Topping Out's second step: write one decision-complete BLUEPRINT under foreman/blueprints/ready/ (the head it serves, locked decisions, verification points, tasks, HALTs and outward items), to be cold-read by /f-plancheck and then cut into one-PR tickets by /f-schedule. No implementation. Use for /f-blueprint or after /f-survey. Not for open decisions (f-survey), not for cutting into tickets (f-schedule), not for building.

The file

We split this skill into the rules it gives an agent

9 rules. About 0 are common, 6 are distinctive, and 3 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈6

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 3

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Write one plan file that a later agent can execute.

    line 17
  2. Distinctive:

    Prefer close paraphrase or settled wording over rewrite.

    line 23
  3. Distinctive:

    If commission and context conflict, halt and surface, do not pick a side silently.

    line 24
  4. Very specific:

    First, the end-game lock: run node <skills>/f-signoff/endgame.mjs check --root <records root> (in lane mode, this lane's: add --lane <X>).

    line 32
  5. Very specific:

    If load-bearing choices are still open (architecture, data model, API, acceptance, or scope that changes the solution), stop and use …

    line 34
  6. Distinctive:

    If code reality conflicts with the agreement, surface the conflict.

    line 43
  7. Distinctive:

    Write exactly one file:

    line 49
  8. Distinctive:

    Prefer thin vertical slices of agreed capability over horizontal layering.

    line 79
  9. Distinctive:

    Do not implement, stage, commit, push, open a job, or run f-plancheck from this skill.

    line 118

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Topping Out: Blueprint

In Topping Out this plan is a project, never one job. After writing it: /f-plancheck <plan> (cold seats from other model families; it writes the gate: plancheck line), apply or answer its findings, then /f-schedule <plan> cuts it into jobs. So the plan must name, quoted exactly: the head (the one outcome it serves and how it's judged, e.g. the owner's walkthrough), the locked decisions (D-ids), the verification points (VP-ids, each with its cheaper wrong route to reject), the tasks, and every assumption, HALT and outward item (spend, live access, installs, owner decisions). Research and owner decisions are listed as such, never hidden inside a task.

Write one plan file that a later agent can execute. Do not implement, open a job, run f-plancheck, stage, commit, or push. (The owner or the foreman runs /f-plancheck afterwards, as a separate step.)

North star

Fidelity over cleverness. Capture the commission and what was already agreed in context. Do not expand, renegotiate, drop, or “improve” the deal.

  • Prefer close paraphrase or settled wording over rewrite.
  • If commission and context conflict, halt and surface, do not pick a side silently.
  • Completeness of the agreement, not completeness of the universe.
  • Tight and high-signal is good. Inventing detail to fill a template is not.

Capture the agreement in product terms; ground it in code terms; invent neither.

Preconditions

  1. First, the end-game lock: run node <skills>/f-signoff/endgame.mjs check --root <records root> (in lane mode, this lane's: add --lane <X>). Exit 1 (ENDGAME_PENDING) means the last job's end-game isn't finished: stop, name the missing steps, and finish them first (METHOD.md §10). Exit 2 or 3 is an error, never a pass.
  2. Extract the commission, locked decisions, constraints, exclusions, actors/boundaries, acceptance, and open items from the conversation and any survey block.
  3. If load-bearing choices are still open (architecture, data model, API, acceptance, or scope that changes the solution), stop and use f-survey. Do not invent them to finish the plan.
  4. Open items may remain only when they are empirical checks or explicitly labeled deferred with a default-if-silent or HALT until decided.

Exploration

Inspect the real codebase to ground the agreement, not to grow scope.

  • Confirm current paths, symbols, interfaces, patterns, tests, the repo's own scripts and gates (the repo profile names the gates), and dependencies the agreed work will touch.
  • Small scope: one bounded code-explorer question. Cross-cutting: independent explorers with non-overlapping questions.
  • If code reality conflicts with the agreement, surface the conflict; do not silently rewrite the commission.
  • Budgets: a latency, speed or size figure becomes a pass/fail VP only with a measured baseline (its anchor named); otherwise write it as estimate, and the VP records the measured figure.
  • Harness/measurement work: if the repo has a measurement or eval harness, the repo profile names it (its commands, what it grades, what a run costs). Plan its validation before first spend (the harness is checked sound before any paid run), keep capture separate from grading (the harness captures; whatever the repo uses as its grader grades), never put the plan's own acceptance text into a grading prompt, and list every paid run as an outward item. A repo with no such harness: say so and verify with its ordinary gates.

