agentleFS
peterbamuhigirepeterbamuhigire/proposal-skills/skills/domain-delivery/sustainability-planning/SKILL.md

sustainability-planning

Skill11 starsChanged 16 days agoMITView on GitHub

Use when a proposal must explain institutional, technical, financial, or human-resource sustainability, handover, exit, or post-project support. Unlike capacity-building, this skill tests whether results continue after consultant withdrawal across all operating dimensions.

The file

We split this skill into the rules it gives an agent

12 rules. About 0 are common, 12 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈12

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Use this skill when the assignment explicitly needs sustainability, exit strategy, ownership transfer, or continuity content.

    line 17
  2. Distinctive:

    Stop or block the workflow when a required input, permission, or acceptance basis is missing.

    line 32
  3. Distinctive:

    Read the local references only where they materially improve the output.

    line 34
  4. Distinctive:

    Keep the approach specific to the client context and implementation reality.

    line 40
  5. Distinctive:

    Read and search are required.

    line 62
  6. Distinctive:

    When recurrent-cost, owner, or capability evidence is unavailable or missing, return the narrowest qualified exit plan with readiness gaps.

    line 66
  7. Distinctive:

    Every consulting proposal benefits from sustainability thinking, but read this skill specifically when:

    line 89
  8. Distinctive:

    When the ToR asks for a standalone sustainability plan or exit strategy

    line 93
  9. Distinctive:

    No dependency on project funding for ongoing operations

    line 122
  10. Distinctive:

    Do not wait until the end of the assignment to hand over.

    line 137
  11. Distinctive:

    When the ToR asks for a dedicated sustainability plan or exit strategy, generate a document covering:

    line 169
  12. Distinctive:

    Follow east-african-english standards throughout.

    line 180

≈ “Common” is an estimate: at least 1 in 5 of the 364,980 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Sustainability Planning

Acknowledgement: Shared by Peter Bamuhigire, techguypeter.com, +256 784 464178.

<!-- dual-compat-start -->

Use When

  • Use this skill when the assignment explicitly needs sustainability, exit strategy, ownership transfer, or continuity content.
  • Load it when another proposal section needs this domain expertise.

Do Not Use When

  • The task only needs formatting or proposer-profile selection.
  • Another supporting skill is a closer fit for the assignment.

Required Inputs

ArtefactSourceRequired?If absent
Intended post-project outcomes, operating model, owners, and resourcesToR and clientrequiredReturn a sustainability discovery checklist.
Recurrent costs, skills, support, governance, and asset evidenceClient budgets, teams, systemsconditionalMark continuity assumptions and test them during inception.

Workflow

Stop or block the workflow when a required input, permission, or acceptance basis is missing. Recover by revising the scope, obtaining evidence, or returning the narrowest qualified draft before proceeding.

  1. Identify where sustainability or exit-planning logic matters in the assignment.
  2. Read the local references only where they materially improve the output.
  3. Convert the guidance into proposal-ready ownership, continuity, and institutionalization mechanisms.
  4. Integrate the result into the target section and check for consistency.

Quality Standards

  • Translate sustainability concepts into practical proposal language and long-term continuity logic.
  • Keep the approach specific to the client context and implementation reality.
  • Preserve compatibility with existing repository workflows and file paths.

Anti-Patterns

  • Saying “the client will sustain it”. Fix: name owner, process, budget, competence, and authority.
  • Treating training as the whole exit strategy. Fix: cover governance, finance, technology, people, and support.
  • Hiding recurrent costs. Fix: quantify or identify cost drivers and funding decisions.
  • Handover without acceptance evidence. Fix: use asset, access, document, competency, and issue registers.
  • Promising indefinite support. Fix: define warranty, support term, SLA, transition, and renewal boundary.

Outputs

ArtefactConsumerAcceptance condition
Sustainability and exit planEvaluator, client owner, operations teamCovers institutional, technical, financial, human-resource, support, handover, and post-exit controls.

Evidence Produced

EvidenceConsumerAcceptance condition
Sustainability test and handover registerReadiness matrixEvery continuing capability has owner, resources, evidence, gap, action, and acceptance status.

Capability and Permission Boundaries

Read and search are required; any edit or external action remains within the explicit authority and permission boundary stated below. Planning is read-only by default. Transferring assets, credentials, licences, contracts, budgets, or operational responsibility requires explicit authority and recorded acceptance.

Degraded Mode

When recurrent-cost, owner, or capability evidence is unavailable or missing, return the narrowest qualified exit plan with readiness gaps. Mark sustainability not assessed.

