build-estimate

Skill6 starsChanged 29 days agoMITView on GitHub

Project a build's remaining effort onto the calendar from MEASURED rates, not guesses. Reads a calibration ledger of past builds (tasks landed per hour under a named process profile), scales by task kind and status, walks the calendar past weekends and holidays, and returns low/mid/high finish dates with a fit verdict against a target date. Two modes — `project` (before or during a build) and `calibrate` (after a build, append the actuals so the next estimate is better). Use when a plan needs its "Estimated effort" section, when someone asks "will this fit by <date>", when the calendar needs reassessing mid-build, or when a build finishes and its actuals should be recorded. Triggers — "estimate the build", "how long will this take", "will we make the date", "reassess the calendar", "record the actuals", "calibrate the estimate".

The file

We split this skill into the rules it gives an agent

6 rules. About 0 are common, 0 are distinctive, and 6 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈0

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 6

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Do not add a "review" or "contingency" line on top: a task unit already contains its review rounds and repairs, because that is how the …

    line 49
  2. Very specific:

    After build-evaluate returns PASS (or the build is abandoned with tasks landed — those count too):

    line 55
  3. Very specific:

    Write a record JSON (estimate.py --help shows the shape) with a note saying what made the run typical or atypical — single operator, task …

    line 60
  4. Very specific:

    If a build ran under a profile that has no measured record, calibrating it is what turns that profile's ASSUMED multiplier into data.

    line 69
  5. Very specific:

    Typing the estimate: If the section in plan.md has no rate per task unit line, it was not produced by this tool.

    line 81
  6. Very specific:

    Estimating optional scope as required: Put it under optional so the human sees the split.

    line 86

≈ “Common” is an estimate: at least 1 in 5 of the 372,429 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

build-estimate

The rule: an effort estimate is a calculation from the ledger, not a number typed into a table. plan.md's Estimated effort section is produced by this tool and cites the rate it used. A hand-written "3–4 days" has no basis anyone can check, and on the settlement-verifier build it was wrong by a factor of two within four days (written Aug 23 for 61 tasks; 21 of them then landed in 15.5 hours).

Tool: estimate.py beside this file. Ledger: calibration.json beside it. Stdlib Python only.

When

MomentModeWho calls it
build-plan Phase 5, writing Estimated effortprojectbuild-plan — the section is this tool's output pasted in
Mid-build, "are we still on track" / a scope or date questionprojectyou, on request; re-run whenever tasks land or the target moves
build-evaluate PASS, before closing the slugcalibratebuild-evaluate — the actuals go into the ledger or the next build estimates blind

project — from a spec to a calendar

  1. Write the spec at .claude/PRPs/<slug>/estimate/estimate-<YYYY-MM-DD>.json (the estimate/ directory is opaque to the PRP naming hook; the JSON is data, not an artifact). Fields, all named in estimate.py --help:
    • process — which profile the build runs under. intensive = build-execute with mandatory per-iteration adversarial review and a mutation harness (the only MEASURED profile today). standard and light are ASSUMED multipliers and the output says so.
    • tasks — the open tasks, each with a kind from the ledger's task_kinds and a status (not-started / staged / in-review). Read the task text and the staging area before assigning these — a task whose code is staged and green is 40% of a task, not 100%.
    • fixed — gate steps with a known clock (build-evaluate, quality-review) in minutes.
    • optional — a second scenario (e.g. the tasks a real-matter demo adds). Reported separately so the human sees what fits without them and what it costs to add them.
    • start, start_hours_left, hours_per_day, holidays, target. Look the holidays up and compute them — US Labor Day is the first Monday of September, and the first estimate on the settlement-verifier build put it a week early from memory.
  2. Run python3 .claude/skills/build-estimate/estimate.py project <spec>.
  3. Paste the output into plan.md § Estimated effort, replacing whatever was there, with the date and the spec path. Keep the assumptions carried block — it is what a later reader uses to see why the number was what it was.
  4. State the verdict in one line to the human: fits / marginal / does not fit, at which estimate, and which optional items would push it over. The decision to cut or move the date is theirs; the tool's job is to make the arithmetic un-arguable.

Do not add a "review" or "contingency" line on top: a task unit already contains its review rounds and repairs, because that is how the ledger measured it. If the build is not running the measured process, change process, not the task list.

calibrate — closing the loop

After build-evaluate returns PASS (or the build is abandoned with tasks landed — those count too):

  1. Count from evidence, not memory: iteration-report mtimes or timestamps, tasks flipped in state.json / the plan checklist, hours actually at the keyboard with overnight and meeting gaps excluded.
  2. Write a record JSON (estimate.py --help shows the shape) with a note saying what made the run typical or atypical — single operator, task mix, anything that would make the rate not transfer.
  3. python3 .claude/skills/build-estimate/estimate.py calibrate <record.json>; it appends and prints the profile's new resolved rate.
  4. Promote — ~/gits/clybor-claude-tooling/scripts/promote.sh .claude/skills/build-estimate — and commit there. The ledger's value is cumulative across projects; a record left in one project's copy calibrates nothing else, and the drift gate will block the next commit anyway.

If a build ran under a profile that has no measured record, calibrating it is what turns that profile's ASSUMED multiplier into data. Add the profile to calibration.json first if it is a genuinely different process; do not stretch an existing profile to cover it.

Adding a task kind

A kind is a shape of work with a measured cost, not a topic. Add one only when a finished build shows a class of task that consistently ran at a different multiple of the median, and write the observation into its basis. Kinds with no basis are guesses wearing a label.

Anti-patterns

  • Typing the estimate. If the section in plan.md has no rate per task unit line, it was not produced by this tool.
  • Re-using a stale projection. The Aug 23 figure was still governing on Aug 28 after half the tasks had landed. Re-run on every "will we make it" question; it costs seconds.
  • Counting calendar days as working days. Weekends and holidays are in the spec for a reason.
  • Estimating optional scope as required. Put it under optional so the human sees the split.
  • Calibrating from memory. "It felt like two days" is not a record.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.