Builds a sprint plan for a team or solo developer: one pillar-aligned goal, day-sized tasks that each end in a check, dependencies, capacity with buffer, AI-agent estimates with review budgets and vibe-debt paydown, written to production/sprints/. Not for whole-project scope (use game-scope-check).

The file

We split this skill into the rules it gives an agent

12 rules. About 0 are common, 9 are distinctive, and 3 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈9

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 3

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Use before a new sprint, when a solo developer wants to structure the next one or two weeks, right after a retrospective, when a milestone …

    line 33
  2. Distinctive:

    Scope tiers flex the sprint: Must / Should / Could / Won't.

    line 60
  3. Distinctive:

    Run these (a failure just means "no data".

    line 71
  4. Distinctive:

    If velocity data is missing, say this sprint establishes the baseline and plan conservatively.

    line 96
  5. Very specific:

    If the critical path is longer than the sprint, rescope or split across sprints.

    line 161
  6. Distinctive:

    If Remaining is negative: cut Coulds, then Shoulds.

    line 232
  7. Distinctive:

    Verify actual far above plan: your verify ratios are wrong.

    line 260
  8. Distinctive:

    Ask the agent for evidence (test output, screenshot) before you accept "done".

    line 279
  9. Very specific:

    Write production/sprints/sprint-NN.md (ask before overwriting), following ${CLAUDE_PLUGIN_ROOT}/templates/sprint-plan.md with the AI …

    line 301
  10. Distinctive:

    Every task is at most 8 hours total and has a "Done when" check.

    line 352
  11. Distinctive:

    Every A or AL task has a separate verify estimate that follows the ratios (or calibrated ones).

    line 353
  12. Distinctive:

    Must stays at or under about 60% of plannable hours.

    line 355

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

AlterLab GameForge -- Sprint Planning

Game sprints fail for different reasons than software sprints. A business-app team struggles with unclear requirements; a game team struggles with cross-discipline dependencies and the unpredictability of fun. You can build an inventory system exactly to spec and discover in the playtest that it makes the game worse. So a game sprint plans discovery time (spikes, feel passes, playtests) as real work, not as leftovers.

There is a newer failure mode. With Claude Code or a similar agent, code arrives fast, and it is easy to plan a sprint as if generation were the whole job. It is not. Someone still has to run the checks, read the diff, play the change and notice what the agent added that nobody asked for. This workflow budgets that verification on every task, and reserves capacity to pay down the "vibe debt" that accumulates when agent-written code is accepted faster than it is understood.

The output is a sprint plan file in production/sprints/ that a team, a solo developer, or a coding agent working from task cards can execute against.

When to Use / When Not To

Use before a new sprint, when a solo developer wants to structure the next one or two weeks, right after a retrospective, when a milestone needs decomposing, or when design work from game-gdd-author or game-design-review must become executable tasks.

Instead of this skill...Use
Is the whole project too big for the date?/gameforge:game-scope-check
Reviewing how the last sprint went/gameforge:game-retrospective
Milestone dates, risk and publisher-facing schedule/gameforge:game-producer
Moment-to-moment agent build loop for one task/gameforge:game-vibe-code
Coordinating several studio roles on one problem/gameforge:game-team-orchestrator
A 48-72 hour jam schedule/gameforge:game-jam-mode

Critical Rules

  1. One goal per sprint. A single sentence that defines success, framed as a player or project outcome ("testers can finish one full run"), not a feature list. Ship everything but miss the goal and the sprint failed.
  2. Tasks are at most one day and end in a check. More than 8 hours of human time means decompose further. Every task names how "done" is decided: acceptance check IDs from the GDD, a test command and its expected result, or a playtest observation.
  3. Every agent-built task carries a verify budget. Estimate build time and verify time separately. A task whose verification was skipped is not done, whatever the agent reported.
  4. Buffer after estimating. Subtract 20% of capacity for teams and 30% for solo developers (rules of thumb) for meetings, build breaks, hardware, and "I'll just refactor this one thing".
  5. Dependencies are first-class. A blocked task is not ready. Map chains, find the critical path, schedule blockers first.
  6. Scope tiers flex the sprint. Must / Should / Could / Won't. Cutting a Could on Wednesday is healthy; cutting a Must on Friday is a crisis.
  7. Velocity honesty. Plan from measured completion in production/sprints/velocity.md, not from hope. If agents doubled your commits but not your completed Musts, your velocity did not double.
  8. Pay down vibe debt every sprint. A fixed slot, sized from the last retrospective, not whatever is left over.
  9. Trace the goal to a pillar. Infrastructure sprints are fine; call them out. A goal that serves no pillar and no infrastructure need is drift; flag it.

