risk-management

Skill11 starsChanged 16 days agoMITView on GitHub

Use when a proposal requires risk identification, scoring, ownership, treatment, monitoring, or a risk register. Unlike project-management, this skill develops the assignment risk model and response thresholds rather than the full governance system.

16 other projects use a version of this.

Adopted by

Most recently taken up by

Used with

Projects with it also use market-microstructure and sentiment-analysis.

Other files people use alongside this one.

Files found in the same public projects as a version of this one, more often than they turn up anywhere else. Each project counts once, large collections count for less, and this file's own repository is left out.
  • agiprolabsSkill

    market-microstructure

    DEX orderflow analysis, trade classification, buyer/seller pressure, and microstructure signals for Solana tokens

    Also in 3 projects that use this

  • MicrosoftSkill

    sentiment-analysis

    Use when a director of product asks for the fictional sentiment split and recent excerpts.

    Also in 3 projects that use this

The file

Show its rules and text

We split this skill into the rules it gives an agent

13 rules. 0 are common, 12 are distinctive, and 1 is very specific to this project.

  • 0

    Common

    Most of the 14 edited versions we read keep these.

  • 12

    Distinctive

    This author's own choices. Worth a look.

  • 1

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    When the assignment crosses a country, regulated sector, or local delivery dependency, load …

    line 14
  2. Distinctive:

    Use this skill when the assignment explicitly needs risk-management, mitigation, contingency, or escalation content.

    line 19
  3. Distinctive:

    Stop or block the workflow when a required input, permission, or acceptance basis is missing.

    line 34
  4. Distinctive:

    Read the local references only where they materially improve the output.

    line 37
  5. Distinctive:

    Keep the approach specific to the client context and implementation reality.

    line 43
  6. Distinctive:

    Read and search are required.

    line 65
  7. Distinctive:

    Every proposal methodology section includes a risk subsection — always read this skill

    line 114
  8. Distinctive:

    When the ToR asks for a standalone risk management plan

    line 117
  9. Distinctive:

    Every risk must have a specific mitigation action — not "monitor and manage"

    line 173
  10. Distinctive:

    Every risk must have an owner — a named role on the team

    line 174
  11. Distinctive:

    Read the reference file when:

    line 252
  12. Distinctive:

    When the ToR asks for a dedicated risk management plan, generate a document covering:

    line 260
  13. Distinctive:

    Follow east-african-english standards throughout.

    line 272

“Common” is measured: kept by at least 6 in 10 of the 14 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Risk Management

Acknowledgement: Shared by Peter Bamuhigire, techguypeter.com, +256 784 464178.

When the assignment crosses a country, regulated sector, or local delivery dependency, load skills/meta/operational-readiness-and-localisation/SKILL.md and promote material readiness gaps into the risk register with owners, hold points, fallbacks, and re-test dates.

<!-- dual-compat-start -->

Use When

  • Use this skill when the assignment explicitly needs risk-management, mitigation, contingency, or escalation content.
  • Load it when another proposal section needs this domain expertise.

Do Not Use When

  • The task only needs formatting or proposer-profile selection.
  • Another supporting skill is a closer fit for the assignment.

Required Inputs

ArtefactSourceRequired?If absent
Scope, assumptions, dependencies, constraints, and risk appetiteToR and delivery planrequiredReturn a risk-discovery plan rather than a generic register.
Existing incidents and control evidenceClient records and verified researchconditionalMark likelihood and residual risk provisional.

Workflow

Stop or block the workflow when a required input, permission, or acceptance basis is missing. Recover by revising the scope, obtaining evidence, or returning the narrowest qualified draft before proceeding.

  1. Identify where risk-management logic matters in the assignment.
  2. Separate actual delivery risks from evaluator objections so both are answered properly.
  3. Read the local references only where they materially improve the output.
  4. Convert the guidance into proposal-ready risks, controls, and response mechanisms.
  5. Integrate the result into the target section and check for consistency.

Quality Standards

  • Translate risk frameworks into practical proposal language, scoring, and mitigation logic.
  • Keep the approach specific to the client context and implementation reality.
  • Preserve compatibility with existing repository workflows and file paths.

