Comprehensive standards for writing Software Test Specification (STS) documents following IEEE 829 and ISO/IEC/IEEE 29119. Use this skill whenever you need to create, review, or improve test specifications — including Test Design Specifications (TDS), Test Case Specifications (TCS), and Test Procedure Specifications (TPS). Trigger on: "STS", "TDS", "TCS", "TPS", "write test cases", "test specification", "requirements traceability matrix", "RTM", "risk-based testing", "exit criteria", "test procedure", "test environment", "CI/CD test integration", "IEEE 829", "document how to test this feature", or non-functional testing (accessibility, security, performance).

We split this skill into the rules it gives an agent

13 rules. About 0 are common, 11 are distinctive, and 2 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈11

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 2

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Before writing test cases, determine the correct test level and type:

    line 22
  2. Distinctive:

    Every STS must define:

    line 56
  3. Distinctive:

    Document the data needed before writing procedures — vague data requirements are a common source of false passes.

    line 134
  4. Distinctive:

    Use version-controlled IaC (Docker Compose, Terraform, K8s manifests) for reproducible provisioning.

    line 147
  5. Distinctive:

    All planned test cases executed.

    line 181
  6. Distinctive:

    No open Critical or High severity defects (or all explicitly deferred with sign-off).

    line 182
  7. Distinctive:

    Test case pass/fail rate by feature and priority.

    line 189
  8. Distinctive:

    Treat the STS as a configuration-managed artifact.

    line 221
  9. Very specific:

    When a requirement changes, raise a change request, update affected TDS/TCS/TPS, and re-execute regression tests for changed areas.

    line 226
  10. Distinctive:

    Document CI/CD trigger (e.g., "All automated regression tests run on every PR merge to main").

    line 245
  11. Distinctive:

    Ensure CI environment matches STS environment spec (same OS, DB version, container image).

    line 246
  12. Distinctive:

    Add test cases for OWASP Top 10 risks relevant to the feature (SQL injection, XSS, broken auth, etc.).

    line 270
  13. Very specific:

    Before delivering a test specification (TDS/TCS/TPS or a full STS), verify:

    line 306

≈ “Common” is an estimate: at least 1 in 5 of the 308,232 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Software Test Specification (STS) Standards

A Software Test Specification (STS) defines what will be tested and how. It ties requirements to detailed test designs, cases, and procedures, enabling systematic, repeatable testing with clear accountability. These standards follow IEEE Std 829 and ISO/IEC/IEEE 29119.


0. Test Type Decision Matrix

Before writing test cases, determine the correct test level and type:

Test LevelScopeWritten ByWhen to Use
UnitSingle function/classDeveloperValidate business logic, pure functions, algorithms
IntegrationModule interactionsDeveloper / QATest DB calls, API clients, message consumers
SystemFull applicationQAEnd-to-end flows through the deployed system
Acceptance (UAT)Business scenariosBusiness analyst / end-userValidate against BRD objectives and success criteria
Test TypePurposeCoverage Goal
FunctionalDoes the system do what it should?Happy path + edge cases
RegressionDid a change break existing behavior?Previously passing cases
Performance / LoadDoes it handle expected load?P95/P99 latency thresholds
SecurityAre vulnerabilities present?OWASP Top 10, auth, injection
AccessibilityIs it usable by everyone?WCAG 2.2 AA success criteria
ExploratoryDiscover unknown unknownsRisk-based, unscripted sessions
SmokeIs the build basically working?Critical path only, fast

Include the relevant test types in the STS scope section. Do not write separate STSes for each type unless the scale or audience requires it.


1. Purpose and Scope

An STS answers: what features are tested, how they are tested, and what constitutes pass/fail.

"Test plan" requests. This skill produces a test specification (TDS/TCS/TPS), not a standalone IEEE 829 Test Plan document. The planning content a test plan needs is covered here across sections — scope/objectives (§1), test environment (§4.2), risk-based prioritisation (§5), exit criteria (§6), and schedule via CI/CD integration (§9) — so assemble a lightweight test plan from those. A separate master Test Plan document (org-level resourcing, staffing, multi-project schedule) is out of scope for this skill.

Every STS must define:

  • In-scope features/modules — functions and behaviors explicitly covered.
  • Out-of-scope features — items explicitly excluded (prevents scope creep).
  • Test objectives — linked to requirement IDs or user story IDs.
  • Assumptions — e.g., "Supported browsers: the current and previous major release of Chrome and Firefox."

Checklist:

  • Scope explicitly lists in-scope and out-of-scope items.
  • Objectives align to requirement IDs.
  • Assumptions (data, environment, user roles) are listed.

2. STS Document Structure

Per IEEE 829 / ISO 29119, a complete Test Specification comprises three documents:

2.1 Test Design Specification (TDS)

Answers what to test and defines the high-level approach for each feature set.

Key fields: Test Design ID, Feature/Feature Set, Test Approach, Pass/Fail Criteria, Linked Test Case IDs, Assumptions/Risks.

