agentleFS
HeyvhuangHeyvhuang/ship-faster/skills/workflow-execute-plans/SKILL.md

workflow-execute-plans

Skill337 starsChanged 10 months agoMITView on GitHub

Execute written implementation plans: first read and critically review the plan, then implement in small batches (default 3 tasks), produce verification evidence per batch and pause for feedback; must stop immediately and ask for help when blocked/tests fail/plan unclear. Trigger words: execute plan, implement plan, batch execution, follow the plan.

The file

Show its rules and text

We split this skill into the rules it gives an agent

14 rules. About 0 are common, 9 are distinctive, and 5 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈9

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 5

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    If critical issues found: Stop first, present concerns as 1-3 bullet points, let human confirm before starting execution.

    line 35
  2. Distinctive:

    Run verification per plan (tests / build / typecheck / lint / manual verification steps)

    line 46
  3. Very specific:

    Update task status in logs/state.json

    line 50
  4. Distinctive:

    After each batch, report three things:

    line 55
  5. Very specific:

    Use review-merge-readiness for a conclusive review on this batch (especially for cross-module changes, risky changes, or approaching merge)

    line 61
  6. Distinctive:

    If feedback requests changes: fix first, re-verify, then continue next batch

    line 70
  7. Distinctive:

    If feedback is OK: continue to next batch (still default 3 tasks)

    line 71
  8. Distinctive:

    When all tasks are complete and verified:

    line 75
  9. Distinctive:

    Run full tests/build (per project conventions)

    line 76
  10. Very specific:

    Write 05-final/summary.md (what was done/how verified/risks & rollback/next steps)

    line 77
  11. Very specific:

    Do a skill-evolution Evolution checkpoint (3 questions).

    line 78
  12. Very specific:

    If finishing-a-development-branch skill exists: follow that skill to complete merge/PR/cleanup options

    line 79
  13. Distinctive:

    Every batch requires verification and reporting, then wait for feedback

    line 93
  14. Distinctive:

    When blocked, stop—don't guess

    line 94

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Executing Plans (Batch Execution + Checkpoints)

Goal

Reliably turn a "written plan file" into implementation results, avoiding drift or accumulated risk from doing everything at once.

Core strategy: Batch execution + pause for feedback after each batch.

Input/Output (Recommended for Chaining)

Input (pass paths only):

  • plan_path: Plan file (usually in run_dir/03-plans/)
  • repo_root
  • run_dir

Output (persisted):

  • Plan execution status: logs/state.json (or 03-plans/<plan>-status.md)
  • Per-batch verification evidence: append to the corresponding plan file or 05-final/ summary

Execution Flow

Step 1) Read and Review Plan (Critical Review First)

  1. Read plan_path
  2. Review if the plan has these issues:
    • Missing dependencies (packages to install/env vars/external services)
    • Task granularity too large (can't verify, hard to rollback)
    • Missing acceptance criteria or verification commands
    • Obviously wrong task ordering
  3. If critical issues found: Stop first, present concerns as 1-3 bullet points, let human confirm before starting execution.

Rule: Don't "guess while doing". Clarify when plan is unclear.

Step 2) Batch Execution (Default 3 Tasks per Batch)

Execute the first 3 tasks from the plan, then stop and report.

For each task:

  1. Mark as in_progress
  2. Execute strictly per plan (don't expand scope)
  3. Run verification per plan (tests / build / typecheck / lint / manual verification steps)
  4. Mark as completed

Status recording (choose one, prefer structured):

  • Update task status in logs/state.json
  • Or maintain checklist in plan_path ([ ]→[x]), recording verification results alongside

Step 3) Batch Report (Must Pause for Feedback)

After each batch, report three things:

  • What changed: Which files changed/what was implemented (brief)
  • Verification: What verification was run, what were the results (key info only, no long logs)
  • Next batch: Which 3 tasks are next

Optional but recommended:

  • Use review-merge-readiness for a conclusive review on this batch (especially for cross-module changes, risky changes, or approaching merge)

Last line must be:

Ready for feedback.

Then wait for human feedback—don't automatically continue to next batch.

Step 4) Continue Based on Feedback

  • If feedback requests changes: fix first, re-verify, then continue next batch
  • If feedback is OK: continue to next batch (still default 3 tasks)

Step 5) Wrap Up (After All Complete)

When all tasks are complete and verified:

  • Run full tests/build (per project conventions)
  • Write 05-final/summary.md (what was done/how verified/risks & rollback/next steps)
  • Do a skill-evolution Evolution checkpoint (3 questions); if user chooses "want to optimize", run skill-improver based on this run_dir to produce minimal patch suggestions
  • If finishing-a-development-branch skill exists: follow that skill to complete merge/PR/cleanup options

When to Stop and Ask for Help (Hard Rules)

Encounter any of these, stop execution immediately and report the issue:

  • Blocked mid-way (missing dependency, wrong environment, permission issues)
  • Tests/verification failed and can't quickly identify the cause
  • Plan step unclear (can't determine correct implementation approach)
  • Action that could cause data loss or wide-ranging side effects appears but plan doesn't include confirmation point

Remember

  • Review plan critically before starting
  • Small batch execution (default 3 tasks)
  • Every batch requires verification and reporting, then wait for feedback
  • When blocked, stop—don't guess

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.