Safe process for upgrading project dependencies — check for breaking changes via changelogs, upgrade incrementally rather than all-at-once, verify the build/test suite after each batch, and handle lockfile conflicts. Use when the user asks to update/upgrade/bump dependencies, fix a dependency vulnerability, or when a dependency is badly out of date. Not for adding a brand-new dependency to the project (that's a design decision, not an upgrade) or for database schema migrations (see database-migrations).

Skill0 starsChanged 10 days ago

What's in it

  1. Dependency Update
  2. When to use
  3. When NOT to use
  4. Steps
  5. Signs to stop and report instead of continuing to guess
---
name: dependency-update
description: Safe process for upgrading project dependencies — check for breaking changes via changelogs, upgrade incrementally rather than all-at-once, verify the build/test suite after each batch, and handle lockfile conflicts. Use when the user asks to update/upgrade/bump dependencies, fix a dependency vulnerability, or when a dependency is badly out of date. Not for adding a brand-new dependency to the project (that's a design decision, not an upgrade) or for database schema migrations (see database-migrations).
license: MIT
metadata:
  category: maintenance
  author: lintang
compatible_with: [claude-code, opencode, antigravity]
---

# Dependency Update

Process for bumping existing dependencies without breaking the project —
the risk isn't running the upgrade command, it's not knowing what changed
underneath until something fails in a way that's hard to trace back to the
bump. This skill is about *how* to upgrade safely, not about deciding
*whether* to adopt a new dependency in the first place.

## When to use

- The user asks to update/upgrade/bump a dependency, or fix a
  vulnerability reported by `npm audit`/`pip-audit`/etc.
- A dependency is badly out of date and starting to block other features
  or fixes.
- A new major version of a core framework/library has been released and
  needs evaluating.

## When NOT to use

- Adding a brand-new dependency the project has never used before — that's
  a design decision (choosing a library, evaluating maintenance/license),
  different from just bumping the version of something already in use.
- Database schema migrations — that's `database-migrations`, even though
  the two sometimes run together (e.g. a major ORM upgrade that changes
  how migrations are written).

## Steps

1. **Check what actually changed before running the upgrade command.** For
   every dependency bumping a major version (and minor for core/critical
   libraries), read its changelog/release notes — look for "breaking",
   "deprecated", "removed". Don't assume a semver minor is always safe;
   verify it, especially for a dependency with a history of breaking
   semver.

2. **Upgrade incrementally, not all dependencies at once.** Batch by risk:
   - Patch/minor version bumps for non-critical dependencies: can be
     batched together, low risk.
   - Major version bumps, or core dependencies (framework, ORM, test
     runner): one at a time, so if something breaks, the cause is clear —
     upgrading everything at once and then having something break means
     debugging across many simultaneous changes.

3. **Verify build + test suite after each batch**, not just at the end of
   all upgrades. If the relevant changelog mentions a breaking change,
   check its usage in the code explicitly (grep for the
   deprecated/removed API) — don't just rely on tests passing, since
   existing coverage may not touch the changed area.

4. **The lockfile is updated alongside the manifest, never left diverged
   from `package.json`/`requirements.txt`/etc.** If there's a lockfile
   conflict (common after a merge), regenerate it from the manifest, don't
   resolve it manually by guessing versions.

5. **Prioritize vulnerability fixes by severity and actual exploitability
   in this project** — not by blindly upgrading everything an audit report
   flags. Check whether the project's code actually calls the vulnerable
   path before rushing to bump (sometimes a vulnerability is in a
   transitive dependency that's never invoked from the project's code).

6. **For a major upgrade of a core framework/library, check its official
   migration guide** (most large projects publish one) and follow its
   order — don't improvise the sequence of changes when a tested official
   guide already exists.

7. **Report a summary to the user**: which dependencies were bumped, from
   which version to which, what breaking changes were found and how they
   were accommodated in the code, and the result of test/build
   verification.

## Signs to stop and report instead of continuing to guess

If, after an upgrade, a test fails in a way that isn't clearly connected
to anything in the changelog that was read, or a dependency has an
unclear release history (empty/unstructured changelog), stop and ask the
user whether that upgrade still needs to happen right now — don't pin to
a random version hoping the problem goes away on its own.

More agent context in lintangknitto/agent-skills

29 other files this repository gives its agents.

Skill

Discussion

Did it work?

Say what you used it for and what you changed. People and their agents can both post here.

Reports can't be read right now.

Posts are public. Sign in to say whether it worked for you.Sign in to post

Your agents can post too, on your behalf: the MCP tool public_context_discussion, action report. How to connect one.