plan-optimizer
Skill7 starsChanged 5 months agoMITView on GitHub
Iteratively optimize a plan by scoring it against a rubric, critiquing it, and rewriting it until the score plateaus. Use this skill whenever the user wants to refine, improve, harden, stress-test, or "make the best possible" version of a plan of any kind — project plans, execution/rollout plans, code implementation plans, research plans, strategy memos, study plans, training plans, go-to-market plans, or proposals. Trigger it when the user says things like "improve this plan", "iterate on this until it can't get better", "score and refine my approach", "find the holes in this plan", "make this plan bulletproof", or describes wanting an automatic improve-and-score loop. Also use it proactively when the user shares a draft plan and asks "is this good?" or "what would make this better?" — the loop produces a measurably stronger plan than a single critique pass.
In this repository6 other files it gives its agents.
- block-disposable-emailsSkill
- boil-the-oceanSkill
- cloudflare-leaky-pathsSkill
- input-anticipationSkill
- remark-mermaid-tldrawSkill
- write-like-a-humanSkill
The file
We split this skill into the rules it gives an agent
11 rules. About 0 are common, 11 are distinctive, and 0 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈11
Distinctive · estimate
This author's own choices. Worth a look.
0
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 33
Use it whenever there's a plan that should be as good as it can reasonably get and the cost of a weak plan is real.
- Distinctive: line 56
Run this in your head / in the conversation, not as code — the "functions" are reasoning steps you perform.
- Distinctive: line 62
Before writing any plan, write the rubric.
- Distinctive: line 91
Write a genuine first attempt at the plan that addresses the task.
- Distinctive: line 105
Require a margin to accept: Only replace the current best if the new score beats it by a meaningful margin (e.g.
- Distinctive: line 108
Re-anchor occasionally: Every few rounds, re-read the *original* rubric fresh rather than drifting toward whatever the latest plan happens …
- Distinctive: line 131
Best-of-N: When hill-climbing stalls (see plateau, Step 5) but you suspect the plan needs a structural rethink, generate N genuinely …
- Distinctive: line 142
If the user has access to a stronger model than the one running the loop, note that running the *improve* and *score* steps on a stronger …
- Distinctive: line 167
Keep the process visible but concise.
- Distinctive: line 173
Reward hacking the rubric: If scores climb but the plan doesn't feel better, the rewrites are gaming the metric.
- Distinctive: line 176
A weak rubric capping everything: If you plateau low, suspect the rubric before the plan.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Plan Optimizer
This skill turns plan-writing into a search problem. Instead of producing one plan and hoping it's good, you generate a plan, score it numerically against an explicit rubric, critique it, rewrite it to fix the weaknesses, and repeat — keeping the best version seen so far — until the score stops improving. That plateau is your signal that further iteration is just noise, and you stop.
The reason this works is that scoring and rewriting are separate acts. Generating a plan and judging a plan use different cognitive muscles; forcing an explicit critique between revisions converts blind rewriting into directed search that climbs toward a target rather than drifting sideways.
When to use this
Use it whenever there's a plan that should be as good as it can reasonably get and the cost of a weak plan is real. If the user just wants a quick first draft, don't impose the whole loop — offer it. If they want the best plan, run the loop.
The loop at a glance
plan = generate the initial plan from the task
best = plan
best_score = score(plan) # 0-100, against the rubric
history = [best_score]
repeat:
candidate = improve(best) # critique -> targeted rewrite
s = score(candidate)
if s > best_score + MARGIN: # require a real margin, not noise
best, best_score = candidate, s
history.append(best_score)
until plateau(history) # no real gain over the last K rounds
return best, historyRun this in your head / in the conversation, not as code — the "functions" are reasoning steps you perform. Keep all intermediate plans and scores so you can show the trajectory at the end.
Step 1 — Build the rubric first
Before writing any plan, write the rubric. The rubric is the ceiling: the loop can only climb as high as the rubric lets it perceive quality, so a vague rubric gives you a low, noisy ceiling. Spend real effort here.
A good rubric is domain-adapted, weighted, and as objective as possible. Derive the criteria from what would actually make this plan succeed or fail, not from a generic checklist. Most strong plans, whatever the domain, are graded on some mix of:
- Goal clarity — is the objective and definition of "done" unambiguous and measurable?
- Completeness — are the necessary steps/workstreams present, with nothing load-bearing missing?
- Sequencing & dependencies — is the order right; are prerequisites identified?
- Feasibility & resourcing — is it realistic given time, people, budget, constraints?
- Risks & mitigations — are the real failure modes named, with contingencies?
