deepwork
Skill0 starsChanged 55 days agoMITView on GitHub
Structured workflow for large, high-risk, multi-phase coding efforts with dependencies and review gates. Do not activate for routine multi-file changes. If superpowers:writing-plans is installed, use that instead.
3 other projects use a version of this, 2 of them edited.
Adopted by
Most recently taken up by
- Jancera/skillsedited, first seen Oct 5, 2026
- akitaonrails/my-skillsedited, first seen Sep 17, 2026
- mdrubelamin2/omc-slimtheir own version, first seen Sep 7, 2026
Other versions3 projects use a version of this.
Word for word · 0
None found.
Edited · 2
- akitaonrails/my-skills★ 28389% same
- Jancera/skills★ 116% same
Wrote their own version · 1
- mdrubelamin2/omc-slim★ 1same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository6 other files it gives its agents.
- clonedepsSkill
- codemapSkill
- omcs-configSkill
- orchestrateSkill
- reflectSkill
- verification-planningSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
25 rules. 1 is common, 13 are distinctive, and 11 are very specific to this project.
1
Common
Most of the 3 edited versions we read keep these.
13
Distinctive
This author's own choices. Worth a look.
11
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Common: line 18
Do not infer Deepwork merely because a task touches multiple files.
- Distinctive: line 24
When deepwork is active, the orchestrator must manage the work as a scheduler, not as the default implementation worker.
- Very specific: line 31
create and maintain a local markdown progress file under .slim/deepwork/.
- Distinctive: line 37
Create a task-specific file such as:
- Very specific: line 43
Before creating this file—and before planning or delegation—inspect the existing .gitignore and .ignore.
- Distinctive: line 63
Do not follow a rigid template.
- Distinctive: line 75
Update this file after major decisions, accepted research, reviews, phase completions, validation results, and scope changes.
- Distinctive: line 82
create a phased implementation/delegation plan.
- Very specific: line 83
before dispatch, choose a small number of coherent implementation phases from the work's dependencies and natural delivery boundaries.
- Very specific: line 86
before execution, define coherent delivery phases and decide which of them get an oracle gate, subject to the Oracle Gate Budget below.
- Distinctive: line 90
before starting each phase, replace the todo list with actionable delivery todos for that phase only.
- Distinctive: line 107
before each implementation phase, decide the execution path: what can run in parallel, what must be sequential, which specialists to …
- Distinctive: line 113
Use the scheduler model throughout:
- Distinctive: line 116
wait for the harness's completion notification before consuming background results — do not poll.
- Distinctive: line 118
avoid blocking the orchestrator lane while background jobs run.
- Distinctive: line 121
do not advance to the next phase while relevant jobs are running or terminal results are unreconciled.
- Very specific: line 123
use SendMessage to add context to or resume a lane, and TaskStop to stop a lane that has become obsolete.
- Very specific: line 129
after each planned phase, run relevant validation, update the deepwork file, then request its planned oracle gate, if that phase has one, …
- Very specific: line 132
before its planned oracle gate, record relevant accepted research and file references so oracle reviews established context rather than …
- Very specific: line 138
when the phase changes module boundaries, dependency direction, or file placement, run an explorer structure scan in parallel with the …
- Distinctive: line 143
create a focused commit when the phase is an independently valid delivery boundary before starting the next phase.
- Very specific: line 148
Every planned oracle gate has one initial review and may have at most two re-reviews.
- Very specific: line 169
When a deepwork phase includes designer, treat the delivered UI/UX as accepted design intent for later phases.
- Very specific: line 181
use fixer only for bounded mechanical follow-up that preserves the design exactly, such as wiring, tests, type fixes, or non-visual …
- Distinctive: line 183
if design intent must change, record why in the deepwork file before changing it.
“Common” is measured: kept by at least 6 in 10 of the 3 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
If
superpowers:writing-plansis available in this session, stop and use it instead. This skill exists so the plugin works without superpowers installed.
Deepwork
Deepwork is an orchestrator workflow for heavy coding sessions. "Orchestrator"
here means the main thread running the orchestrate skill, not a separate
process or agent. Use it only
when the work is clearly large or high-risk: multiple dependent phases,
cross-cutting architectural change, unsafe-to-partially-ship migration, or
sustained coordination across several specialist lanes.
Do not infer Deepwork merely because a task touches multiple files. Do not use it for trivial edits, quick docs changes, simple bug fixes, or routine bounded features.
Core Contract
When deepwork is active, the orchestrator must manage the work as a scheduler,
not as the default implementation worker. Specialists are launched with the
Agent tool and a named subagent_type, exactly as in orchestrate — always
the plugin-scoped form oh-my-claudecode-slim:<name>.
Setup and Deepwork State
- create and maintain a local markdown progress file under
.slim/deepwork/; - save code/doc deliverables to project paths (e.g.
src/,docs/); reserve.slim/deepwork/strictly for progress files;
Deepwork File
Create a task-specific file such as:
.slim/deepwork/<short-task-slug>.mdBefore creating this file—and before planning or delegation—inspect the existing
.gitignore and .ignore. Add only missing entries and do not add duplicates.
