Validate product / PM requirements before design or roadmap commitment — customer-grounded, stakeholder-owned, business-measurable. USE INSTEAD OF requirements-validation when author is a PM.

The file

We split this skill into the rules it gives an agent

12 rules. About 0 are common, 12 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈12

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Before product design — validate that requirements have real customer evidence and clear stakeholder owners

    line 40
  2. Distinctive:

    When a stakeholder ask is vague, compound, or conflicts with another stakeholder

    line 41
  3. Distinctive:

    When user stories from customer interviews need to be converted into trackable product requirements

    line 42
  4. Distinctive:

    Before committing scope on a roadmap, OKR, or quarterly plan

    line 43
  5. Distinctive:

    Before running the three tests, normalize requirements into a numbered list with persona framing:

    line 47
  6. Distinctive:

    If the input is prose, extract discrete requirements and number them as user stories.

    line 50
  7. Distinctive:

    If the input is already numbered, preserve the numbering.

    line 51
  8. Distinctive:

    Evidence-strength hierarchy (Customer-Grounded Test): When multiple evidence types are available, weight them:

    line 90
  9. Distinctive:

    Never invent a decision owner: If no stakeholder has weighed in, the owner is PENDING.

    line 118
  10. Distinctive:

    After running the three tests per requirement, apply this cross-requirement pass:

    line 133
  11. Distinctive:

    When two requirements conflict — typically because two stakeholders want incompatible outcomes:

    line 145
  12. Distinctive:

    Never invent a decision owner: If no stakeholder has weighed in, the decision is PENDING.

    line 162

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
skill.md

Requirements Validation (PM)

Core principle: Every product requirement must be customer-grounded, stakeholder-owned, and business-measurable. Contradictions between stakeholders must be surfaced for decision, not silently resolved by the PM or the AI. Inversion rule: The PM lens validates WHY (customer need, business rationale) and WHAT (user-visible outcome). It does NOT validate HOW (technical feasibility, implementation contracts, code-level acceptance criteria) — that's the engineer counterpart's job.

Wrong skill?

  • Engineer / technical acceptance-criteria validation -> requirements-validation (engineer-side)
  • Feature design from validated requirements -> debate or brainstorming
  • Implementation planning -> plan-and-execute
  • Validating shipped output against requirements -> output-verification

Announce at start: "I'm using the requirements-validation-pm skill to validate these product requirements."

When to Use

  • Before product design — validate that requirements have real customer evidence and clear stakeholder owners
  • When a stakeholder ask is vague, compound, or conflicts with another stakeholder
  • When user stories from customer interviews need to be converted into trackable product requirements
  • Before committing scope on a roadmap, OKR, or quarterly plan

Input Contract

Before running the three tests, normalize requirements into a numbered list with persona framing:

  • Format: R1: As a [persona], I [need/want] [outcome] so that [value]., R2: ..., etc.
  • If the input is prose, extract discrete requirements and number them as user stories.
  • If the input is already numbered, preserve the numbering.
  • Each R# must be a single, atomic requirement (split compound requirements).
  • Each R# must name the affected persona. If no persona is named, that is itself a failure — flag and request.

Non-Functional Requirements

NFRs (performance, security, compliance, reliability) and regulatory mandates do not fit the standard user-story format cleanly. Frame them as:

"As a [affected role: user / regulator / ops team / auditor], the system must [behavior] so that [risk/obligation]."

The persona may be internal. If no persona can be named, that is itself a Customer-Grounded Test failure. Apply all three tests after framing.

Note on regulatory mandates: "the regulator" is a valid persona for compliance requirements. The Customer-Grounded signal is the regulation itself (cite the specific rule or code). Regulatory requirements typically pass the Customer-Grounded Test by citation alone; they still require a named internal decision owner and a compliance metric.

The Three Tests (PM Lens)

For EACH numbered requirement, apply all three:

1. Customer-Grounded Test

Question: Can you cite a real customer signal (call recording, support ticket, customer interview, analytics datum) that motivates this requirement?

