sprint-management
Skill1 starsChanged 6 months agoMITView on GitHub
Automate sprint lifecycle: start a new sprint (create iteration, roll over incomplete items), end a sprint (snapshot results, capture metrics), and manage the transition between sprints. Use at sprint boundaries or when setting up a new iteration.
1 other project uses a version of this.
Adopted by
Most recently taken up by
- lglucas/ai-dev-operating-systemtheir own version, first seen Sep 28, 2026
Other versions1 project uses a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 1
- lglucas/ai-dev-operating-system★ 12same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository30 other files it gives its agents.
- setupSkill
- enrich-prsSkill
- epic-cleanupSkill
- epic-overviewSkill
- oncall-reviewSkill
- sprint-statusSkill
- team-activitySkill
- team-data-syncSkill
- direct-report-prepSkill
- interview-analysisSkill
- interview-prepSkill
- peer-prepSkill
- project-statusSkill
- team-analysisSkill
- today-prioritiesSkill
- weekly-snippetSkill
- bus-factorSkill
- contribution-velocitySkill
- nine-boxSkill
- project-people-mapSkill
- review-cardsSkill
- review-cyclesSkill
- review-networkSkill
- team-health-reportSkill
- task-rolloverSkill
- context-checkSkill
- prep-my-daySkill
- initiative-breakdownSkill
- product-briefSkill
- technical-deep-diveSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
16 rules. About 0 are common, 15 are distinctive, and 1 is very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈15
Distinctive · estimate
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 18
When incomplete work needs to move to the next iteration
- Distinctive: line 44
If the next iteration doesn't exist yet, create one.
- Distinctive: line 98
Ask the user what the sprint goals are, or detect them from:
- Distinctive: line 123
Ask: "Does this look right?
- Distinctive: line 128
Ensure all items have correct iteration assignment
- Distinctive: line 129
Update status of rolled-over items if needed (e.g., reset "In Review" back to "In Progress" if the PR was abandoned)
- Distinctive: line 196
After the user reviews:
- Distinctive: line 199
If yes, chain into the Start Sprint flow
- Very specific: line 211
Iteration field exists: Use gh project field-list to find iteration fields, parse their configuration for start/end dates
- Distinctive: line 212
Date-based: If iterations have date ranges, match today's date to find current
- Distinctive: line 213
Manual: If iterations are just named (e.g., "Sprint 14"), ask the user which is current
- Distinctive: line 214
Fallback: Ask the user for the sprint name/number and date range
- Distinctive: line 218
Don't auto-modify without confirmation: Always present the plan (rollovers, new items, goals) and get a "yes" before making changes to the …
- Distinctive: line 219
Comment on rolled items: When moving an item to the next sprint, add a comment so the history is visible.
- Distinctive: line 220
Preserve status: When rolling over, keep the item's current status (In Progress stays In Progress).
- Distinctive: line 223
Fiscal year awareness: If the team uses a custom fiscal calendar, respect that mapping from the team roster config for quarterly sprint …
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Sprint Management
Automate the sprint lifecycle on GitHub Projects. Handles creating iterations, rolling over incomplete work, snapshotting results, and keeping the board clean between sprints.
When to use
- "Start the next sprint", "end this sprint", "roll over sprint items"
- At the beginning or end of a sprint cycle
- When incomplete work needs to move to the next iteration
Prerequisites
- GitHub Projects board with iteration field configured
- GitHub CLI (
gh) authenticated with org and project access - Team roster (
team.json) for context on assignees
Operations
Start Sprint
Triggered by: "start sprint", "start next sprint", "kick off next sprint", "new sprint"
Step 1: Detect sprint state
# Get iteration field metadata
gh project field-list {project-number} --owner {org} --format jsonIdentify:
- Current iteration (date range includes today, or most recently ended)
- Next iteration (if it already exists)
- Whether there's a gap or overlap
If the next iteration doesn't exist yet, create one. GitHub Projects auto-creates iterations with auto-incremented names that are often wrong (e.g., "Iteration 47" instead of "Sprint 15").
Step 2: Fix iteration naming
GitHub Projects auto-increments iteration names using an internal counter that doesn't match the team's sprint numbering. After creating or finding the next iteration:
- Read the current/last sprint name to determine the naming convention (e.g., "Sprint 14", "S14", "2026-05 Sprint 2")
- Calculate the correct next name by incrementing the number from the current sprint
- Rename the iteration via the API:
# Update iteration name via GraphQL
gh api graphql -f query='
mutation {
updateProjectV2IterationField(input: {
projectId: "{project-node-id}"
fieldId: "{iteration-field-id}"
iterationId: "{iteration-id}"
title: "Sprint {N+1}"
startDate: "{start-date}"
duration: {days}
}) {
projectV2IterationField { id }
}
}
'Always verify the name is correct before proceeding. Present to the user: "Next sprint will be 'Sprint 15' (May 19 → Jun 1). Correct?"
