Scope a sprint from the GitHub backlog — review open issues, apply capacity and velocity, surface dependencies and risks, and produce a proposed sprint with rationale. Works without GitHub connector (manually-supplied backlog) but is significantly richer with it. Trigger phrases: "let's plan the sprint", "help me scope [sprint name]", "what should go in this sprint", "which issues should we tackle next".

The file

We split this skill into the rules it gives an agent

7 rules. About 0 are common, 7 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈7

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    No explicit "and therefore we're NOT doing X" reasoning

    line 24
  2. Distinctive:

    Any fixed constraints: must-have items (committed work, customer asks), must-exclude items (blocked, not ready)

    line 41
  3. Distinctive:

    Ask PM to provide the candidate list: "Paste the issues you're considering or describe them briefly — I'll help you structure the selection …

    line 52
  4. Distinctive:

    After presenting the proposal:

    line 126
  5. Distinctive:

    Don't impose a goal if PM doesn't want one — some teams work from a flat prioritized backlog and that's fine.

    line 141
  6. Distinctive:

    If PM has better data (actual closed-issue counts from recent sprints), use that.

    line 152
  7. Distinctive:

    Before presenting the sprint proposal:

    line 182

≈ “Common” is an estimate: at least 1 in 5 of the 372,429 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

sprint-plan

Scope a sprint from your backlog — select what to pull in, flag what to leave out, surface dependencies, and produce a proposed sprint with rationale PM can accept, adjust, or reject.

Why this exists

Sprint planning without a thinking partner defaults to: PM opens the backlog, picks things they recognize, fills up until it feels full, and hopes it's right. The failure modes are predictable:

  • Pulling in work without considering what it blocks or what it depends on
  • Capacity optimism (sprints fill at 100%; velocity is usually 60–80%)
  • Missing the 1–2 high-leverage issues that would advance the product most
  • No explicit "and therefore we're NOT doing X" reasoning

Piper's value here isn't running the planning for PM — it's being the thinking partner who asks the right questions before the sprint starts.

With the GitHub connector: Piper can pull actual open issues, read their labels and milestone assignments, check closed-issue velocity, and propose a specific sprint scope.

Without the GitHub connector: Piper asks PM to supply the candidate list and works as a structured sounding board — better than solo planning, just not automated.

Procedure

Step 1 — Establish the planning frame

Confirm with PM:

  • Sprint length: 1 week / 2 weeks / other
  • Team / capacity: who's working this sprint, any known absences
  • Velocity reference: how many issues/points does the team typically close? (If unknown, estimate from recent sprints)
  • Sprint goal: is there a theme or outcome this sprint is organizing around? (Optional, but dramatically improves selection)
  • Any fixed constraints: must-have items (committed work, customer asks), must-exclude items (blocked, not ready)

Step 2 — Pull or receive the backlog

With GitHub connector:

  • Query open issues from the relevant milestone or label
  • Filter to: unblocked items (no open blockers filed against them) + not assigned to a future milestone explicitly
  • Sort by: priority label if present, then by age (older backlog items often represent forgotten important work)
  • Surface top 2× velocity as candidates (more than will fit, so selection is deliberate)

Without GitHub connector:

  • Ask PM to provide the candidate list: "Paste the issues you're considering or describe them briefly — I'll help you structure the selection from there."

Step 3 — Apply the selection framework

For each candidate, Piper evaluates:

DimensionQuestionSignal
Goal alignmentDoes this advance the sprint goal?Deprioritize if no clear connection
Dependency checkDoes this block or get blocked by other sprint work?Surface the dependency; plan in the right order
Scope clarityIs this well-enough defined to work this sprint?"Needs spec" items should not be sprint candidates
Size fitDoes capacity math work out if this is included?Simple estimate — S/M/L, not points required
RiskIf this slips, does it cascade?Flag high-risk items; don't ignore them

This framework isn't run as a checklist for every item — Piper flags the issues where a dimension matters, not all dimensions for all issues.

Step 4 — Propose the sprint

Present a proposed sprint scope with rationale:

## Proposed sprint: [sprint name / dates]

**Goal**: [one sentence — what does a successful sprint look like?]

**Capacity**: [team members] × [sprint length] = ~[X] items at current velocity

---

### In — proposed sprint scope

| # | Issue | Why in |
|---|---|---|
| #[n] | [title] | [1-line rationale — goal alignment / dependency / customer impact] |
| #[n] | [title] | [rationale] |
| ...  | | |

**Sprint confidence**: [High / Medium / Low] — [one sentence on what makes this achievable or risky]

---

### Out — explicitly not this sprint

| Issue | Why out |
|---|---|
| #[n] — [title] | [reason: blocked / needs spec / future milestone / capacity] |
| #[n] — [title] | [reason] |

*"Out" is deliberate, not forgotten. Review these at next planning.*

---

### Watch list — items that might join if something slips

| Issue | Condition |
|---|---|
| #[n] — [title] | If [other item] finishes early |

---

### Dependencies and risks

- [Dependency or risk 1 — specific, with what to do about it]
- [Dependency or risk 2]

---

### Questions before starting

- [Any clarification needed from PM before the sprint locks]

Step 5 — Invite adjustment

After presenting the proposal:

  • "What would you change?"
  • "Is the goal right, or is there a higher-priority outcome this sprint should serve?"
  • "Anything in the Out list that should actually be In?"

