When moving an item to the next sprint, add a comment so the history is visible. Teams need to know something slipped.
  • Preserve status. When rolling over, keep the item's current status (In Progress stays In Progress). Only reset if the user asks.
  • Track scope creep. Items added mid-sprint should be flagged in the summary. This isn't judgment; it's data for retro.
  • Sprint goals are the frame. Everything rolls up to goals. Individual item counts are secondary to "did we hit what we committed to?"
  • Fiscal year awareness. If the team uses a custom fiscal calendar, respect that mapping from the team roster config for quarterly sprint numbering.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.