A !.slim/ line inside another skill's marker block does not count; add your
own, because that skill's cleanup removes its block:
# .gitignore
.slim/deepwork/# .ignore
!.slim/
!.slim/deepwork/
!.slim/deepwork/**These rules keep deepwork state git-local while allowing Claude Code's search tools to read it.
Do not follow a rigid template. Choose whatever markdown structure best fits the work. The file only needs to remain useful as persistent session state and should capture, as applicable:
- current goal and understanding;
- researched, factual context from
librarianto avoidoracledoing its own research; - plan drafts, oracle review budget/gates, and review notes;
- implementation phases and status;
- validation results;
- unresolved questions, blockers, and follow-ups.
Update this file after major decisions, accepted research, reviews, phase completions, validation results, and scope changes. Record accepted findings and reference local files by path rather than copying their contents.
Planning
- draft a plan before implementation;
- create a phased implementation/delegation plan;
- before dispatch, choose a small number of coherent implementation phases from
the work's dependencies and natural delivery boundaries; do not split work
merely to reduce an
oraclereview's scope; - before execution, define coherent delivery phases and decide which of them
get an
oraclegate, subject to the Oracle Gate Budget below; record the phase order, specialist ownership, gate order, and one-line gate rationale in the deepwork file; share a compact version with the user; - before starting each phase, replace the todo list with actionable delivery todos for that phase only;
Oracle Gate Budget
Budget at most 3 initial oracle gates for the whole deepwork session,
regardless of phase count — a five-phase deepwork does not mean five-plus
Opus-high reviews. oracle is an escalation, not a default verification step
(see orchestrate): spend a gate on a phase only when it meets orchestrate's
escalation criteria — major architectural decisions, high-risk multi-system
changes, costly trade-offs, or genuine uncertainty where a wrong call is
expensive. A phase that is routine, low-risk, or mechanical does not need a
gate; validate it and move on. Each granted gate still allows up to two
re-reviews, per Oracle Re-Reviews below.
Phase Execution
- before each implementation phase, decide the execution path: what can run in parallel, what must be sequential, which specialists to delegate to, and whether to split the same agent into multiple bounded lanes;
Scheduler Discipline
Use the scheduler model throughout:
- record agent names/IDs and ownership boundaries;
- wait for the harness's completion notification before consuming background results — do not poll;
- avoid blocking the orchestrator lane while background jobs run; if no independent work remains, end the turn with a one-line status and let the completion notification resume the workflow;
- do not advance to the next phase while relevant jobs are running or terminal results are unreconciled;
- use
SendMessageto add context to or resume a lane, andTaskStopto stop a lane that has become obsolete; if the user wants to see what is still running, tell them they can run/tasks.
Phase Gate and Commit
- after each planned phase, run relevant validation, update the deepwork file,
then request its planned
oraclegate, if that phase has one, before continuing; - before its planned
oraclegate, record relevant accepted research and file references sooraclereviews established context rather than repeating discovery; - record the phase goal, changed paths, validation evidence, and the specific
decision or risk to review in the deepwork file; provide this context to
oraclewith the accepted research and file references; - when the phase changes module boundaries, dependency direction, or file
placement, run an
explorerstructure scan in parallel with theoraclegate; - reconcile review findings, perform one bounded remediation pass for material issues, and validate that pass with focused evidence;
- create a focused commit when the phase is an independently valid delivery boundary before starting the next phase;
Oracle Re-Reviews
Every planned oracle gate has one initial review and may have at most two
re-reviews. Request a re-review only when the remediation materially changes
the reviewed decision or risk, or when the original concern cannot be verified
with focused evidence. Do not spend a re-review on a mechanical or
already-verified change.
State the attempt in every oracle prompt, for example:
Gate 2 — review attempt 2 of 3 (1 re-review remaining)For re-reviews, tell oracle to prioritize unresolved material findings, risks
introduced by remediation, and whether prior findings are resolved. It must not
reopen accepted, unchanged, or resolved concerns. When the two re-reviews are
exhausted, record any remaining material risk or blocker in the deepwork file
and use AskUserQuestion to ask the user whether to accept the risk, change
scope, or authorize an exceptional additional review.
Designer Handoff Guardrail
When a deepwork phase includes designer, treat the delivered UI/UX as
accepted design intent for later phases. Record any important design decisions in
the deepwork file before continuing.
After designer work:
- preserve layout, rhythm, hierarchy, motion, spacing, color, affordances, responsiveness, and component feel;
- review and improve user-facing copy with grounded, normal wording, but do not change visual structure or interaction intent;
- route follow-up visual, responsive, motion, hierarchy, polish, or
component-feel changes back to
designer; - use
fixeronly for bounded mechanical follow-up that preserves the design exactly, such as wiring, tests, type fixes, or non-visual behavior changes; - if design intent must change, record why in the deepwork file before changing it.
Completion
- finish with final validation and a concise summary.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.

