Turns a client brief (email, call notes, RFP, chat thread) into a priced freelance quote with scope, three-point estimates, buffer, pricing model, assumptions, exclusions, revisions, timeline, and payment terms, plus an optional proposal or statement of work. Use when the user asks to quote, price, estimate, scope, or bid on a project, write a proposal, or handle a change request. Works in English and Arabic.
In this repository13 other files it gives its agents.
- agent-ready-siteSkill
- arabic-copySkill
- arabic-localizationSkill
- arabic-seoSkill
- client-briefSkill
- design-tokens-extractorSkill
- product-sheetSkill
- rtl-uiSkill
- shared-server-deploySkill
- ui-inventorySkill
- vat-worksheetSkill
- video-readerSkill
- zatca-invoiceSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
13 rules. About 0 are common, 7 are distinctive, and 6 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈7
Distinctive · estimate
This author's own choices. Worth a look.
6
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 23
Never invent the user's rate, currency, or tax rate: If they are missing, ask. Until answered, use placeholders like [RATE], [CURRENCY], …
- Distinctive: line 24
Estimate in ranges: Every task gets low / likely / high hours.
- Distinctive: line 26
Everything not listed is out of scope: Write exclusions out by name.
- Very specific: line 29
Keep the client's language.
- Distinctive: line 35
Read the brief and write down, in short bullets:
- Distinctive: line 54
If the user wants the quote now anyway, proceed and turn each unanswered question into a written assumption.
- Very specific: line 74
Run scripts/estimate.py instead of doing this by hand:
- Distinctive: line 93
If the buffer would go above 30%, do not quote the whole project.
- Very specific: line 105
Read references/pricing-models.md for formulas, examples, and how to present options.
- Very specific: line 125
Default output is a quote in Markdown using references/quote-template.md (or .ar.md):
- Distinctive: line 139
When the client asks for something new:
- Distinctive: line 141
Check it against the signed scope.
- Very specific: line 142
If it is not, write a change request with references/change-request-template.md: what is asked, impact on hours, cost, and timeline, and …
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Freelance quote
Turn a messy brief into a quote the client can sign and the freelancer can deliver without losing money.
When to use
- "How much should I charge for this?", "Write a quote for this brief", "Estimate this project", "Turn these call notes into a proposal".
- A client asks for more work mid-project and the user needs a change request.
- The user wants the quote in Arabic, or in both languages.
When not to use
- Hourly time tracking or invoicing for work already done. That is an invoice, not a quote.
- Drafting a binding contract. You can draft terms, but say clearly it is not legal advice and the user should have a lawyer review contracts for large or high-risk work.
Hard rules
- Never invent the user's rate, currency, or tax rate. If they are missing, ask. Until answered, use placeholders like
[RATE],[CURRENCY],[VAT %]. - Estimate in ranges. Every task gets low / likely / high hours. A single number hides risk.
- Make the buffer explicit. Show it as its own line with the reason. Never bury padding inside tasks.
- Everything not listed is out of scope. Write exclusions out by name.
- Flag scope risks in their own section: vague requirements, third-party dependencies, content the client must supply, unknown integrations.
- Ask only questions that change the price or timeline. Five sharp questions beat twenty generic ones.
- Keep the client's language. If the brief is in Arabic, write the quote in Arabic unless told otherwise. Use
references/quote-template.ar.md.
Workflow
1. Extract
Read the brief and write down, in short bullets:
- Goal: the business outcome the client wants (more sales, launch by a date, replace an old system).
- Deliverables: the concrete things they will receive (pages, screens, features, documents, files).
- Constraints: deadline, budget hints, tech stack, brand rules, languages, hosting.
- Stakeholders: who approves, who supplies content.
- Signals: words like "simple", "just", "quick", "like X but" are risk markers. Note them.
2. List unknowns and ask
List every unknown, then keep only the ones that move the price or the date. Typical high-value questions:
- Who supplies copy, images, and translations? By when?
- How many rounds of revisions do you expect?
- Which integrations (payments, CRM, ERP, auth) and do they have API access ready?
- Is there a hard launch date, and what happens if it slips?
- Who hosts and maintains it after launch?
- What is the budget range? (Ask once, politely. It sets the pricing model.)
If the user wants the quote now anyway, proceed and turn each unanswered question into a written assumption.
3. Break down the work
Split each deliverable into tasks of 2 to 16 hours. Anything bigger is not understood yet; split it again or mark it as a discovery task. Always include the tasks people forget:
- Discovery and kickoff, project management and calls (often 10 to 15% of build time)
- Content entry, QA and cross-browser/device testing, accessibility pass
- Deployment, DNS/hosting setup, handover and documentation
- Revisions (as their own line, tied to the revision rounds you promise)
4. Estimate with three points
For each task: optimistic (O), most likely (M), pessimistic (P) hours.