Anti-Patterns

  • Copying a generic risk list. Fix: tie cause, event, impact, and response to the assignment.
  • Calling an issue a risk. Fix: track occurred events as issues with recovery actions.
  • Giving every risk a medium score. Fix: define scales and justify ratings from evidence.
  • Naming mitigation without an owner or trigger. Fix: assign ownership, due date, indicator, and contingency.
  • Hiding risk to sound confident. Fix: state material uncertainty and the decision it affects.

Outputs

ArtefactConsumerAcceptance condition
Risk management plan and registerEvaluator, project manager, risk ownersEach material risk has cause, event, impact, score, owner, treatment, trigger, contingency, and review date.

Evidence Produced

EvidenceConsumerAcceptance condition
Scored risk register and treatment traceVersioned tableRatings use declared scales and residual risk reflects evidenced controls.

Capability and Permission Boundaries

Read and search are required; any edit or external action remains within the explicit authority and permission boundary stated below. Risk review is read-only by default. Editing the register requires authority; accepting risk, spending contingency, changing scope, or executing recovery requires the named owner.

Degraded Mode

Without incident, control, or stakeholder evidence, provide a provisional risk hypothesis register and evidence requests. Do not report residual risk as assessed.

Decision Rules

StateActionRisk avoided
Threat has not occurredTrack as risk with triggerConfusing prevention and recovery
Event has occurredMove to issue and activate responsePassive monitoring
Residual exposure exceeds appetiteEscalate, redesign, transfer, or stopUnauthorised acceptance

Worked Example

For delayed client data, record the dependency, early-warning date, responsible client owner, schedule effect, fallback sample, and escalation threshold instead of writing only “data delays”.

SaaS-Specific Risks

For SaaS implementation and SaaS product-development engagements, the standard risk categories must include SaaS-specific entries: tenant isolation failure, noisy-neighbour, data residency change, sub-processor rejection, data-migration reconciliation breaks, regulator stance shift, sponsor change before signature, BAFO pressure, security questionnaire pass time, penetration test late finding, adoption miss at 60 days, operating-model not adopted, cloud-provider outage, exit-clause dispute, custom-configuration portability. Reference ../references/saas-risk-register-for-proposals.md for the full register.

AI-on-SaaS Risks

For engagements that build AI features into a multi-tenant SaaS, layer the ten-entry AI risk register on top of the SaaS register: model risk, hallucination liability, prompt injection, data leakage into model providers, sub-processor exposure (model providers), regulatory shift (AI Act, NCAIS, NAIS, sectoral), vendor lock-in to a single model family, training-data contamination, drift (eval / performance / cost), and reputational. Each entry carries trigger, mitigation, owner, escalation. Reference ../references/ai-on-saas-risk-register-for-proposals.md for the full register and ../ai-on-saas-risk-and-responsible-ai/SKILL.md for the companion skill (risk register + Responsible-AI commitment).

AI-Agent Risks

For agentic engagements (LLM systems that plan, call tools, decide, and act on the buyer's behalf), use the twelve-entry agent risk register from ../references/ai-agent-risk-register-for-proposals.md and the companion skill ../ai-agent-risk-and-responsible-ai/SKILL.md. The agent register adds: autonomy-action incident; irreversibility incident; accountability dispute; scope-creep; multi-agent collusion / failure cascade; prompt injection via tool output; memory poisoning; regulator action on agentic system; kill-switch failure; identity / impersonation breach; escalation overload; legacy-system damage. Mitigations are anchored in the action catalogue, autonomy commitment, kill-switch architecture with quarterly drill, action audit log with 99 % completeness SLA, and the Responsible-AI Agent Commitment with a named Agent Safety Lead.