Step 0: Gather Context

Run these (a failure just means "no data"; note it and continue):

git log --oneline -20
git status --short
git branch --list
gh issue list --limit 15 --state open

Read when present:

  • .gameforge/project.json -- phase, engine, pillars.
  • production/session-state/active.md -- current focus, decisions, blockers.
  • The latest production/sprints/sprint-NN.md and production/sprints/sprint-NN-retro.md -- carry-over, retro actions, the AI lens findings (vibe debt, review cost).
  • production/sprints/velocity.md -- planned vs completed history.
  • design/gdd.md §13 (acceptance criteria) and §17 (milestones); design/systems-index.md.
  • production/milestones/ -- the current milestone's definition of done.

Then ask one AskUserQuestion with up to four questions, offering defaults:

  1. Sprint length -- 1 week (solo default) or 2 weeks (team default).
  2. Who is available, and for how many days (note PTO, part-time, contractors).
  3. How will most work be built -- by hand, agent-assisted (a human drives, the agent drafts), or agent-led (the agent implements from task cards, the human verifies).
  4. Which milestone this sprint serves, if production/milestones/ does not make it obvious.

If velocity data is missing, say this sprint establishes the baseline and plan conservatively.

Step 1: Sprint Goal

Format: "By the end of this sprint, [deliverable] is [state] so that [value]."

GOOD: "By the end of this sprint, the core combat loop is playable with 3 enemy types so that
       we can run the first combat playtest on Friday."
GOOD: "By the end of this sprint, save/load round-trips all current game state so that
       playtesters can resume sessions."
BAD:  "Work on combat stuff."            (not evaluable)
BAD:  "Fix bugs and add features."       (two goals)

Serves pillar: [name]  |  Milestone: [name]  |  Goal check: [how we will know on the last day]

Step 2: Task Decomposition

Break the goal into features, features into tasks, tasks into sub-tasks until each is at most one day of human time (build plus verify). Add non-feature work: bug fixes, retro actions, vibe-debt items, reviews, playtests.

TASK CARD
ID:          S07-03
Title:       Dash: implement cooldown and stamina cost
Done when:   AC-002-2 and AC-002-4 pass (`npm run check`), dash capture attached
Build mode:  H (by hand) | A (agent-assisted) | AL (agent-led)
Build est:   2h      Verify est: 1.5h      Total: 3.5h
Owner:       Sam            Discipline: code
Depends on:  S07-01         Tier: Must          Spike: no
Out of scope: air dash, dash VFX

Sizing (total human hours):

TotalTypical task
1-2 hKnown bug with a repro, a config change, one knob added to a tuning file
3-4 hSmall system with a clear spec and checks
5-6 hSignificant task with some unknowns
7-8 hAt the ceiling; decompose if at all possible
> 8 hMust be split

Spikes. Unknown technology or an untested approach gets a time-boxed spike first ("Spike: can Jolt handle 200 stacked crates at 60 fps on the Steam Deck? max 4h"). A spike produces a decision and a note, not shippable code. Agents make spikes cheap; keep the time box anyway.

Feel passes. Anything whose success is "it feels right" gets an explicit tuning task with a playtest check. These do not compress with agents.

Step 3: Dependency Mapping

The usual chain is design spec -> art/audio asset -> code integration -> QA verification, with placeholders letting code start before final assets land.

S07-01 Design dash rules (§5.2 locked)
  -> S07-03 Implement cooldown + stamina (AL)
       -> S07-06 Integrate dash SFX (needs S07-04 audio)
            -> S07-09 QA: regression run + playtest check AC-002-5
CRITICAL PATH: S07-01 -> S07-03 -> S07-06 -> S07-09 = 11h across 3 people

If the critical path is longer than the sprint, rescope or split across sprints. For solo developers every chain is sequential. Discipline-by-discipline chains and a fuller risk catalog are in ${CLAUDE_SKILL_DIR}/references/planning-catalogs.md; read it for team sprints with art, audio and QA hand-offs, or when the user asks for Kanban.

Step 4: Estimating with AI Agents

Agents change which work is cheap, not how much judgment a game needs. Read ${CLAUDE_SKILL_DIR}/references/agent-estimation.md before estimating any A or AL task; it has the evidence behind this table, per-task-type verify checklists and a calibration worksheet.

Speeds up a lotSpeeds up somewhatBarely speeds up
Boilerplate, UI wiring, menusGameplay systems with a written spec and checksGame feel and tuning (needs playing)
Save/load and data plumbingBug fixes with a reliable reproLevel and content authoring that needs taste
Editor tools, debug overlays, cheat menusShader and VFX tweaks judged by screenshotArt direction, hero assets, audio mix
Test harnesses, AI-vs-AI balance simulatorsPorting between frameworks with testsPlaytests and synthesizing feedback
Greybox prototypes and spikesRefactors covered by testsPerformance on real target devices
Converting literals to tuning filesLocalization plumbingMultiplayer authority and anti-cheat
Architecture changes; platform certification and store submission

Verify budget (GameForge rules of thumb, replace with your own ratios after three sprints):

Build modeVerify estimateVerification includes
Hnormal review timecheck command, review by a second person on teams
Aabout 30-50% of build timecheck command, read the diff, play the change
ALat least equal to build timecheck command, read the diff or a targeted review, play the change, look for out-of-scope additions, confirm knobs not literals

Parallel agent sessions multiply the verify queue, not capacity. The 2026 Vibe Jam winner ran two or three Claude Code sessions on separate subsystems and spent most of the human time on planning and playing. Plan no more concurrent AL tasks than the owner can verify the same day.