- PERT expected hours:
E = (O + 4M + P) / 6 - Standard deviation per task:
SD = (P - O) / 6 - Project SD:
sqrt(sum of task SD²) - A reasonable high-confidence total:
sum(E) + 1.65 × project SD(about 95% one-sided, assuming independent tasks)
Run scripts/estimate.py instead of doing this by hand:
python3 scripts/estimate.py tasks.csv --rate 75 --currency USD --buffer 15 --vat 15
python3 scripts/estimate.py tasks.json --rate 400 --currency SAR --buffer 10 --format jsonCSV columns: deliverable,task,low,likely,high (optional rate column overrides the global rate per row). JSON: a list of objects with the same keys. See examples/.
5. Add buffer, with a reason
Pick a buffer and write why:
| Situation | Buffer |
| Clear spec, familiar stack, responsive client | 5 to 10% |
| Normal project, some unknowns | 10 to 20% |
| New stack, third-party APIs, many stakeholders, vague brief | 20 to 30%, or split off a paid discovery phase |
If the buffer would go above 30%, do not quote the whole project. Quote a paid discovery or first phase and re-quote after.
6. Pick the pricing model
| Model | Use when | Watch out for |
| Fixed price | Scope is clear and stable | Scope creep. Needs tight exclusions and a change process |
| Milestones (fixed per phase) | Larger projects with natural phases | Define what "done" means for each milestone |
| Day or hourly rate | Scope is unclear, ongoing, or client-led | Clients fear open bills. Give an estimate range and a cap they must approve to exceed |
| Retainer | Ongoing support, maintenance, content | Define included hours, rollover rules, response times |
| Value-based | The outcome has a clear, large business value and you can influence it | Needs trust and a client who talks about outcomes. Anchor the price to value, not hours |
Read references/pricing-models.md for formulas, examples, and how to present options.
Offering two or three options (for example, Essential / Standard / Extended scope) helps clients say yes to one instead of no to all.
7. Write the terms
Every quote includes:
- Assumptions: what you believe is true (client supplies content by a date, one point of contact, etc.).
- Exclusions: named items not included (copywriting, photography, hosting fees, third-party licenses, ongoing maintenance, SEO campaigns, translations).
- Revision rounds: number per deliverable and what counts as a round (one consolidated list of feedback).
- Change requests: anything outside scope is quoted separately before work starts. See
references/change-request-template.md. - Timeline: phases with dates or weeks, and the client dependencies each one waits on. State that delays in client input move the dates.
- Payment terms: deposit (commonly 30 to 50% before work starts), milestone payments, final payment before handover or launch. Optional: late fee, ownership transfer on full payment. Present these as options for the user to choose.
- Taxes: a separate line, e.g. VAT at the rate the user supplies. Do not assume a rate or whether the user is registered.
- Validity: the quote expires, usually 14 or 30 days.
- Not legal advice note when you draft contract terms.
8. Output
Default output is a quote in Markdown using references/quote-template.md (or .ar.md):
- Summary (2 to 3 lines: what, by when, total range)
- Scope table: deliverable, tasks, hours (expected), amount
- Subtotal, buffer line, VAT line, total
- Timeline, payment terms, assumptions, exclusions, revisions, change process, validity
- Open questions (if any remain)
Offer next: a full proposal (references/proposal-template.md) or a scope of work (references/scope-of-work-template.md).
Round amounts sensibly (to the nearest 10 or 50 of the currency). Show hours to one decimal internally; clients usually see deliverables and amounts, not hours, unless they bill hourly.
Change requests mid-project
When the client asks for something new:
- Check it against the signed scope. If it is listed, do it.
- If it is not, write a change request with
references/change-request-template.md: what is asked, impact on hours, cost, and timeline, and what it replaces if the budget is fixed. - Work starts only after written approval.
Verify before you hand it over
- No invented rate, currency, or tax rate. Placeholders are marked where the user has not answered.
- Every deliverable in the brief appears in scope or in exclusions.
- Buffer is a separate line with a reason.
- Totals add up (re-run
estimate.pyif you changed numbers). - Assumptions, exclusions, revisions, change process, payment terms, and validity date are present.
- Scope risks are listed.
- Language matches the client. Arabic output uses Arabic punctuation (، ؛ ؟) and reads naturally.
Files
scripts/estimate.py: PERT estimates, buffer, VAT, totals as a Markdown table or JSON.references/pricing-models.md: pricing models, formulas, presenting options.references/quote-template.md,references/quote-template.ar.md: quote templates.references/proposal-template.md: full proposal.references/scope-of-work-template.md: statement of work.references/change-request-template.md,references/change-request-template.ar.md: change requests.references/questions.md: discovery questions by project type.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.