ResultAction
Yes — concrete customer signal existsRequirement passes
No — speculative or "I think customers want"Reject. Require evidence: recording with timestamp, support ticket IDs, or interview notes URL.
No — but this is a new product or feature with no existing customersConditional pass — require instead: a named proxy (design partner, sales prospect, beta tester) AND a plan to validate the assumption within a defined timeframe before full release
Internal-stakeholder ask only ("sales said")Blocking ask — sales aggregation is not a customer signal. Request the specific recording, ticket, or interview the sales signal reflects. If none can be cited within the session, mark FAIL.

Conditional pass — documenting the state:

In the validation report, record Conditional-pass requirements separately from Passed requirements. For each conditional pass:

  • State the condition that remains unfulfilled
  • Name the evidence needed (specific signal, named proxy, planned interview)
  • Note the deadline or stage by which the condition must be resolved (e.g., before launch, before Q2 planning)
  • File a tracking ticket (Linear issue, GitHub issue, Jira ticket, TODO entry with id, or equivalent — whatever the team's canonical tracker is) capturing the condition and deadline before the report is considered complete. If no ticket system is accessible in this session, record the condition in the report with an explicit note: TRACKER PENDING: create a ticket for this condition before this report is acted on. A conditional pass with no tracker and no pending note is not valid.

A conditional pass resolves to PASS or FAIL when the condition deadline fires. It does not silently become PASS.

Evidence-strength hierarchy (Customer-Grounded Test): When multiple evidence types are available, weight them:

  1. Direct customer quote in a recorded interview (strongest)
  2. Support ticket with the customer's own words
  3. Analytics datum corroborated by qualitative signal
  4. Analytics datum alone (weakest — reflects behavior, not need; subject to survivorship bias)
  5. Named design partner / beta tester proxy (acceptable for greenfield, conditional only)

A requirement citing only analytics without any qualitative corroboration should be Conditional, not Pass.

Also check: Is the requirement stated as a solution rather than a need? "Use a calendar widget" is not a requirement — it is an implementation choice. Restate as: "The user can see all upcoming appointments at a glance." Requirements that prescribe solutions bypass validation because they conflate WHAT with HOW. Reject solution-phrased requirements and require reformulation before proceeding.

Banned phrases that signal a failed Customer-Grounded Test:

  • "Customers probably want..."
  • "It would be nice to..."
  • "Industry best practice suggests..." (without a direct customer link)
  • "Competitor X does this" (competitive parity is not customer evidence)

2. Stakeholder-Ownership Test

Question: Is there a named, real decision owner who can resolve scope, priority, and trade-off questions for this requirement?

ResultAction
Named individual (real person, with their role)Passes
Role-only ("the PM team", "leadership")Conditional pass — require a named individual within that role
Unnamed or "TBD"Reject. Decision owner must exist before scope is committed. Write PENDING (ask user for named owner) and STOP.

Never invent a decision owner. If no stakeholder has weighed in, the owner is PENDING. Do not fabricate a name or role to unblock yourself.

3. Business-Measurability Test

Question: Is there a defined business signal that will move if this requirement is met — and a baseline to compare against?

ResultAction
Named metric + baseline + targetPasses
Named metric, no baseline or targetConditional — require (a) the baseline (must be cited from a specific data source with a timestamp, not an estimate) OR (b) a written commitment to instrument before launch with a named DRI. Unverifiable baselines ("approximately X") do not qualify.
Vague benefit ("improve experience", "delight users")Reject. Add a measurable signal: adoption %, retention, CSAT score, support-ticket volume, time-to-value.
Metric does not yet existAcceptable, but parallel issue MUST be filed to instrument it before launch

Step 4: Completeness Check (cross-requirement)

After running the three tests per requirement, apply this cross-requirement pass:

  1. Journey coverage: Name the primary user journeys for the target persona(s). Does each journey have at least one requirement addressing it? List any journeys that are unaddressed — each is a candidate for a new requirement or an explicit out-of-scope decision.
  2. Contradiction scan: Compare each validated requirement against all others for: explicit logical conflicts (R3 requires X, R7 requires NOT X), implicit conflicts (R1 requires real-time, R2 requires offline-first), and shared-resource contention (two requirements that fight over the same resource or constraint). Also flag conflicting customer signals: when two customers want opposite behaviors, that is not automatically a contradiction in the requirements — it may indicate a segmentation decision is needed (Option D in the Contradiction Resolution options). Document all contradictions and segments found and route to Contradiction Resolution below.
  3. All-conditional-pass check: If all requirements are conditional passes, the requirement set is NOT ready for roadmap commitment. Return to the PM with a summary of open conditions and a proposed resolution timeline. If >50% of requirements are conditional passes, escalate even if not all-conditional: raise the proportion explicitly so stakeholders can weigh the risk before committing.

Contradiction Resolution

HARD GATE: Do NOT resolve contradictions silently. The stakeholder decides. This gate stops the current pass, not the entire session — a partial report with open contradictions is acceptable as long as the contradictions are listed and routed explicitly. Do not deliver a final report that omits the contradiction section.

When two requirements conflict — typically because two stakeholders want incompatible outcomes:

  1. State both requirements verbatim.
  2. State the contradiction explicitly: "R3 (owner: [name]) requires X for [persona A], but R7 (owner: [name]) requires Y for [persona B]. These cannot both be true because [reason]."
  3. Propose resolution options:
    • Option A: Prioritize R3 (drop R7 or modify it)
    • Option B: Prioritize R7 (drop R3 or modify it)
    • Option C: Split into phases (R3 in v1, R7 in v2)
    • Option D: Segment by persona (R3 for persona A, R7 for persona B in the same release)
    • Option E: Escalate to a joint decision with both stakeholder owners present. ESCALATION HOLD applies: Option E does not close the contradiction — it schedules a resolution meeting. Mark the contradiction as HELD: [meeting scheduled by/with whom, by when]. Do not ship the requirement set to design or planning until the hold resolves. Record "scheduled intent" is not the same as a decision.
  4. Record the decision:
    • Decision owner: [name — must be a real person who provided the decision. If unknown, write PENDING (ask user) and STOP.]
    • Chosen option: A / B / C / D / E
    • Rationale: [1 sentence]
    • Citation: [link to written decision — wiki page, issue comment, email thread reference. If the decision was made verbally: VERBAL: Meeting of [attendees], [date], [decision in one sentence].]
  5. Do NOT proceed until recorded. Unresolved contradictions block roadmap commitment.

Never invent a decision owner. If no stakeholder has weighed in, the decision is PENDING. Do not fabricate a name or role to unblock yourself.

Output Format

Storage: Publish this report to the requirement set's canonical home (linked wiki page, issue description, PR description, or shared document). If no canonical home is accessible in this session, output the report to the user and add: PUBLISH PENDING: paste or link this report to [your requirements system] before it is acted on. A report that exists only in a chat session is not durable. Include a validation date — a report older than the last customer interview or a market event that changes the problem space should be re-validated before use. Trigger re-validation on: (a) new customer signals that contradict a passed requirement, (b) a product pivot, (c) >90 days elapsed since validation.

## Product Requirements Validation Report
**Validation date:** [YYYY-MM-DD]
**Validated by:** [Name]
**Re-validate before use if:** new customer signals contradict a passed requirement, a product pivot occurs, or >90 days have elapsed.