2.2 Test Case Specification (TCS)

Answers with what data — inputs, outputs, and constraints for each test.

Key fields: Test Case ID, Objective (Req. ID), Preconditions, Steps, Expected Result, Priority (High/Med/Low), Type (Functional/NFR/Regression).

Example:

Test Case IDObjective (Req.)PreconditionsStepsExpected Result
TC-LOGIN-001Valid login (REQ-123)User account exists1. Open login. 2. Enter valid credentials. 3. Submit.Dashboard loads.
TC-LOGIN-002Invalid login error (REQ-124)—1. Open login. 2. Enter wrong password. 3. Submit.Error "Invalid credentials" shown.

2.3 Test Procedure Specification (TPS)

Answers how to execute — step-by-step instructions for environment setup and test execution.

Key fields: Procedure ID, Related Test Case IDs, Preconditions/Setup, Steps, Data Requirements, Environment Requirements, Post-conditions.

Example:

Procedure IDRelated TCsSetupProcedure StepsPost-conditions
TP-LOGIN-MANUALTC-LOGIN-001, 002DB seeded with test user data.1. Launch browser on test server. 2. Navigate to /login. 3. Execute steps per each TC.Log actual results.

See references/examples.md for extended example tables.

Checklist:

  • All testable features appear in the TDS.
  • Each test case has a unique ID, purpose, steps, and expected result.
  • Each procedure references TCS IDs and required environment/data.
  • Pass/fail criteria are defined per feature.

3. Traceability to Requirements

Maintain a Requirements Traceability Matrix (RTM) to prove every requirement is tested and every test maps to a requirement.

RTM minimum fields:

Req. IDReq. DescriptionLinked TC IDsExecution StatusDefects Found
REQ-123Valid user loginTC-LOGIN-001Pass—
REQ-124Invalid login error messageTC-LOGIN-002FailBUG-045

Checklist:

  • Every requirement has ≥1 linked test case (forward traceability).
  • Every test case maps back to a valid requirement (backward traceability).
  • Test cases include the Req. ID field.
  • Orphan requirements or orphan test cases are reviewed and resolved.
  • RTM is updated after each test execution cycle and defect triage.

4. Test Data and Environment Management

4.1 Test Data

Document the data needed before writing procedures — vague data requirements are a common source of false passes.

  • List data types needed (valid inputs, invalid inputs, edge cases, large datasets).
  • Specify how data is created or sourced (seeded scripts, anonymized prod exports).
  • Note anonymization requirements for PII/PHI (PCI/HIPAA compliance).
  • Define data readiness criteria (e.g., "inventory DB seeded with ≥100 SKUs").

4.2 Test Environment

Specify the target environment precisely so any tester can reproduce it.

  • Hardware, OS versions, network topology.
  • Application version under test (build number/tag).
  • External dependencies (APIs, databases, message queues) with versions.
  • Use version-controlled IaC (Docker Compose, Terraform, K8s manifests) for reproducible provisioning.

Checklist:

  • Data needs (range, format, dependencies) documented per test case.
  • Sensitive data masked or replaced (never use production PII in test environments).
  • Environment specified by name/ID and version (e.g., "QA Staging: v2.3").
  • Environment provisioning is scripted and version-controlled.

5. Test Prioritization and Risk-Based Testing

Prioritize test effort by risk = likelihood × impact, not by feature list order.

Risk identification steps:

  1. Brainstorm technical and business risks (e.g., "payment processing failure," "data breach").
  2. Rate each risk by likelihood (High/Med/Low) and impact (High/Med/Low).
  3. Tag test cases with a corresponding priority label.
  4. Schedule high-priority test cases to run first and with automation.

Checklist:

  • Risks are documented (risk register or test plan section).
  • Each feature/requirement is rated by risk/severity.
  • Test cases include a Priority field (High/Med/Low).
  • Test execution order starts with High-priority cases.
  • Risk priorities are revisited when requirements or code change.

6. Metrics and Exit Criteria

Testing ends when objective criteria are met — not when time runs out.

Common exit criteria:

  • All planned test cases executed.
  • No open Critical or High severity defects (or all explicitly deferred with sign-off).
  • ≥X% functional test pass rate (agree the threshold with stakeholders).
  • Code coverage ≥Y% (if applicable).
  • Performance benchmarks met (response times, load profiles).
  • Security scan: no Critical OWASP findings.

Metrics to track continuously:

  • Test case pass/fail rate by feature and priority.
  • Defect trend (open, closed, re-opened per sprint).
  • Requirements coverage % (how many Req. IDs have ≥1 executed TC).

Checklist:

  • Exit criteria are explicit and agreed with stakeholders before testing starts.
  • Coverage targets (functional and/or code) are defined.
  • Performance and security benchmarks (if in scope) are specified.
  • Metrics are collected automatically via CI or test management tool.
  • Criteria are updated if scope changes.

