capacity
Skill29 starsChanged 33 days agoMITView on GitHub
Use when the plan assumes more time, money, or personal energy than actually exists — or periodically on any sustained effort. Assesses the operator's real capacity and runway, checks whether posture is sustainable, and finds the culminating point in concrete personal terms rather than abstract ones. The failure mode it catches is the operator running out before the goal does. Writes to the goal's capacity key.
We split this skill into the rules it gives an agent
12 rules. 0 are common, 8 are distinctive, and 4 are very specific to this project.
0
Common
Most of the 9 edited versions we read keep these.
8
Distinctive
This author's own choices. Worth a look.
4
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 18
Purpose: Check whether the person running this can actually run it, for as long as it needs running.
- Distinctive: line 36
Do not moralise about rest, do not catastrophise about burnout, and do not collude with a plan that obviously doesn't fit the hours …
- Very specific: line 48
Read the goal — the goal statement, deadline, the plan key, the posture key, the people key, and the log.
- Distinctive: line 54
Ask directly. Estimates are fine.
- Distinctive: line 74
Ask once, plainly, and accept whatever's given.
- Distinctive: line 92
If the plan requires more than is available, say it plainly and immediately.
- Distinctive: line 97
When the plan is short, find the constraint before cutting anything (Eliyahu Goldratt, *The Goal*, 1984).
- Very specific: line 113
If the posture key is set:
- Very specific: line 184
Call write_section on capacity with the honest hours per week, the runway, and any specific warning sign to watch:
- Very specific: line 204
Call append_log with one note on what changed this pass, not a summary of the section the page already shows.
- Distinctive: line 207
If the write returns { ok: false, errors }, fix the reported fields and retry before ending the turn.
- Distinctive: line 221
If capacity genuinely fits the plan, say so and stop.
“Common” is measured: kept by at least 6 in 10 of the 9 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Skill: capacity
Trigger: The plan is getting bigger, the timeline is getting longer, or the user is
tired. Also run periodically on any effort lasting more than a few weeks, and whenever
strategy escalates posture — an escalation nobody has checked against real capacity is
how sustained efforts end.
Purpose: Check whether the person running this can actually run it, for as long as it needs running.
systems analyses the culminating point abstractly — the moment past which effort yields
less. This one asks the concrete version: when do you run out? Of hours, of money,
of goodwill at home or at work, of the energy to keep asking people for things.
Most sustained coordination efforts don't fail because the strategy was wrong. They fail because the person driving it stopped, and everything downstream of them stopped too.
Voice & Tone
Direct and practical, not therapeutic. This is a resource assessment. The user is an adult making their own choices about what to spend themselves on, and the job is accurate information, not persuasion toward balance.
Do not moralise about rest, do not catastrophise about burnout, and do not collude with a plan that obviously doesn't fit the hours available — that's the specific failure this skill exists to catch, and softening it is the way to be useless.
Where the numbers don't work, say so plainly and give options. The user decides.
Execution Sequence
1. Load Context
Read the goal — the goal statement, deadline, the plan key, the posture key, the people key, and the log. Look
at the log's rhythm as much as its content: gaps, and stretches of high activity, both
carry information.
2. Establish the Real Numbers
Ask directly. Estimates are fine; precision isn't the point, and orders of magnitude are.
TIME
Hours per week actually available for this: [N]
Competing commitments: [work, family, study, other obligations]
Is that sustainable, or is it borrowed from something? [what's being displaced]
MONEY (if the goal costs anything)
Spent so far: [N]
Committed but unspent: [N]
Available before it hurts: [N]
Is any of it other people's? [obligations that creates]
ENERGY
Current level: [running well | tired but fine | running on reserves | depleted]
How long at this rate: [honest estimate]
Last real break: [when]Ask once, plainly, and accept whatever's given. If the user won't put numbers on it, work with ranges and note the assessment is rough.
3. Compare Against the Plan
The core arithmetic:
PLAN REQUIRES: [estimated hours/week to execute the current plan]
ACTUALLY AVAILABLE: [N hours/week]
GAP: [surplus | matched | short by N]
RUNWAY: [how long the current rate can hold — weeks, months]
DEADLINE: [time remaining]
VERDICT: [runway exceeds deadline | runway falls short by N | no deadline, but rate is
unsustainable from [date]]If the plan requires more than is available, say it plainly and immediately. Do not soften it and do not present it as a motivation problem. A plan that needs twenty hours a week from someone who has six is not a discipline failure; it's an arithmetic error, and it resolves by changing the plan.
When the plan is short, find the constraint before cutting anything (Eliyahu Goldratt, The Goal, 1984). One thing limits how fast the whole effort moves: usually one person's hours, one approval, or one skill only the user has. Work it in Goldratt's five steps:
- Identify it: the step everything else waits on.
- Exploit it: spend none of its hours on work something else could do.
- Subordinate the rest to it: other work runs at its pace, not faster.
- Elevate it: only then add hours, money or people to it.
- Repeat: once it stops being the limit, find the next one.
An hour saved anywhere but the constraint saves nothing. What this finds feeds options 1 and 3 in step 7.
4. Check Posture Against Capacity
If the posture key is set:
POSTURE vs CAPACITY
Current posture: [level] — implies [pace, concurrent asks, margin]
Capacity supports: [level]
Mismatch: [none | posture exceeds capacity — sustainable for ~N weeks]Elevated posture is meant to be temporary. A posture that's been elevated for months isn't a posture — it's the new baseline, and it's consuming reserves that were meant for the moment they're actually needed. Say so where it's happening, and say when it started.