Step 5: Vibe-Debt Paydown Slot

Reserve 10-15% of capacity every sprint (rule of thumb; use the high end after an agent-led sprint or when the last retro's AI lens flagged debt). Candidates:

  • Agent commits merged without review in the last sprint (count them in the retro).
  • Duplicate code paths for the same behavior; dead code; leftover debug hooks.
  • Oversized files (single-file web games grow past a few thousand lines quickly); split them.
  • Gameplay literals that never moved into tuning files.
  • Systems with no tests around agent-written logic; flaky tests from unseeded randomness.
  • Stale CLAUDE.md or project notes the agent relies on.
  • Findings from /gameforge:game-code-review, TODO/FIXME markers, high-churn files.

Paydown tasks get checks like any other ("dash.gd under 300 lines; tests green; no literal in movement code").

Step 6: Scope Tiering

TierRuleShare of capacity (rule of thumb)
MustThe goal fails without it; scheduled first, protectedat most 60%
ShouldStrengthens the goal; cut only under real pressureabout 25%
CouldPolish and stretch; cut first, no guiltabout 15%
Won'tConsidered and deferred; written down so it is not relitigated0%

Step 7: Capacity

Per person:  available days  x  productive hours/day (5-6, rule of thumb)  =  raw hours
Team raw hours                                                [ ]
- Buffer (20% team / 30% solo)                                [ ]
- Vibe-debt slot (10-15%)                                     [ ]
- Ceremonies, playtests, reviews not already in task cards    [ ]
= Plannable hours                                             [ ]

Planned task totals (build + verify):  Must [ ] | Should [ ] | Could [ ] | Remaining [ ]

If Remaining is negative: cut Coulds, then Shoulds. Still negative: the goal is too ambitious. Rescope the goal; do not "try harder". Verify hours count against the person who verifies, which on a solo project is always the developer.

Step 8: Risks

Name three to five risks for this sprint with an observable trigger.

RiskProbImpactMitigationTrigger (when to act)
Agent-built dash regresses movementMHMovement tests in the check command; revert, do not patch overAny movement AC goes red
Audio for S07-06 lateMMPlaceholder SFX; integrate final in S08Not delivered by Wednesday
Engine or tool update mid-sprintLHPin engine and tool versions for the sprintUpdate prompt appears
Verify queue backs upMMCap concurrent AL tasks at 2More than 2 AL tasks awaiting verify

Step 9: Velocity Calibration

Append one planned row to production/sprints/velocity.md now; the retrospective fills in actuals.

| Sprint | Dates | Planned h | Done h | Rate | Verify plan h | Verify actual h | AL/A/H tasks | Agent-traced defects | Notes |
|--------|-------|-----------|--------|------|---------------|-----------------|--------------|----------------------|-------|
| S07 | 11-09..11-13 | 26 | -- | -- | 9 | -- | 3/4/2 | -- | first sprint with AL tasks |
  • Average completion under 80%: overcommitting; cut planned hours by the gap.
  • Over 95%: room for one more Should or Could.
  • Wild swings (50% then 95%): fix estimation before raising scope.
  • Verify actual far above plan: your verify ratios are wrong; raise them before adding AL tasks.
  • Completion under 75% for three sprints running: run /gameforge:game-scope-check before planning the next sprint.

Solo Developer and Kanban Mode

For one or two people, sprint ceremonies can cost more than they return. Offer Kanban: Backlog -> In Progress (WIP limit 2-3 solo, 3-4 for a pair) -> Verify -> Done, with a 15-minute weekly review. Keep the Verify column: with agents it is where work piles up. Details, swimlanes and tool options are in ${CLAUDE_SKILL_DIR}/references/planning-catalogs.md.

Working with AI Coding Agents

How to run the planned sprint when tasks are built with Claude Code or a similar agent.