7. Review and Approval Workflow

  1. Draft — QA author creates TDS/TCS/TPS.
  2. Peer Review — QA Lead, Dev Lead, Product Owner review for completeness and correctness.
  3. Revise — Incorporate feedback; track all comments.
  4. Approval/Baseline — Formal sign-off before test execution begins.
  5. Re-review — Required after any significant requirement change.

Checklist:

  • Reviewers (QA, dev, product) identified for each document.
  • Review checklist used (traceability, completeness, clarity, correct expected results).
  • All review comments tracked and resolved.
  • Document has a version history and approval record.
  • STS is baselined before test execution begins.

8. Versioning and Change Control

Treat the STS as a configuration-managed artifact.

  • Begin each document with a Revision History table: Version | Date | Author | Summary of Changes | Approver.
  • Store master copies in a CM system (Git, Confluence, SharePoint) with backups.
  • Archive outdated versions as read-only.
  • When a requirement changes, raise a change request, update affected TDS/TCS/TPS, and re-execute regression tests for changed areas.

Checklist:

  • Version ID and date on every document revision.
  • Change-log table maintained.
  • Outdated versions archived (not deleted).
  • Requirement change triggers test case review and update.

9. Automation and CI/CD Integration

For pipeline design itself (workflows, jobs, secrets, environment promotion), apply the top-level github-circleci-standards skill (CircleCI) or zeno-stack/zeno-deployment-patterns (GitHub Actions, platform-neutral strategy); this section covers how test documentation maps onto whatever pipeline exists.

Tag each test case as Automated or Manual in the TCS. For automated tests:

  • Specify framework/tool (e.g., Pytest, Selenium, Playwright, JMeter) and script location.
  • Document CI/CD trigger (e.g., "All automated regression tests run on every PR merge to main").
  • Ensure CI environment matches STS environment spec (same OS, DB version, container image).
  • Map CI test results (JUnit XML / NUnit XML) back to STS test case IDs in your test management tool.

Checklist:

  • Automated tests linked to corresponding TCS entries.
  • CI/CD pipeline steps for running tests are documented.
  • CI environment matches the STS environment specification.
  • Test result reports flow into the RTM / test management tool.
  • Script maintenance plan is in place (update STS when scripts change).

10. Non-Functional Testing

Non-functional tests must appear in the STS — they are not an afterthought. The targets these tests verify come from the NFR document — source them from ../../documentation/non-functional-requirements-standards/SKILL.md artifacts rather than inventing thresholds in the test spec.

10.1 Accessibility

  • Include test cases for WCAG 2.2 AA compliance (keyboard navigation, screen-reader compatibility, color contrast ratios, alt-text).
  • Reference: Section 508, EN 301 549, WCAG 2.2 (the current W3C Recommendation).

10.2 Security

  • Add test cases for OWASP Top 10 risks relevant to the feature (SQL injection, XSS, broken auth, etc.).
  • Include security acceptance criteria in exit criteria (e.g., "No Critical OWASP findings").

10.3 Performance

  • Define load profiles (concurrent users, transactions per second) and acceptable response times.
  • Specify tools (e.g., JMeter, k6, Locust) and test data volumes.

Checklist:

  • Accessibility test cases included for each UI feature (keyboard, screen-reader, contrast).
  • Security test cases defined for high-risk areas (auth, input fields, APIs).
  • Performance test plan (load profiles, tools, thresholds) documented.
  • Non-functional requirements with quantitative targets appear in the STS.

Anti-pattern quick reference

Anti-patternInstead
Outdated test cases after requirement changesVersion control + change request process (§8)
Missing traceabilityEnforce Req. ID field in TCS template
Vague test steps ("verify the page works")Require explicit expected result for every step
Skipping non-functional testsInclude NFR section in TDS checklist
Over-engineered proceduresBalance detail vs. readability — aim for any qualified tester to follow

Reference Files

  • references/examples.md — Extended test case and procedure table examples.
  • references/tools-comparison.md — Comparison of STS tools: TestRail, Xray, Azure DevOps, Confluence, PractiTest.

Pre-flight checklist — run before delivering any STS

Before delivering a test specification (TDS/TCS/TPS or a full STS), verify:

  • Right test type: the artifact matches the §0 decision matrix for the level being specified.
  • Structure: TDS, TCS, and TPS are distinguished (§2); each test case has ID, preconditions, steps, and an explicit expected result per step.
  • Traceability: every test case carries a requirement ID; the RTM links requirements → cases both ways (§3).
  • Data & environment: test data source and environment are specified, with no secrets committed (§4).
  • Risk-based prioritisation: cases are prioritised by risk, not written uniformly (§5).
  • Exit criteria: measurable pass/coverage/defect thresholds are stated (§6), not left implicit.
  • Non-functional coverage: accessibility, security, and performance are addressed or explicitly scoped out (§10).
  • CI/CD hook: automation and pipeline integration are specified where applicable (§9).
  • Version control: change-control and versioning approach is stated so cases don't drift from requirements (§8).

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.