Step 3: Roll over incomplete items
Find items from the previous sprint that aren't done:
# Get all items in the project
gh project item-list {project-number} --owner {org} --format json --limit 200Filter to items where:
- Sprint iteration = previous sprint
- Status != "Done" (or whatever the team's completion column is)
For each incomplete item:
- Update the iteration field to the new sprint
- Add a comment noting the rollover:
Rolled over from Sprint N → Sprint N+1. [Originally planned for {date range}] - Track the rollover for the summary
Step 4: Set sprint goals
Ask the user what the sprint goals are, or detect them from:
- Issues labeled with initiative/epic labels assigned to the new sprint
- Items marked as high priority in the new iteration
Present the proposed sprint composition:
Sprint N+1 (May 19 → Jun 1):
Rolled over (5 items):
⚠️ #1236 API endpoint (was In Progress)
⚠️ #1238 E2E tests (was Todo, blocked)
...
New items already assigned (8 items):
#1300 New feature X
#1301 Bug fix Y
...
Sprint goals (epics with items in this sprint):
1. Notification Model (#1234) — 2 remaining items
2. Dashboard Redesign (#1290) — 4 new items
...Ask: "Does this look right? Anything to add, remove, or re-prioritize?"
Step 5: Confirm and save
After user confirmation:
- Ensure all items have correct iteration assignment
- Update status of rolled-over items if needed (e.g., reset "In Review" back to "In Progress" if the PR was abandoned)
- Generate a sprint kickoff summary
End Sprint
Triggered by: "end sprint", "close this sprint", "sprint wrap-up"
Step 1: Snapshot the sprint
Fetch all items assigned to the current sprint:
gh project item-list {project-number} --owner {org} --format json --limit 200Categorize by final status:
| Category | Criteria |
| ✅ Completed | Status = Done, issue closed, PR merged |
| 🔄 Incomplete | Status != Done, will roll over |
| ❌ Dropped | Items removed from sprint mid-cycle (if trackable) |
| ➕ Added | Items added after sprint start (scope creep signal) |
Step 2: Capture metrics
Calculate:
- Completion rate: done / total planned (exclude mid-sprint additions)
- Scope change: items added or removed mid-sprint
- Goal completion: for each sprint goal, did all child issues ship?
- Rollover count: how many items are carrying over
- Per-person breakdown: items completed by assignee
Step 3: Generate sprint summary
## Sprint [N] Summary: [Start] → [End]
### Results
- **Planned:** [X] items across [Y] goals
- **Completed:** [Z] items ([%] completion rate)
- **Rolling over:** [N] items
- **Added mid-sprint:** [M] items
### Goal Status
| Goal | Items | Done | Status |
|------|:-----:|:----:|--------|
| [Epic 1] | 6 | 6 | ✅ Complete |
| [Epic 2] | 4 | 2 | ⚠️ Partial (rolling 2) |
### By Team Member
| Member | Planned | Completed | Rolled |
|--------|:-------:|:---------:|:------:|
| @alice | 4 | 3 | 1 |
| @bob | 3 | 3 | 0 |
### Items Rolling Over
| Issue | Assignee | Status | Reason |
|-------|----------|--------|--------|
| [#1236](url) | @bob | In Progress | Race condition found late |
### Observations
- [Patterns, risks, process observations for retro discussion]Step 4: Transition
After the user reviews:
- Save the summary to the vault or as a GitHub discussion
- Prompt: "Ready to start Sprint N+1? I'll roll over the incomplete items."
- If yes, chain into the Start Sprint flow
Rollover Only
Triggered by: "roll over sprint items", "move incomplete to next sprint"
A lightweight version of the full start/end cycle. Just moves incomplete items from the most recently ended sprint to the current/next one without the full snapshot and metrics.
Sprint detection logic
Since teams configure iterations differently:
- Iteration field exists: Use
gh project field-listto find iteration fields, parse their configuration for start/end dates - Date-based: If iterations have date ranges, match today's date to find current
- Manual: If iterations are just named (e.g., "Sprint 14"), ask the user which is current
- Fallback: Ask the user for the sprint name/number and date range
Rules
- Don't auto-modify without confirmation. Always present the plan (rollovers, new items, goals) and get a "yes" before making changes to the project board.
- Comment on rolled items. When moving an item to the next sprint, add a comment so the history is visible. Teams need to know something slipped.
- Preserve status. When rolling over, keep the item's current status (In Progress stays In Progress). Only reset if the user asks.
- Track scope creep. Items added mid-sprint should be flagged in the summary. This isn't judgment; it's data for retro.
- Sprint goals are the frame. Everything rolls up to goals. Individual item counts are secondary to "did we hit what we committed to?"
- Fiscal year awareness. If the team uses a custom fiscal calendar, respect that mapping from the team roster config for quarterly sprint numbering.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.