Phases a live schema change so the store serves both code versions through deploy and rollback. Use when adding, renaming, dropping, or retyping a column or field, adding an index or constraint, splitting a table, changing a stored document shape, or backfilling data on a live store. Skip stores nothing live reads yet or with recorded accepted downtime, and whole-store migrations, which migration-strategy owns.

The file

We split this skill into the rules it gives an agent

6 rules. About 0 are common, 5 are distinctive, and 1 is very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈5

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 1

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Every phase before contract leaves the store in a shape both the new and the previous code version can use.

    line 8
  2. Distinctive:

    Expand: Add the new column, table, index, or field so the previous code version runs against it unchanged: additive, nullable or defaulted …

    line 56
  3. Very specific:

    Ask this and end the turn.

    line 94
  4. Distinctive:

    Add a new constraint in the form the engine offers that does not validate existing rows under a lock, then validate it as a separate step.

    line 99
  5. Distinctive:

    Write the deploy-versus-migration order for this phase where the deploy process reads it, matching Step 2.

    line 127
  6. Distinctive:

    If a feature flag or staged rollout is also requested, that is a separate concern under the project's release policy.

    line 156

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Changing a Live Schema

Every phase before contract leaves the store in a shape both the new and the previous code version can use. This skill never runs a migration or backfill against a shared or production store; that runs under the project's deploy process and authority.

When to use

  • A change to a persisted schema that a running system reads or writes while the change deploys: a table, column, index, constraint, or a stored document or record shape. A backfill on such a store counts.
  • Skip a store nothing live reads yet (pre-release, development only), or one whose owner has accepted downtime for this change. Acceptance is a record you can point at: who accepted, when, and the window. Assumed acceptance counts as no acceptance; ask the owner and wait.
  • Skip a rewrite, a migration of a whole store or system, or any change that data-model's classification took off the ordinary route: migration-strategy owns its contract, cutover, and rollback. Say so.
  • Skip while the domain semantics are unsettled. data-model decides what the data means before anything decides how it moves.

Step 1: Bind the inputs

Open assets/schema-change-record.md before the actions below: they fill its Inputs section and the data-model identity in its header. A missing input is a question for its owner, never a value to assume.

  1. The settled data-model section and the storage-mapping rows this change touches. Record its identity and the route its classification block records, or "new model" when there is no existing one. If the semantics are unchanged, as for an index or a backfill, record "no data-model section" with the reason.
  2. The project's migration tool and conventions: where migrations live, how they are versioned, and at which deploy step they run.
  3. The deploy model: how many code versions run against the store at once during a roll, and the exact rollback target, the version that will run against the changed store if this deploy is reverted.
  4. The store engine and its version.
  5. The size of the affected data: rows or volume, write rate, and whether replicas follow the store.

Step 2: Sequence as expand, migrate, contract

Each phase is its own deployable change with a stated gate to advance and a stated rollback. Write every phase into the record's Phases section now; ship them one at a time, in this order. Record a phase this change does not need (an index alone, a standalone backfill) as not needed: {{reason}} in its Phases row, its own section, and its rows in Tests; never leave one empty.

  1. Expand. Add the new column, table, index, or field so the previous code version runs against it unchanged: additive, nullable or defaulted in a form the engine applies without rewriting the table, and no constraint the old version's writes would violate. The migration runs before the code. Rollback: revert the code; the expansion stays and is harmless.
  2. Dual-write and tolerant reads. The new code writes both shapes and reads either, treating a row not yet backfilled as old-shape. Rollback: the previous version, which still reads and writes the old shape alone.
  3. Backfill. Batch it over a key the store indexes. Make it idempotent; resumable from a recorded cursor; throttled against replication lag and lock wait; and observable through remaining rows, rate, and errors. Verification compares the two shapes by count or checksum and goes in the record. Gate to advance: remaining rows zero and verification passed. Never one transaction over the table.
  4. Switch reads. Rollback: the previous change, which reads either shape.
  5. Stop old writes. Rollback: the previous change, which still writes both shapes.
  6. Contract. Drop the old column, table, or field. Code stops using it in one deploy; the drop ships in a later one, and only when no live version reads the old shape, the rollback target does not read it either, verification has been re-run after old writes stopped and passed, and retention allows. This is the point of no return: its rollback is a restore from the retained backup or snapshot, never an application rollback. Name it in the record and put it to the data owner:

    Contract for {{change}}: drops {{old column, table, or field}}; no live version or rollback target reads it as of {{evidence}}; verification re-run {{date, result}}; retention {{satisfied how}}.
    After this ships, rolling the application back to {{rollback target}} is no longer possible; recovery is {{restore path and its recovery time}}.
    
