agentleFS
otaviobarrosotaviobarros/agent-engineering/skills/plan-change/SKILL.md

plan-change

Skill3 starsChanged 20 days agoMITView on GitHub

Plan a software change or revise an existing plan. Define acceptance criteria, authorized scope, coherent slices, and verification needs. Use for planning requests; planning alone does not start implementation.

11 other projects use a version of this.

Adopted by

Most recently taken up by

Used with

Projects with it also use security-review.

Other files people use alongside this one.

Files found in the same public projects as a version of this one, more often than they turn up anywhere else. Each project counts once, large collections count for less, and this file's own repository is left out.
  • SentrySkill

    security-review

    Finds exploitable application security vulnerabilities in code changes. Use for Warden security scans, appsec review, OWASP-style checks, authentication or authorization bugs, injection, XSS, SSRF, path traversal, secrets, unsafe crypto, webhook verification, open redirects, or sensitive data exposure.

    Also in 3 projects that use this

The file

We split this skill into the rules it gives an agent

5 rules. 0 are common, 5 are distinctive, and 0 are very specific to this project.

  • 0

    Common

    Most of the 10 edited versions we read keep these.

  • 5

    Distinctive

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Read executable check configuration.

    line 30
  2. Distinctive:

    Checkpoint 4: every criterion has a verification route or a gap.

    line 69
  3. Distinctive:

    Use the project's plan format and authorized destination, else return the draft in the response.

    line 75
  4. Distinctive:

    Every plan, however small, includes:

    line 77
  5. Distinctive:

    Keep prose short without dropping an item.

    line 88

“Common” is measured: kept by at least 6 in 10 of the 10 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Plan change

Produce a plan grounded in the project's requirements and current code. Reuse accepted decisions and valid plans; keep detail proportional to the change. First read the contract core and the verification rules.

1. Scope and ownership

  • Identify the requested outcome, planning authority, exclusions, and the owner of the requirements and plan. Separate desired behavior from observations and assumptions.
  • An accepted plan covers the request → revalidate affected inputs and propose only necessary amendments.
  • List questions that could change the plan. Answer observable ones by inspection; ask for missing intent and material decisions.

Checkpoint 1: the requirements source and scope are clear.

2. Inspect the affected behavior

  • Trace entrypoints, callers, data, contracts, tests, and docs, including the boundaries and recovery behavior the change touches. For an uncertain interface, sketch its caller's use before choosing its shape.
  • Read executable check configuration. Consult current primary documentation with the project's tools when dependency facts matter.
  • Bug → gather existing original-failure evidence or name the smallest safe reproduction. Read-only checks may run when permitted. Repro files, dependency provisioning, or application edits need their own authority; propose them.

Checkpoint 2: the plan cites inspected code and test locations, separates observations from hypotheses, and states what inspection could not establish.

3. Acceptance and decisions

  • Draft observable acceptance criteria and exclusions for the owner, reusing existing criterion IDs. Give each expected result its independent basis.
  • Choose an approach with the reuse-first ladder.
  • Material product or architecture decision → present alternatives, tradeoffs, and a recommendation to the authorized decision maker. Routine authorized choices proceed.

Checkpoint 3: each criterion is observable, and each material decision is accepted or explicitly pending. A pending decision blocks readiness.

4. Slices and verification

  • Per slice: affected areas, prerequisites, expected result, tests, and required docs. A small change is one slice. Add migration, compatibility, rollout, recovery, or external-dependency work only where needed.
  • Per material risk: the assumption and a disproving check. Separate existing proof from planned verification.
  • Per criterion: checks under the verification rules (existing case IDs, new coverage, original-failure evidence, defect detection). For application runs, name the real interface, readiness and isolation needs, side effects, and evidence-preserving cleanup. Point to project procedures instead of copying commands.
  • Name missing test infrastructure or test-ID mechanisms and propose bounded work; planning installs nothing.
  • Name independent-review needs and specialist triggers, and for each unavailable check, tool, or environment, what would resolve it. A planned check is not a passed check.

Checkpoint 4: every criterion has a verification route or a gap. Every slice has an observable end condition, and every material risk an assumption and a check. Dependencies and blockers are stated.

5. Return the plan and stop

Use the project's plan format and authorized destination, else return the draft in the response. Reference existing authorities instead of copying requirements. Every plan, however small, includes:

  • Outcome, scope, and exclusions
  • Acceptance criteria, by ID or source when they exist
  • Inspected evidence and open questions
  • Decisions, accepted or pending
  • Slices with tests and docs
  • Criterion-to-check map
  • Review needs, blockers, and next action
  • Readiness: ready within authorized scope, pending decision, or blocked, with the reason

Keep prose short without dropping an item. A ready plan grants no implementation permission. A standalone planning request stops here.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.