<!-- dual-compat-end -->

References

  • Proposal skills router for repository-wide routing and mandatory quality gates.
  • Local references/ files when detailed frameworks or examples are needed.
  • ../references/proposal-objection-handling.md for price, risk, timeline, staffing, technology, local-context, support, AI, and procurement concerns.
  • ../references/ethical-persuasion-and-evaluator-psychology-gate.md for risk perception and ethical risk framing.
  • ../references/technical-strategy-credibility-checklist.md for technical, SaaS, AI, software, cloud, API, operations, and maintainability risks.
  • ../references/saas-risk-register-for-proposals.md for the SaaS-specific risk register (architecture, data, commercial, security, adoption, vendor, exit).
  • ../references/saas-procurement-and-security-questionnaire-playbook.md for security and compliance risks.
  • ../references/saas-msa-dpa-sla-template-language.md for contractual mitigations.
  • ../references/ai-on-saas-risk-register-for-proposals.md for the AI-on-SaaS risk register.
  • ../references/ai-on-saas-responsible-ai-commitment.md for the Responsible-AI commitment that pairs with the AI risk register.
  • ../references/ai-agent-risk-register-for-proposals.md for the agent risk register (twelve entries).
  • ../references/ai-agent-responsible-ai-commitment.md for the Responsible-AI Agent Commitment.

A strong risk section demonstrates that the firm has thought beyond the ideal scenario. Proposals that identify specific, credible risks — and propose practical mitigations — show maturity and experience. Generic risk tables ("risk: delays; mitigation: monitor closely") signal that the firm has not thought deeply about the assignment.

When to Read This Skill

  • Every proposal methodology section includes a risk subsection — always read this skill
  • The ToR mentions "risk management", "risk register", "risk assessment", or "risk mitigation"
  • The assignment has significant complexity, dependencies, or political sensitivity
  • When the ToR asks for a standalone risk management plan

Risk Identification

Categories of Risk

CategoryExamples
TechnicalSystem integration failures, data quality issues, technology obsolescence, scope creep
OperationalStaff turnover (client or consultant side), logistics failures, connectivity issues, venue unavailability
InstitutionalPolitical changes, leadership turnover, restructuring during the assignment, inter-departmental conflicts
FinancialCurrency fluctuation, budget cuts, delayed payments affecting delivery
StakeholderResistance to change, low participation in consultations, competing priorities
ExternalRegulatory changes, election periods, public health emergencies, security situations
Data and privacyData breaches, non-compliance with data protection law, inadequate consent processes
EnvironmentalWeather disruptions to fieldwork, environmental permit delays

Risk Identification Methods

  • Review of the ToR for stated constraints, dependencies, and assumptions
  • Lessons learned from comparable past assignments
  • Stakeholder analysis — which stakeholders may resist or create obstacles
  • Environmental scan — political calendar, security situation, seasonal factors
  • Technical assessment — integration complexity, data availability, infrastructure readiness

Risk Assessment

Likelihood and Impact Matrix

Low ImpactMedium ImpactHigh Impact
High LikelihoodMedium riskHigh riskCritical risk
Medium LikelihoodLow riskMedium riskHigh risk
Low LikelihoodLow riskLow riskMedium risk

Scoring

ScoreLikelihoodImpact
1 — LowUnlikely to occurMinor delay or cost, easily managed
2 — MediumMay occur during the assignmentNoticeable delay, quality impact, or cost overrun
3 — HighLikely to occurSignificant delay, deliverable failure, or budget overrun

Risk Register

The standard format for proposal risk tables:

#RiskCategoryLIScoreMitigationOwner
1Key client staff reassigned during assignmentInstitutional236Secure commitment from Permanent Secretary; document all knowledge transfer; maintain relationship with successorTeam Leader
2Poor internet connectivity at field sitesTechnical326Use offline-capable data collection tools; pre-download all materials; test connectivity before fieldworkTechnical Lead
3Low attendance at stakeholder workshopsStakeholder224Early engagement with department heads; send invitations through client leadership; offer flexible schedulingEngagement Lead

Risk Register Rules

  • Include five to ten risks — fewer looks superficial, more becomes unmanageable
  • Every risk must have a specific mitigation action — not "monitor and manage"
  • Every risk must have an owner — a named role on the team
  • Risks must be specific to this assignment — not generic consulting risks
  • Include at least one risk per major category relevant to the assignment
  • Score risks honestly — a proposal with no high risks looks naive

Risk Monitoring and Reporting

Propose how risks will be tracked during implementation:

  • Risk register reviewed and updated at every team meeting (weekly)
  • New risks added as they emerge
  • Risk status reported in monthly progress reports
  • Critical risks escalated to steering committee immediately
  • Risk register is a living document — shared with the client throughout

Common East African Consulting Risks

These are frequently relevant and can be adapted to specific assignments:

