Advanced engineering analytics via Harness Software Engineering Insights (SEI) MCP. Configure sprint velocity and estimation accuracy tracking, engineering investment allocation breakdowns, sprint planning with capacity forecasts, and release readiness assessments. Use when asked about sprint analytics, investment allocation, sprint planning, capacity forecasting, or release readiness. Do NOT use for DORA metrics (use dora-metrics instead). Trigger phrases: sprint velocity, sprint analytics, investment allocation, capacity planning, sprint forecast, release readiness, engineering productivity, estimation accuracy, sprint planning, scope creep, code quality trends.

The file

We split this skill into the rules it gives an agent

10 rules. About 0 are common, 10 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈10

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    All required stages green (build, test, security, integration)

    line 133
  2. Distinctive:

    No unresolved critical or high CVEs

    line 141
  3. Distinctive:

    Verify story points are assigned before sprint start (not mid-sprint)

    line 170
  4. Distinctive:

    Check that completed stories are marked done within the sprint, not after

    line 171
  5. Distinctive:

    Ensure the issue tracker integration is syncing correctly

    line 172
  6. Distinctive:

    Check issue labeling conventions -- all issues should have a type (feature, bug, tech debt)

    line 175
  7. Distinctive:

    Add default categorization rules for unlabeled issues

    line 177
  8. Distinctive:

    Verify all pipeline stages have run for the release branch

    line 180
  9. Distinctive:

    Check that security scan results are available for the release artifacts

    line 181
  10. Distinctive:

    Ensure monitoring configuration has been validated in staging

    line 182

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

SEI Analytics

Configure sprint analytics, investment allocation, capacity forecasting, and release readiness assessments in Harness Software Engineering Insights.

Instructions

Step 1: Establish Scope

Confirm the user's org, team, and tracking period.

Call MCP tool: harness_list
Parameters:
  resource_type: "project"
  org_id: "<organization>"

Step 2: Identify the SEI Task

Determine which analytics the user needs:

  1. Sprint Analytics -- Velocity, estimation accuracy, scope change tracking
  2. Investment Allocation -- Engineering time breakdown by category
  3. Sprint Planning and Capacity Forecast -- Data-driven sprint planning
  4. Release Readiness Assessment -- Checklist for release go/no-go

Step 3: Configure Sprint Analytics

Gather from the user:

  • Team name and sprint length (weeks)
  • Tracking period (last N sprints)
  • Issue tracker integration (Jira, Azure DevOps, Linear)

Analyze sprint metrics:

Velocity:

  • Story points committed vs. completed per sprint
  • Velocity trend over the tracking period
  • Carryover rate (% of stories that spill into next sprint)

Estimation Accuracy:

  • Actual vs. estimated story points across sprints
  • Which issue types are consistently underestimated
  • Estimation accuracy trend (improving or degrading)

Scope Change:

  • Stories added mid-sprint (scope creep %)
  • Stories removed mid-sprint
  • Net scope change and its impact on completion rate

Delivery Composition:

  • Breakdown by issue type: features, bugs, tech debt, maintenance
  • Breakdown by priority: P0/P1 vs. lower priority
  • Team-level vs. individual-level trends

Step 4: Analyze Investment Allocation

Gather from the user:

  • Teams to analyze
  • Time period for analysis
  • Investment categories (features, bugs, tech debt, maintenance, ops)

Calculate allocation:

  • % of engineering time per category
  • Compare against target allocation (e.g., 70% features, 15% tech debt, 10% bugs, 5% ops)
  • Trend over time: is tech debt growing or shrinking?
  • Per-team breakdowns to identify teams disproportionately spending on bugs or ops

Present with:

  • Current allocation vs. target allocation
  • Recommendations for rebalancing
  • Impact of current allocation on velocity and quality trends

Step 5: Sprint Planning and Capacity Forecast

Gather from the user:

  • Sprint number, duration, and team size
  • Planned PTO, meetings, and other commitments

Calculate capacity:

  • Available engineering days = team size * sprint days - PTO - meeting overhead
  • Historical velocity per engineer per sprint
  • Recommended story points for the sprint (based on rolling average)

Risk factors to flag:

  • Large stories (>8 points) that could block the sprint
  • Dependencies on other teams
  • Carryover from previous sprint
  • Tech debt items that may slow feature work

Step 6: Release Readiness Assessment

Gather from the user:

  • Service name, version, target environment
  • Change summary and target release date

Assess readiness:

Code Quality:

  • Code coverage delta (current vs. threshold)
  • Static analysis findings (new warnings or errors)
  • Code review completion (all PRs reviewed and approved)

Pipeline Health:

Call MCP tool: harness_list
Parameters:
  resource_type: "execution"
  org_id: "<organization>"
  project_id: "<project>"
  • CI pipeline pass rate for the release branch
  • All required stages green (build, test, security, integration)

Testing:

  • Unit test pass rate and coverage
  • Integration test results
  • Performance test results vs. baseline

Security:

  • No unresolved critical or high CVEs
  • Security scan completed and approved
  • Compliance attestations present

Operational Readiness:

  • Monitoring and alerting configured for the release
  • Runbooks updated for new features
  • Rollback plan documented and tested

Present as a structured readiness report with GO/NO-GO recommendation.

Examples

  • "Show sprint velocity trends for the platform team" -- Analyze committed vs. completed points over the last N sprints
  • "How is our engineering investment split between features and bugs?" -- Calculate investment allocation with recommendations
  • "Help plan Sprint 24 based on our capacity" -- Calculate available capacity and recommend story point commitment
  • "Is the checkout-service v2.1 ready to release?" -- Run full readiness assessment with go/no-go recommendation
  • "Why are our sprints always over-committed?" -- Analyze estimation accuracy and scope change patterns

Performance Notes

  • Sprint analytics require consistent use of story points across the team -- mixed estimation methods reduce accuracy.
  • Investment allocation analysis needs accurate issue labeling -- unlabeled issues default to "unclassified" and skew results.
  • Capacity forecasts should account for context-switching overhead (typically 10-20% of engineering time).
  • Release readiness assessments should run at least 24 hours before the planned release date.

Troubleshooting

Velocity Data Inconsistent

  • Verify story points are assigned before sprint start (not mid-sprint)
  • Check that completed stories are marked done within the sprint, not after
  • Ensure the issue tracker integration is syncing correctly

Investment Allocation Missing Categories

  • Check issue labeling conventions -- all issues should have a type (feature, bug, tech debt)
  • Review the mapping between issue tracker labels and SEI categories
  • Add default categorization rules for unlabeled issues

Release Readiness Check Incomplete

  • Verify all pipeline stages have run for the release branch
  • Check that security scan results are available for the release artifacts
  • Ensure monitoring configuration has been validated in staging

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.