Track, measure, and systematically reduce toil — the repetitive, manual, automatable work that consumes SRE capacity without improving reliability. Use when reviewing how the team spends its time, identifying what to automate next, making the case for engineering investment in reliability tooling, or building a quarterly toil reduction plan. This skill feeds the Improve phase of the SDLC loop. Trigger keywords: toil, toil reduction, repetitive work, manual work, what should we automate, automation opportunity, SRE capacity, team bandwidth, where is time going, engineering investment, reliability backlog, reduce manual work, alert fatigue, too many pages, too many tickets, keep doing the same thing, recurring work.
In this repository21 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- capacity-planningSkill
- chaos-engineeringSkill
- cost-optimizationSkill
- deployment-safetySkill
- iac-reviewSkill
- import-rcaSkill
- incident-responseSkill
- knowledge-captureSkill
- observabilitySkill
- oncall-handoffSkill
- oncall-runbookSkill
- postmortemSkill
- production-readiness-reviewSkill
- rca-summarySkill
- rfcSkill
- root-cause-analysisSkill
- runbook-generatorSkill
- security-postureSkill
- slo-monitoringSkill
The file
We split this skill into the rules it gives an agent
8 rules. About 0 are common, 6 are distinctive, and 2 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈6
Distinctive · estimate
This author's own choices. Worth a look.
2
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 20
Before loading context files, check if context/CONTEXT.md exists in the current directory.
- Distinctive: line 32
Use the answers inline for this session.
- Very specific: line 58
Read context/CONTEXT.md and context/company/tech-stack.md.
- Distinctive: line 74
Ask the user to walk through these categories and estimate hours per week per SRE:
- Distinctive: line 117
If total toil > 50%: flag immediately with recommendation to pause new feature work and invest in toil reduction.
- Distinctive: line 165
Before investing in automation, validate:
- Distinctive: line 166
Is this toil recurring?: If it happened once, document it — don't automate it.
- Distinctive: line 167
Is the toil stable?: If the underlying system is changing, automation will break.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Toil Tracking Skill
Setup Check
Before loading context files, check if context/CONTEXT.md exists in the current directory.
If context/CONTEXT.md exists — read it and proceed normally.
If context/CONTEXT.md does not exist — this skill was installed standalone (e.g. via npx skills add). Ask the user these questions before proceeding:
- Role —
junior-sre/senior-sre/sre-manager(shapes output depth and tone) - Cloud provider —
aws/gcp/azure/on-prem/hybrid - Observability stack — e.g. Datadog, Prometheus+Grafana, New Relic
- Company name and primary services affected (if relevant to this task)
Use the answers inline for this session. For persistent setup across all skills, suggest:
pipx install sre-agent
sre-agent initWhat Is Toil
Toil is work that is:
- Manual — requires a human to do it, even if it could be automated
- Repetitive — same task over and over, not building anything new
- Automatable — a machine could do it with sufficient engineering investment
- Reactive — triggered by an external event, not proactively planned
- No enduring value — doing it doesn't leave the system permanently better
Toil is not bad work — it is necessary. The problem is when toil consumes so much capacity that the team cannot invest in the reliability improvements that would reduce future toil.
Google's SRE book recommends: toil should be < 50% of each SRE's time. Above 50%, the team is in a toil trap — too busy fighting fires to prevent them.
Instructions
Step 1: Load Context
Read context/CONTEXT.md and context/company/tech-stack.md. Load oncall schedule
from context/company/oncall-schedule.md.
Step 2: Identify the Mode
- Audit — measure current toil load across the team
- Prioritize — rank toil items by impact to decide what to automate first
- Business case — build the case for engineering investment to reduce toil
- Quarterly review — review progress against toil reduction goals
Mode: Audit — Measure Current Toil
Step 2a: Toil Inventory
Ask the user to walk through these categories and estimate hours per week per SRE:
Category 1: Incident and Alert Toil
- Hours spent on pages that could be auto-remediated
- Hours spent on alerts that are false positives
- Hours spent on P2/P3 incidents that are recurring (same issue, same fix)
- Hours spent writing the same Slack update messages during incidents
Category 2: Operational Toil
- Hours spent on manual deployment steps that should be automated
- Hours spent on routine cert renewals, key rotations, access reviews
- Hours spent on manual scaling operations
- Hours spent on "ticket hygiene" — moving, updating, closing tickets manually
Category 3: Reactive Toil
- Hours spent responding to ad-hoc requests from developers
- Hours spent on "can you check X" requests
- Hours spent re-explaining the same thing repeatedly (→ should be documentation)
Category 4: Maintenance Toil
- Hours spent keeping tools, scripts, and dashboards from breaking
- Hours spent on dependency upgrades with no reliability benefit
- Hours spent on manual report generation
Step 2b: Toil Load Calculation
Toil audit results:
Category | Hours/week/SRE | % of 40h week
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Incident / alert toil | X | X%
Operational toil | X | X%
Reactive toil | X | X%
Maintenance toil | X | X%
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
TOTAL toil | X | X%
Project / engineering | X | X%
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Status: 🟢 < 33% | 🟡 33–50% | 🔴 > 50%If total toil > 50%: flag immediately with recommendation to pause new feature work and invest in toil reduction.