Decision Rules

ReadinessActionRisk avoided
Owner, funds, skills, and support are evidencedProceed to phased handoverPremature exit
Critical capability has one personBuild redundancy and supervised practiceSingle-point failure
Recurrent funding is unresolvedEscalate before committing continuityUnfunded operating promise

Worked Example

For a new MIS, hand over administrator access, configuration records, support runbook, trained backups, licence budget, and a tested incident drill before closing the assignment.

<!-- dual-compat-end -->

References

  • Proposal skills router for repository-wide routing and mandatory quality gates.
  • Local references/ files when detailed frameworks or examples are needed.

The question every evaluator asks: "What happens when the consultants leave?" Proposals that answer this convincingly — with specific mechanisms for embedding results into the client's operations — score significantly higher than those that end at "final report delivered". This skill provides the frameworks for demonstrating that the assignment's outcomes will endure.

When to Read This Skill

  • Every consulting proposal benefits from sustainability thinking, but read this skill specifically when:
  • The ToR mentions "sustainability", "exit strategy", "handover", "ownership transfer", or "institutional embedding"
  • The assignment is donor-funded (donors are highly sensitive to sustainability)
  • The assignment involves systems, processes, or institutional changes that must outlive the project
  • When the ToR asks for a standalone sustainability plan or exit strategy

Sustainability Dimensions

Institutional Sustainability

The client organisation can maintain and build on the results:

  • Roles and responsibilities for ongoing activities are assigned to permanent staff
  • Processes are documented in standard operating procedures (SOPs)
  • The function is embedded in the organisational structure (job descriptions, reporting lines)
  • Management commitment is secured through formal adoption (policy, directive, board resolution)

Technical Sustainability

The systems and tools delivered continue to function:

  • System administration skills transferred to client IT staff
  • Maintenance procedures documented and tested
  • Licensing and hosting arrangements transferred to the client
  • Technical documentation complete (system architecture, user manuals, troubleshooting guides)
  • Warranty period with responsive support (typically three to six months after go-live)

Financial Sustainability

The client can afford to continue:

  • Recurrent costs identified and budgeted (hosting, licences, maintenance, consumables)
  • Cost recovery or funding mechanisms in place
  • No dependency on project funding for ongoing operations

Human Resource Sustainability

The people are capable and available:

  • Training of Trainers completed — internal capacity to train new staff
  • Knowledge transfer verified — counterparts can perform tasks independently
  • Staff retention measures discussed with client (incentives, career paths)
  • Documentation accessible for self-learning by future staff

Exit Strategy Framework

Phased Handover

Do not wait until the end of the assignment to hand over. Structure the exit as a gradual transfer:

PhaseConsultant RoleClient RoleDuration
Full deliveryConsultant leads all activitiesClient observes and learnsEarly phases
Joint deliveryConsultant and counterpart work side by sideClient takes increasing responsibilityMiddle phases
Supervised handoverClient leads, consultant mentors and quality-checksClient performs all tasksLate phases
Independent operationConsultant available for support onlyClient operates independentlyPost-project

Handover Checklist

ItemHanded Over ToFormatVerified By
All deliverables (final versions)Client project teamDigital + printedClient sign-off
System source code and documentationClient IT departmentRepository accessTechnical review
Training materials and facilitator guidesClient HR / training unitDigital + printedToT completion
Standard operating proceduresRelevant departmentsApproved SOPsManagement sign-off
Data and databasesClient data custodianSecure transferData integrity check
Licences and access credentialsClient IT departmentDocumented handoverAccess verified

Post-Project Support

Propose a defined support period after formal project closure:

  • Duration: typically three to six months
  • Scope: technical support, troubleshooting, minor adjustments
  • Channel: email and phone support, with defined response times
  • Limitations: does not include new development or scope expansion
  • Cost: included in the original bid or priced separately (state clearly)

Generating a Standalone Section

When the ToR asks for a dedicated sustainability plan or exit strategy, generate a document covering:

  1. Sustainability approach and principles
  2. Analysis of sustainability risks and mitigation measures
  3. Institutional embedding plan (roles, SOPs, organisational integration)
  4. Technical sustainability plan (maintenance, documentation, support)
  5. Financial sustainability analysis (recurrent costs, funding sources)
  6. Knowledge transfer and capacity building plan (reference capacity-building/SKILL.md)
  7. Phased handover schedule
  8. Post-project support arrangements

Follow east-african-english standards throughout.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.