Plan file

Write exactly one file:

foreman/blueprints/ready/BLUEPRINT-YYYY-MM-DD_<short-slug>.md

File hygiene only (not job lifecycle): if deliberately postponed before any build, move it to foreman/blueprints/deferred/. Do not delete from this skill.

Header

  • Title · Date · Status (ready | blocked-on-decision)
  • Objective (faithful to commission)
  • Background (only context needed to understand the deal)

Body (in order)

  1. Commission capture, user outcomes and agreed behavior as settled; no product freestyle.
  2. Decisions (locked), table or list D0… with final wording only for choices already made.
  3. In scope / Out of scope, explicit fence; do not add “while we’re here.”
  4. Assumptions, marked as assumptions, not decisions.
  5. Unresolved, only rows that must not be invented at build; each has default if silent or HALT until decided.
  6. Done-When and verification, checkable acceptance from the agreement; positive and negative verification points with stable ids when useful; map to real repo commands where they exist. Each VP gets a risk level, so the strongest proof goes where a failure costs most: P0 breaks safety, money, privacy or data (proof: executed, plus a mutation probe on its guard); P1 breaks the main thing the work delivers (proof: executed; a code read never passes it); P2 a lesser path (the usual proof); P3 cosmetic or nice to have (a code read is enough). Write it as VP4 (P0): …; the tickets quote it verbatim and the acceptance ledger carries it.
  7. Grounding (descriptive), inventory: files to modify vs create (path + role); patterns to mirror with file/symbol evidence. Current state only.
  8. Interfaces (prescriptive), types, shapes, migrations, flags, boundary/error contracts required by the agreed work. Label clearly as future state. Omit speculative architecture.
  9. Ordered tasks T0…, implementation of the agreed commission only. Each task:

    • Owns, paths
    • Prereq / Blocked by, none or task ids
    • Outcome, end-to-end behavior this slice makes true
    • Trace, D* / Done-When / VP ids
    • Verify, an existing gate from the repo profile, or a documented script in the repo's own manifest, + expected signal (never invent a gate)

    Prefer thin vertical slices of agreed capability over horizontal layering. One context-window–sized task. Coding-agent work only (write / modify / test). No orphan steps that leave unintegrated work. No tasks for out-of-scope items.

  10. Risks, rollback, environment, thin; real constraints only.
  11. Post-implementation gates, only from the constitution the repo profile names (AGENTS.md or CLAUDE.md) and the gates listed in the repo profile. Never invent a gate.
  12. Plan check findings, the heading ## Plan check findings and an empty table | # | Finding (with its evidence) | Fate | Why |. /f-plancheck writes the gate: plancheck line; the foreman fills the table from its output (METHOD.md §13, the transfer step). /f-schedule refuses a blank fate.

Mark descriptive current state vs prescriptive future state so they cannot be mixed unmarked.

Code in the plan

Talk about code as grounding, not as the implementation:

IncludeExclude
Paths, modules, create vs modifyFull diffs / line-by-line patches
Contracts and shapes the deal requiresSpeculative interfaces not in the agreement
Patterns to mirror with evidenceRedesign freestyle
Real verify commands and signalsInvented gates or ops theater

Docs/process commissions may stay path-light; software commissions must be code-grounded enough for a cold agent.

Accuracy pass

Call spec-validator-fixer on the plan. It may correct only provably false descriptive claims about current code or scripts. It must preserve intended future state and all commission/decision wording. Re-read the final file: every referenced current path, symbol, and script exists (or is listed under Create).

Index

In the same pass as writing the blueprint, add a Ready entry to foreman/blueprints/README.md (create it from the package copy if missing): path, one sentence, and what gates it (usually "needs /f-plancheck"). When a blueprint is deferred, move its file to foreman/blueprints/deferred/ and its entry to Deferred, with the trigger that brings it back. When /f-schedule cuts it, add "→ foreman/projects/<slug>/" to its entry. Trust the disk: fix any entry that disagrees with it.

Report

Return:

  • plan path
  • what was captured (objective + decision count + task count)
  • validation result
  • any unresolved items left as default/HALT (not invented)
  • conflicts surfaced between agreement and codebase, if any

Do not implement, stage, commit, push, open a job, or run f-plancheck from this skill.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.