sprint-close-synthesizer
Skill0 starsChanged 2 months agoMITView on GitHub
Synthesizes a completed sprint into a structured close report and seeds the next sprint planning. Use when — (1) user writes `/sprint-close-synthesizer` or `/sprint-close`, (2) user says "close this sprint", "synthesize sprint", "zamknij sprint", "sprint report", "sprint summary for planning". Reads closed Jira issues via Atlassian MCP, computes velocity and carryover, identifies patterns, and produces: (a) a sprint close report for stakeholders, (b) a planning seed document for the next sprint. Complements `jira-sync` (per-ticket transitions) — this skill operates at sprint level, not ticket level. Do NOT use for single-ticket updates or mid-sprint status.
In this repository11 other files it gives its agents.
The file
We split this skill into the rules it gives an agent
4 rules. About 0 are common, 3 are distinctive, and 1 is very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈3
Distinctive · estimate
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 31
Call atlassianUserInfo. If unavailable:
- Distinctive: line 42
If MCP unavailable but user provided text, proceed — do not stop.
- Distinctive: line 55
If sprint name not provided, find the last closed sprint:
- Distinctive: line 234
After generating both documents, ask:
≈ “Common” is an estimate: at least 1 in 5 of the 364,980 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
sprint-close-synthesizer — Sprint Close Report & Planning Seed
Role: Scrum Master / Delivery Lead / Engineering Manager / PM.
Synthesizes a completed sprint into a close report and hands off a structured seed for next sprint planning. Works with Jira via Atlassian MCP; degrades gracefully to text input if MCP unavailable.
Step 0 — Check inputs and MCP availability
0a. Determine what inputs are available
Ask the user:
"To synthesize the sprint close I need:
- Sprint identifier — the sprint name or ID in Jira (e.g. 'Sprint 42' or 'SAL Sprint 14'). Or paste the Jira project key and I'll find the most recently closed sprint.
- Sprint goal — what was the stated goal for this sprint? (check sprint description in Jira if available)
- Team capacity — how many story points (or hours) were committed at the start?
- Any context outside Jira — decisions made, unplanned work that appeared, external blockers.
If Atlassian MCP is not connected, paste: a list of completed tickets (key + summary + points), a list of carried tickets, and any blockers or unplanned items that came up."
0b. Check Atlassian MCP availability
Call atlassianUserInfo. If unavailable:
Atlassian MCP plugin is not active. Continuing with text input mode.
To enable live Jira data for future sprints:
1. Open Claude Code → Settings (⚙) → Plugins → Atlassian (official plugin)
2. Sign in with your Atlassian account
3. Run /sprint-close-synthesizer againIf MCP unavailable but user provided text, proceed — do not stop.
Step 1 — Pull sprint data (if MCP available)
1a. Find the sprint
Call searchJiraIssuesUsingJql:
project = [PROJECT_KEY] AND sprint = "[SPRINT_NAME]"If sprint name not provided, find the last closed sprint:
project = [PROJECT_KEY] AND sprint in closedSprints() ORDER BY updated DESCTake the most recently closed one.
1b. Pull issues by outcome
Run three queries:
Completed:
project = [PROJECT_KEY] AND sprint = "[SPRINT_NAME]" AND status = "Done"Carried over (not done):
project = [PROJECT_KEY] AND sprint = "[SPRINT_NAME]" AND status != "Done"Unplanned work added during sprint:
project = [PROJECT_KEY] AND sprint = "[SPRINT_NAME]" AND created >= [SPRINT_START_DATE]For each issue, extract: key, summary, story points (or time estimate), type, assignee, labels, epic link.
Step 2 — Compute sprint metrics
Calculate:
| Metric | Formula |
| Committed points | Sum of story points at sprint start (from user input or Jira sprint start snapshot) |
| Completed points | Sum of story points for Done tickets |
| Velocity | Completed points |
| Completion rate | Completed / Committed × 100% |
| Carryover points | Sum of story points for non-Done tickets |
| Unplanned items | Count and points of issues added after sprint start |
| Unplanned ratio | Unplanned points / Total completed points × 100% |
Flag patterns:
- Completion rate < 70%: low predictability — note it
- Unplanned ratio > 30%: sprint was significantly disrupted
- Any epic with 0 completed tickets: blocked epic
- Any ticket carried 2+ sprints: chronic carryover candidate
Step 3 — Identify themes and risks
From the completed and carried tickets, group by:
- Epic (what themes were delivered?)