    1. Accept: ship the contract
    2. Hold: keep both shapes until {{condition}}
    
    Recommendation: {{option}} — {{one sentence}}.

    Ask this and end the turn; clarifying-intent owns what closes it. Record the answer as a row in the ledger beside the record (add to it, never rewrite it). If there is no row, the contract does not ship.

  7. A rename or a type change is done as add, copy, switch, drop, never in place.
  8. Add a new constraint in the form the engine offers that does not validate existing rows under a lock, then validate it as a separate step. If the engine offers no such form, the lock is measured in Step 3.

Step 3: Build each phase under test

  1. REQUIRED SUB-SKILL: invoke test-driven-development for each phase this change needs. Four tests are new behaviour, each red before its code:

    • the migration applies to the previous schema version;
    • the backfill run twice changes nothing the second time;
    • the backfill interrupted mid-run resumes to the same end state;
    • reads handle a row not yet backfilled.

    The compatibility test, the previous code version's suite against the expanded schema, is preserved behaviour: the plan or task accepts that suite as covering its contract, and it runs under that skill's preserved-behaviour cycle: the suite is seen green, one controlled divergence (an expansion the old version cannot tolerate, such as a required column with no default) is watched red, and after it is restored the suite is seen green again.

  2. For every operation that may lock or rewrite (index build, default, type change, constraint, drop): read the engine's documentation for that exact operation on the exact version and record what it says. If a production-sized copy exists, run the operation on it and record the duration, the lock held, and whether the table was rewritten. If there is none, record the operation as unverified, in its evidence row and in the record's Not verified section, which goes to release-readiness as it stands. Never leave it blank.
  3. Write the deploy-versus-migration order for this phase where the deploy process reads it, matching Step 2.
  4. A migration already applied anywhere, including a shared test store, is never edited. Fix forward with a new one.

Step 4: Record and hand off

  1. Complete assets/schema-change-record.md after the phase's tests are green: update Tests, lock evidence, and Status, at .sdlc-skills/designs/{{YYYY-MM-DD}}-{{topic}}-schema-change-{{phase}}.md unless the user names another place. A later phase names this record as its predecessor.
  2. Report four lines and decide nothing:

    Schema change: {{what}}, phase {{n}} of {{n}} ({{expand | dual-write | backfill | switch-reads | stop-old-writes | contract}}), engine {{name and version}}
    Order: {{migration before code | code only | job under the deploy process | code before migration}}; rollback: {{target}} against {{store state it will meet}}
    Lock and rewrite: {{measured on a production-sized copy | unverified}}
    Point of no return: {{not reached | contract}}; acceptance: {{ledger row identity, or "no row"}}
  3. Continue the ordinary chain to verification, review, and the branch decision unchanged. REQUIRED SUB-SKILL: at the release step, invoke release-readiness and hand it the record as evidence for its checks that migrations have exercised recovery, that the rollback target is named, and that downtime is none or scheduled. An unverified lock line is listed there as unverified.
  4. Each later phase, contract above all, is its own change through the same chain, from Step 1, with the record's predecessor line filled.
  5. If a feature flag or staged rollout is also requested, that is a separate concern under the project's release policy. It does not replace the phasing here, and the phasing does not supply it.

Hard stops

  • Running a migration or backfill against a shared or production store from this skill. It runs under the deploy process and its authority.
  • Removing or rewriting data or schema in the same deploy that stops using it.
  • Editing a migration that has already been applied anywhere.

Gotchas

  • A column default or a type change that a small store applies in an instant rewrites the whole table on some engines and versions — shows when the expand migration that took a second in the test suite holds the table for minutes in the first shared environment.
  • An index built the ordinary way blocks writes for the duration — shows when the write error rate climbs while the migration runs, and the engine's concurrent form was never checked in Step 3.
  • A rename reads as one atomic line in the diff while old instances still run against the renamed column — shows when the old version's errors appear only during the roll and vanish when it completes.
  • A data-access layer or a SELECT * that caches the column list at startup breaks when a column it never uses is dropped — shows when the old version passed the compatibility test against the expanded schema and still fails after contract.
  • A backfill in one transaction holds locks and builds replication lag for its whole run — shows when readers on replicas see stale rows minutes after the write, and the backfill cannot be stopped without losing all of it.
  • Rolling the application back after contract has run puts code that reads the old shape against a store that no longer has it — shows when the rollback target in the record was named before contract and never reconsidered when contract shipped.

Common mistakes

  • Expanding and contracting in one migration because the change "is small": split it.
  • Backfilling from the deploy session by hand to finish faster: the backfill is a job the deploy process runs, with its cursor and progress where the operator reads them.
  • Treating a passing compatibility test as proof that contract is safe: the test proves the old version tolerates the expanded store; only the conditions in Step 2.6 make the drop safe.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.