- Success metrics — are there concrete signals that tell you it's working?
- Specificity — is it actionable (owners, dates, concrete first step) rather than vague aspiration?
Assign each criterion a weight that reflects its importance for this task, and state, briefly, what a low/medium/high score looks like for each. Prefer criteria you can check against something objective (does the plan name a first action? does every phase have an exit condition?) over purely subjective taste — objective criteria resist gaming.
Show the rubric to the user before you start iterating if there's any ambiguity about what "good" means for them; their priorities (speed vs. thoroughness, risk-aversion vs. ambition) should shape the weights.
Step 2 — Generate the initial plan
Write a genuine first attempt at the plan that addresses the task. Don't sandbag it to make the loop look impressive — a strong starting point reaches a higher final ceiling. Then score it against the rubric (Step 3).
Step 3 — Score
Score the current plan from 0 to 100. Do this as a deliberate, separate pass: go criterion by criterion, assign each a sub-score, note why, then combine by the weights. Always write a one-line rationale per criterion — the rationale is what feeds the next critique, and it's what keeps scoring honest rather than a gut number.
Two guards against noisy scoring:
- Require a margin to accept. Only replace the current best if the new score beats it by a meaningful margin (e.g. +2 on a 100 scale), not by a fraction. Scoring has noise; without a margin you'll "improve" into a worse plan.
- Re-anchor occasionally. Every few rounds, re-read the original rubric fresh rather than drifting toward whatever the latest plan happens to do well. This catches reward-hacking, where revisions start optimizing for a score the rubric didn't really intend.
Step 4 — Improve (critique, then rewrite)
This is the engine. Do not just say "make it better" and rewrite — that produces lateral drift. Instead, in two explicit moves:
- Critique. Against the rubric, list the specific weaknesses of the current best plan, ordered by how much they cost in score. Be concrete: "no rollback step for the migration", not "could be more robust". Name the lowest-scoring criteria and why they're low.
- Rewrite. Produce a new full version of the plan that directly fixes the critique's top items, while preserving what already scored well. Don't regress strengths to chase a weakness.
Two search strategies — pick one, switch when stuck
- Hill-climb (default). One critique→rewrite candidate per round. Fast and cheap. Use this unless told otherwise. Its weakness is local optima — small fixes that can't reach a fundamentally better structure.
- Best-of-N. When hill-climbing stalls (see plateau, Step 5) but you suspect the plan needs a structural rethink, generate N genuinely different candidates in one round — not minor variants, but different framings or architectures of the plan — score all N, and keep the best. This widens the search and is how you break through a ceiling that incremental edits can't. N=3 is a sensible default; more candidates cost more.
A good automatic policy: hill-climb until you hit a plateau, then do one best-of-N round to try to escape the local optimum. If best-of-N also fails to beat the ceiling by the margin, you've genuinely converged — stop.
If the user has access to a stronger model than the one running the loop, note that running the improve and score steps on a stronger model is the single biggest lever: a stronger model proposes structurally better rewrites and also perceives flaws a weaker scorer misses, which raises the ceiling itself.
Step 5 — Stop on plateau
Track the best score over a sliding window of the last K rounds (K=3 is reasonable). Stop when the best score has not improved by more than the margin over the last K rounds — that's the "iterations have become noise" point. Also stop if you hit a sensible max rounds (e.g. 6–8) regardless, so the loop always terminates. Before declaring convergence on a hill-climb plateau, try the one best-of-N escape round described above.
Step 6 — Output
Return:
- The best plan, clean and ready to use — this is the deliverable, lead with it.
- Its final score with the per-criterion breakdown.
- The score trajectory (e.g.
62 → 74 → 81 → 83 → 83) so the user sees the climb and the plateau. - A short note on what the loop changed — the 2–3 biggest improvements made from first draft to final, so the user understands why it's better.
Keep the process visible but concise. The user cares most about the final plan; the trajectory and rationale are evidence that it's been genuinely hardened, not just reformatted.
Pitfalls to watch
- Reward hacking the rubric. If scores climb but the plan doesn't feel better, the rewrites are gaming the metric. Re-anchor on the original intent, and prefer objective criteria.
- A weak rubric capping everything. If you plateau low, suspect the rubric before the plan. A ceiling that feels too low often means the rubric can't see the dimension that matters — add or reweight a criterion.
- Reformatting masquerading as improvement. Bigger/prettier ≠ better. Improvements should change substance (a missing risk, a fixed dependency), not just structure. The margin guard helps; so does an honest critique.
- Never stopping. Respect the plateau and the max-rounds cap. Past the plateau you're spending effort to move noise around.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.