The proposal is a starting point. PM owns the sprint.


Sprint planning without a goal

Sprint goals make selection dramatically easier — everything gets evaluated against one criterion. When PM doesn't have an explicit goal, Piper can help surface one:

"Looking at what's in the backlog, the natural organizing theme this sprint seems to be [X]. Would that work as the sprint goal? If so, it makes [issues Y and Z] clear priorities."

Don't impose a goal if PM doesn't want one — some teams work from a flat prioritized backlog and that's fine. But offering it is useful.


Capacity math (simple version)

PMs tend to over-commit sprints. Piper's default assumption without better data:

  • 1-person sprint at full availability → ~60–70% of raw time is "productive issue work" (accounting for meetings, async, context-switching)
  • Team velocity is usually 60–80% of what the sprint board shows when it fills up

If PM has better data (actual closed-issue counts from recent sprints), use that. If not, apply the conservative default and label it clearly: "This estimate is conservative — adjust if you know your actual velocity."


Handling "we don't use sprints"

Some teams (particularly early-stage or solo PMs) don't do formal sprints. The skill still applies as a periodic backlog review and prioritization:

  • "Help me pick what to focus on this week"
  • "Which of these 10 issues should I do first"

Replace "sprint" with "week" or "focus period" in the output. The framework — goal alignment, dependency check, scope clarity, capacity — applies either way.


Anti-patterns to avoid

Don'tWhyInstead
Fill the sprint to 100% of capacityNo room for unexpected workTarget 70–80% and name the buffer
Pull items without "why in" rationaleNo one remembers next sprint why they picked itEvery "in" item has a reason
Skip the "out" listThe "not this sprint" is a decision, not an omissionName what's out and why
Ignore dependenciesTwo sequential items in same sprint means the second can only start lateSurface the order constraint
Treat sprint plan as a commitmentSprints are forecasts, not promisesFrame as "what we're aiming for"
Plan without a goal when the team has oneMisses the organizing principleAsk for it; offer to surface one from the backlog

Quality checklist

Before presenting the sprint proposal:

  • Capacity frame is established (team, length, velocity)
  • Sprint goal is stated or absent-and-noted
  • Every "in" item has a 1-line rationale
  • "Out" list is explicit — not just "everything not in"
  • Dependencies between sprint items are flagged
  • Sprint confidence level is honest (not always "high")
  • PM is explicitly invited to adjust — proposal ≠ final

Example

Brief from PM: "Help me plan the next 2-week sprint. We're a team of 3, one person is part-time. Our focus this sprint is getting the onboarding flow ready for beta. GitHub is wired, so pull what you can."

Piper's output (abbreviated):

## Proposed sprint: [Beta Prep] — June 16–27

**Goal**: Get onboarding flow to beta-ready: a new user can sign up, complete setup, and reach their first meaningful action without assistance.

**Capacity**: 2.5 FTE × 2 weeks. At typical velocity (~8 medium issues), targeting 6–7 items.

---

### In — proposed sprint scope

| # | Issue | Why in |
|---|---|---|
| #412 | Fix onboarding step 2 validation | Blocking; reported by 3 users in closed beta |
| #389 | Add email confirmation flow | Required for beta launch — currently skipped |
| #401 | "What next?" empty state after setup | Without this, users complete setup and see nothing |
| #440 | Onboarding analytics events | Need to know where users drop before beta |
| #388 | Fix mobile viewport on setup step 3 | ~40% of signups are mobile; this is broken |
| #435 | Write onboarding help doc | Reduces support load; can ship async |

**Sprint confidence**: Medium — #389 (email confirmation) is the highest-risk item; if it takes longer than 3 days, it could crowd out #401.

---

### Out — explicitly not this sprint

| Issue | Why out |
|---|---|
| #312 — SSO integration | Not beta-required; no customer ask yet |
| #394 — Onboarding A/B test | Needs analytics (#440) first; defer to sprint 2 |
| #367 — Admin onboarding controls | Internal-facing; PM is the only admin right now |

---

### Dependencies

- #440 (analytics) should complete in week 1 so beta data is available from launch day
- #389 (email confirmation) blocks nothing else in sprint but is the riskiest item — start it Monday

---

### Questions before starting

- Is the empty state (#401) PM-approved in terms of copy/design, or does that still need a call?

Changelog

  • v1.0 (2026-06-15): Initial version. Goal-aligned sprint selection with explicit "in / out / watch" structure, dependency surfacing, and capacity math. Richer with GitHub connector but workable without.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.