Mode: Prioritize — What to Automate First
Toil Scoring Matrix
For each toil item, score on three dimensions (1–5):
| Dimension | 1 (low) | 5 (high) |
| Frequency | Rare (monthly) | Daily or continuous |
| Time cost | < 15 minutes | > 2 hours |
| Automation feasibility | Hard / risky | Easy / low risk |
Priority score = Frequency × Time cost × Automation feasibility
Generate a ranked toil reduction backlog:
Toil Reduction Backlog — Ranked by Priority Score
Rank 1: Auto-remediate pod OOMKill restarts
Score: 5 × 4 × 5 = 100
Current cost: ~3 pages/week × 20 min/page = 1h/week per SRE
Automation: kubectl rollout restart on OOMKill event → VPA recommendation
Estimated effort: 2 engineer-weeks
Annual savings: ~52h per SRE × team size
Rank 2: Automate certificate renewal for internal services
Score: 3 × 3 × 5 = 45
Current cost: 2h/month manual process, high error-rate
Automation: cert-manager with auto-renewal
Estimated effort: 1 engineer-week
Annual savings: ~24h per SRE
Rank 3: Dashboard for weekly capacity report (currently manual)
Score: 4 × 2 × 4 = 32
Current cost: 2h/week manual data gathering and formatting
Automation: Datadog scheduled report + Slack bot
Estimated effort: 3 engineer-days
Annual savings: ~104h per SREAutomation Decision Framework
Before investing in automation, validate:
- Is this toil recurring? If it happened once, document it — don't automate it.
- Is the toil stable? If the underlying system is changing, automation will break.
- Is the automation safe? Auto-remediation can hide real problems — ensure it logs every action and has an emergency kill switch.
- Does eliminating this toil free capacity for higher-value work?
Mode: Business Case
Build a cost-of-toil argument for engineering investment:
Toil Reduction Business Case
Current state:
Team size: N SREs
Average SRE fully-loaded cost: $X/year (salary + benefits + overhead)
Current toil load: X% of time = X hours/week per SRE
Annual cost of current toil:
X hours/week × 52 weeks × N SREs × (hourly rate) = $X/year
Top toil reduction opportunities:
1. <Automation A>
Investment: X engineer-weeks = $X
Annual savings: X hours × $rate = $X/year
Payback period: X months
ROI (3-year): X%
2. <Automation B>
Investment: X engineer-weeks = $X
Annual savings: $X/year
Payback period: X months
Total investment required: $X (X engineer-weeks)
Total annual savings: $X/year
Total 3-year ROI: X%
Non-financial benefits:
- Reduce on-call burden → improve retention
- Free X engineer-weeks/quarter for reliability projects
- Reduce incident MTTR by ~X% (less manual intervention required)Mode: Quarterly Review
At the end of each quarter, review progress:
Toil Reduction Review — Q<N> YYYY
Target: reduce toil from X% to Y% of SRE time
━━━ Completed this quarter ━━━
✅ Auto-remediation for pod OOMKill — saves 1h/week/SRE
✅ cert-manager deployed — saves 2h/month/SRE
✅ Automated capacity report — saves 2h/week/SRE
Total saved: X hours/week across team
━━━ In progress ━━━
🔄 Alert deduplication — 60% complete, targeting next month
━━━ Not started (deprioritized) ━━━
⏸ Dashboard auto-generation — deprioritized due to incident load
━━━ New toil identified this quarter ━━━
⚠️ Manual Slack notification for deploy status — added to backlog
━━━ Current toil load ━━━
Before: X% | After: Y% | Target: Z%
Status: 🟢 On track / 🟡 Slipping / 🔴 Toil trap
━━━ Next quarter targets ━━━
1. Complete alert deduplication — owner: SRE team
2. Automate deploy status notifications — owner: platform team
3. Target toil load: <Z%Toil vs. Engineering Work Balance
Track and protect the ratio each sprint:
Sprint X toil balance:
Toil work: X points (X%)
Engineering work: X points (X%)
🟢 Healthy: toil < 33% of sprint capacity
🟡 Warning: toil 33–50%
🔴 Toil trap: toil > 50% — pause new features, address toil firstConnection to the SDLC Improve Loop
Toil tracking is the measurement layer of the Improve phase. Without it, the improve loop runs blind:
Operate (incidents, alerts, deploys)
↓ generates
Toil (manual work, repetition)
↓ measured by
Toil tracking → backlog of automation opportunities
↓ feeds
RFC skill → propose the automation
↓ implemented → reduces toil in Operate
↓ measured again → loop closesConnect toil items directly to RFCs: every Rank 1 toil item should have a corresponding RFC for the automation solution.
Guidelines
- Toil that is < 10% of time is normal overhead — do not over-engineer its elimination.
- Alert fatigue is a form of toil: too many alerts = SREs ignore alerts = missed incidents. Alert count per SRE per week is a key metric to track.
- Toil tracking data should go into the quarterly SRE report to management.
- Persona (sre-manager): use toil audit data to justify headcount, tooling budget, or platform team investment. A clear "we spend $X/year on manual work that $Y investment would eliminate" is the most effective engineering ask.
- Persona (junior-sre): if > 50% of your time is toil, raise this with your manager. That is not sustainable and is a signal the team needs investment.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.