### Normalized Requirements
- R1: As a [persona], I need [outcome] so that [value].
- R2: ...
*(If the input was prose, list the numbered user stories you extracted here so the user can confirm scope.)*

### Validation Verdict
- X requirements passed
- Y requirements failed (see below)
- Z conditional passes (see Conditions section)
- N requirements pending owner assignment
- P contradictions found

### Passed
- R1: Customer-Grounded ✓ (cite) | Stakeholder-Owned ✓ ([name]) | Business-Measurable ✓ ([metric + baseline])

### Failed (Needs Revision)
- R3: Customer-Grounded FAIL — no customer signal cited
  - Suggested revision: [specific, customer-cited version]
  - Evidence needed: [recording timestamp / ticket ID / interview notes URL]

### Conditional Passes
- R4: Customer-Grounded CONDITIONAL — greenfield product, no existing customers
  - Required: Named proxy ([name]), validation plan ([stage/deadline])

### Owner Pending
- R5: Stakeholder-Ownership PENDING
  - Question for user: Who is the decision owner for this requirement?

### Metrics Pending
- R6: Business-Measurability PARTIAL — metric named but no baseline
  - Required action: pull baseline from [your analytics platform], or file parallel instrumentation issue before launch

### Contradictions Found
- R7 vs R9: [description of conflict]
  - Resolution options: A / B / C / D / E
  - Decision owner: [name — or PENDING (ask user)]
  - Chosen option: [A/B/C/D/E — or PENDING]
  - Rationale: [1 sentence — or PENDING]
  - Citation: [link — or PENDING]

Example

# Check requirements doc for banned speculative phrases (grep -E without quotes breaks on spaces; use -F or quote properly)
grep -inE "(customers probably|it would be nice|industry best practice|competitor .* does)" requirements.md \
  && echo "⚠ Speculative language found — Customer-Grounded Test will FAIL" \
  || echo "✅ No speculative phrases detected"

# Find requirements missing user-story persona framing (scan only R# lines with -E anchored pattern)
grep -nE "^R[0-9]+:" requirements.md | grep -iv "As a " \
  && echo "⚠ Missing 'As a [persona]...' framing" \
  || echo "✅ All R# lines include 'As a' framing"

# Spot vague benefit language (measurability candidates)
grep -inE "(improve|better|faster|easier|enhance|delight|experience)" requirements.md \
  && echo "⚠ Vague benefit language — requires measurable metric + baseline"

Failure Modes

FailureFix
Validated speculative requirements as customer-groundedApply Customer-Grounded Test: if you cannot cite a recording, ticket, or interview, it is not grounded
Accepted "leadership decided" without a named individualStakeholder-Ownership Test requires a real person; PENDING is the correct answer when unknown
Accepted vague benefits (delight, improve, enhance) as measurableBusiness-Measurability Test requires a metric + baseline + target
Resolved stakeholder contradictions silently to avoid escalationHard gate: contradictions go to named decision owners with options, never resolved by the PM or AI alone
Used competitor behavior as the customer-evidence sourceCompetitive parity is not customer evidence; re-anchor on a direct customer signal
Skipped persona naming in user storiesReject the input format; require As a [persona], I [need] ... so that [value] framing
Slipped HOW into the validation (technical feasibility, implementation contracts)That's the engineer counterpart's job — route to requirements-validation (engineer-side)
Accepted "sales said" as a conditional passSales aggregation is not a customer signal; it is a blocking ask — require the cited recording or ticket
Accepted analytics datum alone as customer-grounded (no qualitative corroboration)Analytics reflects behavior, not need; require a qualitative signal or mark as Conditional
Accepted compound user stories ("I want X AND Y AND Z")Split into atomic stories — each gets independent validation
Accepted solution-as-requirement ("use a calendar widget")Restate as a user need: "User can see all upcoming appointments at a glance"
Conditional passes left without a filed tracking ticketA conditional pass without a filed tracker is not valid — file before closing the report
Report lives only in a chat sessionPublish to wiki, issue description, or PR before the session ends
All-conditional-pass set treated as roadmap-readyIf all requirements are conditional passes, return to PM for resolution timeline — not ready for commitment

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.