  • Task card = prompt. Hand the agent the card, the GDD sections it references and the project's CLAUDE.md. Fresh session per task; one long-lived session only for context-heavy bugs.
  • Check command first. The card's "Done when" names a command that returns pass or fail (npm run check, a headless Godot test run, Unity -runTests, an Unreal automation filter). Ask the agent for evidence (test output, screenshot) before you accept "done".
  • One task, one commit. Small diffs; when a change regresses, revert it rather than patching on top. Commits from agent sessions keep their co-author trailer so the retrospective can count them.
  • Keep the plan live. At the end of each working session, update production/session-state/active.md (Now = current card, Next = next card, Blocked on) and the card's status in the sprint file.
  • Log what the retro will need. Per task: build mode, actual verify hours, and whether a later defect traced back to it. Without this the AI lens in /gameforge:game-retrospective is guesswork.
  • Route the work. Build loops go through /gameforge:game-vibe-code; generated art, audio or voice go through /gameforge:game-ai-assets so provenance is logged as it is made.

Prompt pattern for an AL task:

Implement task S07-03 from production/sprints/sprint-07.md. Read only the card, GDD §5.2 and §9,
and CLAUDE.md. Read knobs from data/tuning/dash.tres; no literals. Stop when AC-002-2 and
AC-002-4 pass under `godot --headless -s addons/gut/gut_cmdln.gd -gexit`, show me the output,
and list every file you changed. Do not touch anything listed under "Out of scope".

Output

Write production/sprints/sprint-NN.md (ask before overwriting), following ${CLAUDE_PLUGIN_ROOT}/templates/sprint-plan.md with the AI columns below. Append the planned row to production/sprints/velocity.md and update production/session-state/active.md.

# Sprint 07 -- 2026-11-09 to 2026-11-13 (5 working days)
**Goal:** By the end of this sprint, dash is playable with cooldown, stamina cost and SFX so that
Friday's playtest can judge movement feel.
**Pillar:** Read the current | **Milestone:** M1 Prototype | **Goal check:** 4/5 testers chain two dashes unprompted

## Capacity
| Person | Role | Days | Raw h | Notes |
|---|---|---|---|---|
| Sam | code + design | 5 | 27 | solo; 30% buffer |

Raw 27 h - buffer 8 h - vibe-debt slot 3 h (S07-08) = **16 h plannable** for Must/Should/Could.

## Tasks
| ID | Task | Mode | Build h | Verify h | Owner | Depends | Tier | Done when | Status |
|---|---|---|---|---|---|---|---|---|---|
| S07-01 | Lock dash rules (§5.2) | H | 1 | 0.5 | Sam | -- | Must | §5.2 reviewed, knobs in §9 | Not started |
| S07-03 | Cooldown + stamina | AL | 2 | 2 | Sam | S07-01 | Must | AC-002-2, AC-002-4 green | Not started |
| S07-05 | Dash debug overlay | AL | 1 | 0.5 | Sam | S07-03 | Should | overlay toggles with F3 | Not started |
| S07-08 | Split player.gd (900 lines) | A | 2 | 1 | Sam | -- | Debt slot | tests green, no file > 300 lines | Not started |

## Won't (this sprint)
- Air dash -- needs the stamina tuning from Friday's playtest first.

## Dependency map
S07-01 -> S07-03 -> S07-05 ; S07-08 independent

## Risks
| Risk | Prob | Impact | Mitigation | Trigger |
|---|---|---|---|---|

## Definition of Done (every task)
- [ ] Its "Done when" check passes and the evidence is linked or pasted
- [ ] Diff read (or targeted review for AL tasks); nothing out of scope added
- [ ] No gameplay literals; knobs live in the tuning file
- [ ] Played in a build, not only tested
- [ ] AI-generated assets, if any, logged with provenance
- [ ] Status and verify hours updated in this file

## Carry-over from Sprint 06
| Task | Reason |
|---|---|

Quality Criteria

  • The goal is one evaluable sentence with a pillar, a milestone and a goal check.
  • Every task is at most 8 hours total and has a "Done when" check.
  • Every A or AL task has a separate verify estimate that follows the ratios (or calibrated ones).
  • A vibe-debt slot exists and is filled with named tasks.
  • Must stays at or under about 60% of plannable hours; the buffer is applied after estimating.
  • Dependencies are mapped and blockers scheduled first; at least three risks have triggers.
  • The plan cites velocity history when it exists and appends a row to velocity.md.
  • Anyone, including an agent reading the file, can tell what to do first, second and third.

Example Requests

RequestApproach
"Plan our next two-week sprint."Full Steps 0-9 and the output file.
"Solo dev, plan my week."1-week sprint, 5-8 cards, 30% buffer, one debt task, one or two risks.
"We keep missing commitments."Step 9 first: planned vs done and verify plan vs actual over 3-5 sprints.
"Claude builds most of our code now. How do we plan?"Step 4 and 5 in depth; set AL verify ratios; cap concurrent AL tasks.
"Our artist has two days this sprint."Front-load art on those days, placeholders as mitigation, code after delivery.
"Turn the GDD milestone into tasks."Pull §13 checks and §17 done criteria straight into "Done when".

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.