- Assignee (any individual who was blocked or overloaded?)
- Type (too many bugs vs. features?)
Look for:
- Tickets marked "blocked" or with blocker comments
- Tickets with late status changes (updated on last day of sprint)
- Any tickets missing story points (estimation gap)
Step 4 — Generate Sprint Close Report
Produce a structured Markdown report:
# Sprint Close — [Sprint Name]
**Project:** [Name] | **Period:** [START] – [END] | **Goal:** [Sprint Goal]
---
## 📊 Velocity Summary
| Metric | Value |
|---|---|
| Committed | XX pts |
| Completed | XX pts |
| Completion rate | XX% |
| Carryover | XX pts (N tickets) |
| Unplanned work added | XX pts (N tickets) |
**Overall:** [Green / Amber / Red]
- 🟢 Green: ≥ 85% completion, unplanned < 20%
- 🟡 Amber: 70–84% completion OR unplanned 20–35%
- 🔴 Red: < 70% completion OR unplanned > 35%
---
## ✅ Completed This Sprint
| Key | Summary | Points | Epic |
|---|---|---|---|
| [KEY] | [Summary] | [pts] | [Epic] |
---
## 🔄 Carried Over
| Key | Summary | Points | Carried from sprint(s) | Reason (if known) |
|---|---|---|---|---|
| [KEY] | [Summary] | [pts] | [N sprints] | [reason] |
> **Action:** Review carryover tickets before next sprint planning. Tickets carried 2+ sprints should be re-estimated or split.
---
## ⚡ Unplanned Work Added
| Key | Summary | Points | Added by |
|---|---|---|---|
| [KEY] | [Summary] | [pts] | [Who added / context] |
---
## 📋 Patterns & Observations
[2–4 bullet points derived from Step 3 analysis — factual, not editorializing]
---
## 🏆 Sprint Goal Assessment
**Goal was:** [Stated goal]
**Assessment:** [Met / Partially met / Not met]
**Explanation:** [1–2 sentences — what was delivered vs. the goal, not velocity math]
---
*Synthesized by sprint-close-synthesizer · [DATE] · [SPRINT_NAME]*Step 5 — Generate Planning Seed Document
Produce a separate, shorter document for the team to use in next sprint planning:
# Planning Seed — [Next Sprint Name / "Sprint N+1"]
> Generated from [SPRINT_NAME] close. Use as input for planning, not as a fixed commitment.
## Carry-forward candidates (ordered by priority)
| Key | Summary | Points | Recommendation |
|---|---|---|---|
| [KEY] | [Summary] | [pts] | Carry as-is / Re-estimate / Split / Deprioritize |
## Unfinished epic work
For each epic with incomplete items, list:
- Epic name
- % done (completed tickets / total in epic)
- Remaining tickets and estimated points
- Blocking dependencies (if any)
## Suggested capacity adjustments
Based on last sprint's unplanned ratio of XX%:
- If the team plans XX points, expect ~XX% disruption buffer
- Recommended committed range for next sprint: [LOWER]–[UPPER] points
## Recurring risks to watch
[Any patterns from Step 3 that are likely to repeat — e.g. "late QA discovered issues", "external dependency on X team blocked 2 tickets"]
## Open questions for planning session
[List 2–4 specific questions the PM / Scrum Master should raise at planning based on this sprint's patterns]Step 6 — Offer distribution options
After generating both documents, ask:
"Would you like me to: A. Save the close report as a Markdown file (
sprint-close-[SPRINT_NAME].md) B. Post it to Confluence as a new page under the sprint space C. Format it as an email to send to stakeholders D. Just display it hereFor the planning seed: should I open a Jira sprint planning session, or is this for an in-person planning session?"
Notes for the presenter
- Velocity is a trailing indicator — use it to set planning ranges, not hard targets.
- Carryover is not always bad — scope changes and deprioritization are valid. Flag chronic carryover (2+ sprints), not single-instance carryover.
- Sprint goal assessment is more important than velocity — a team that delivered the goal at 75% completion is in better shape than one that hit 95% completion but missed the goal.
- Do not compare velocity across teams — this report is for the same team over time, not cross-team benchmarking.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.