5. Single-Point-of-Failure: The Operator
IF YOU STOPPED FOR TWO WEEKS
What continues: [...]
What stops: [...]
What breaks permanently: [...]Almost always, too much stops. That's diagnostic rather than damning, but it's worth seeing concretely. If the answer is "everything stops", the effort has no resilience — and building some is a strategic question, not a personal one.
Where the people key is non-empty, ask what could be handed over. The usual blocker isn't
willingness; it's that nothing has been written down in a form anyone else could pick up.
6. The Honest Culminating Point
CULMINATING POINT — personal
At current rate, you run short of [time | money | energy] around [date/condition]
Warning signs to watch: [specific and observable — the log going quiet, missed
commitments, dreading the work, avoiding the file]
What extends it: [reduce scope | hand off | slow the pace | add money | recruit]Frame warning signs as observable events, not feelings. "Two weeks with no log entry" is checkable; "feeling overwhelmed" gets rationalised away in the moment.
7. Give Real Options
Where capacity falls short, don't leave it as a problem. Lay out the actual choices — they're limited, and seeing all four together makes the decision cleaner:
OPTIONS
1. Cut scope — [what specifically comes out] — [what that costs against the criteria]
2. Extend time — [is the deadline actually fixed?] — [what that costs]
3. Add capacity — [who, doing what, and what recruiting them costs]
4. Sustain and accept — [what breaks, and when]Option 4 is legitimate. Sometimes an effort is worth spending yourself on for a fixed period, and a fixed sprint at a known cost with an end date is very different from an open-ended one nobody has measured. Make it a choice rather than a drift.
8. Elicit
- Does that match how it actually feels, or am I over- or under-reading it?
- What would you drop first if you had to drop something?The second question surfaces the real priority ordering, which is often different from the
plan's stated one — and that difference is worth carrying back to strategy.
9. Update the Goal
Call write_section on capacity with the honest hours per week, the runway, and any specific warning sign to watch:
availableHrsPerWeek: concrete number per week, ornullif unknownrunway: when you run short (e.g., "until 2026-10-15", or "6 months at this rate")watch: the specific observable warning sign (e.g., "two weeks with no log entry", "missing family dinners three nights running")detail(optional, max 280 chars): hover tooltip in the visual layer, elaborating onrunway— what the number rests on. Fill in only when the short field alone would be unclear later.lastReviewed(required,YYYY-MM-DD): today's date, every time this skill writescapacity. Letsstrategytell a stale capacity read from a current one without scanninglog.
{
"capacity": {
"availableHrsPerWeek": 15,
"runway": "until 2026-11-30",
"watch": "log goes quiet or work creeps into evenings regularly",
"detail": "...",
"lastReviewed": "YYYY-MM-DD"
}
}Call append_log with one note on what changed this pass, not a summary of the section the page already shows. If capacity forces a scope change, load plan or strategy
rather than trimming the plan here.
If the write returns { ok: false, errors }, fix the reported fields and retry before ending the turn.
10. Name the Next Step
Next: [the single change that closes the gap, or "nothing — capacity fits the plan"]
Or:
- Cut or resequence the plan → plan
- The goal itself needs resizing → strategy
- Choosing between the options above → decide
- Hand something over → comms, then planIf capacity genuinely fits the plan, say so and stop. This skill should return "you're fine" when that's true — a check that always finds a problem stops being believed.
Other versions9 projects use a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 9
- microsoft/skills★ 3.2ksame name
- microsoft/agent-skills★ 3.1ksame name
- microsoft/azure-skills★ 1.6ksame name
- microsoft/GitHub-Copilot-for-Azure★ 259same name
- jorgeasaurus/agent-skills★ 14same name
- microsoft/frontier-agentic-cobuild-rvas★ 7same name
- microsoft/frontier-ai-starter-kit-rvas★ 7same name
- Joshua-Palamuttam/workbench-template★ 3same name
- microsoft/frontier-ai-governance-rvas★ 1same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
Used alongsideProjects with it also use humanize-content, excalidraw-diagram and 1 more.
Other files people use alongside this one.
Files found in the same public projects as a version of this one, more often than they turn up anywhere else. Each project counts once, large collections count for less, and this file's own repository is left out.
MicrosoftSkillhumanize-content
Write or revise human-readable text in the project's saved tone of voice. Use whenever composing prose, including documentation, emails, articles, social posts, UI copy, and user-facing explanations or replies, even without an explicit humanization request or slash command. Cut filler, stale content, and needless complexity; create TONE-OF-VOICE.md on first use and reuse it on later runs.
Also in 3 projects that use this
MicrosoftSkillexcalidraw-diagram
Create Excalidraw diagram JSON files that make visual arguments. Use when the user wants to visualize workflows, architectures, or concepts.
Also in 3 projects that use this
- +1 more from microsoft
In this repository36 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- brand-architectureSkill
- brand-auditSkill
- brand-contextSkill
- brand-guidelinesSkill
- brand-identitySkill
- brand-initSkill
- brand-messagingSkill
- brand-positioningSkill
- brand-storySkill
- brand-strategySkill
- brand-voiceSkill
- competitor-brandingSkill
- namingSkill
- rebrandingSkill
- target-audienceSkill
- briefSkill
- commsSkill
- decideSkill
- evalSkill
- experimentSkill
- exposureSkill
- forecastSkill
- negotiateSkill
- onboardSkill
- optionsSkill
- planSkill
- premortemSkill
- reconSkill
- reviewSkill
- sitrepSkill
- stakeholdersSkill
- strategySkill
- systemsSkill
- threatSkill
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.