RiskContextTypical Mitigation
Election period disruptionGovernment clients become unavailable during campaign and transition periodsSchedule intensive fieldwork outside election windows; build buffer into timeline
Delayed client approvalsSign-off processes in government can take weeksDefine approval timeframes in inception; escalation path via steering committee
Staff transfersGovernment staff frequently transferred between postingsTransfer knowledge to roles (not just individuals); maintain documentation
Procurement delaysEquipment, venues, or sub-contracts delayed by procurement rulesStart procurement processes early; identify alternative suppliers
Currency fluctuationAssignments quoted in local currency but with USD-denominated costsQuote in stable currency where possible; include exchange rate assumption and adjustment clause
Data unavailabilityExpected baseline data does not exist or is unreliablePlan for primary data collection as contingency; state data assumptions in inception report

Project Shock Management

Based on Wickham's framework, consulting projects routinely face shocks that threaten delivery. Common shock types in East African development consulting:

Shock TypeExamples
Changes in client interestsGovernment reshuffle, policy change, donor reprioritisation, election cycle
Changes in project contextConflict, drought, pandemic, economic shock, currency devaluation
Budget cutsMid-project budget revision by donor, exchange rate losses
Loss of key peopleGovernment counterpart transfers, consultant illness, high staff turnover in partner organisations
Misinterpretation of informationBaseline data errors, population estimates, market size assumptions
Scope creepClient expanding expectations beyond the ToR without adjusting timeline or budget

Response Protocol:

  1. Refer back to objectives — many shocks affect tasks but not the overall aim
  2. Evaluate resource implications — what does the shock cost in time, money, or quality?
  3. Modify plans accordingly — adjust methodology, timeline, or deliverables
  4. Communicate proactively — never hide problems; present problems alongside proposed solutions

Proposal application: Include a "Risk and Mitigation" subsection in the methodology or work plan that identifies 3-5 likely project risks with specific mitigation strategies. This signals experience and preparedness.

Crisis communication rule (Wickham): "When communicating a problem, try to communicate its solution as well."

Quantitative Risk Assessment (Advanced)

For complex assignments or clients that expect quantitative rigour, use the FMEA-based Risk Priority Number:

RPN = Probability (1-10) × Severity (1-10) × Detection (1-10)

Critical severity rule: Regardless of the RPN value, when severity is 8-10, you MUST take action. Never ignore high-severity risks even when probability is low.

Five Risk Response Strategies (Lewis)

  1. Avoidance — eliminate the risk entirely (best option when feasible)
  2. Mitigation — reduce probability or impact
  3. Transfer — shift to another party (insurance, fixed-price subcontracts)
  4. Acceptance — knowingly live with the risk (low RPN only)
  5. Ignore — never appropriate in professional consulting

Dual Assessment Points

Risk assessment occurs at TWO points: strategic-level (can the approach succeed?) and implementation-level (what could go wrong at the task level?). Show evaluators that risk management is embedded in the methodology, not bolted on.

Reference Library

Reference FileContents
references/risk-quantification-and-response.mdFMEA-based RPN scoring (complete P/S/D tables with 10-point scales), five risk response strategies, risk budget calculation (√ formula), ALARP method, riskograph (visual assessment), risk categories for consulting, costing risk (the vagueness problem), buffer scheduling for risk management, dual assessment points, schedule contingency approaches

Read the reference file when:

  • The assignment requires quantitative risk assessment beyond the standard likelihood-impact matrix
  • The financial proposal needs a risk-adjusted contingency calculation
  • The client expects FMEA or similar industrial risk methods
  • Writing a standalone risk management plan

Generating a Standalone Section

When the ToR asks for a dedicated risk management plan, generate a document covering:

  1. Risk management approach and methodology
  2. Risk identification (categories, methods)
  3. Risk assessment framework (likelihood, impact, scoring — or RPN for complex assignments)
  4. Risk register (complete table with all identified risks)
  5. Risk monitoring and reporting process
  6. Risk escalation and decision-making framework
  7. Risk appetite statement (what level of risk is acceptable)
  8. Contingency planning for critical risks
  9. Risk budget calculation (for financial proposals)

Follow east-african-english standards throughout.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.