planning-horizons

Skill9 starsChanged 4 months agoMITView on GitHub

Decides how far ahead to plan, what to discount future payoffs by, and which backlog items can be dropped without analysis - using receding-horizon planning, an explicit discount factor, and branch-and-bound pruning against the incumbent. Use when building a roadmap, prioritising a backlog, arguing about short-term versus long-term, setting quarterly or annual plans, or when planning has become an end in itself.

The file

We split this skill into the rules it gives an agent

6 rules. About 0 are common, 6 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈6

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Leaving the discount rate implicit: Every argument about short-term versus long-term is an argument about a discount factor that nobody has …

    line 19
  2. Distinctive:

    Do not argue about gamma. Argue about the half-life: how many periods until a payoff is worth half as much to us?

    line 39
  3. Distinctive:

    Before adopting a new plan, evaluate the current one properly - what it is actually worth if continued, not what it felt like last week.

    line 102
  4. Distinctive:

    Do not discount twice: If your outcome estimates are already probability-weighted for "we might not get there", applying a survival-based …

    line 157
  5. Distinctive:

    allocating-effort: when the options are parallel bets rather than a sequence

    line 171
  6. Distinctive:

    valuing-information: when the plan depends on something you could go and measure

    line 173

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Planning horizons

Two chronic errors in roadmapping, and both are cheap to fix:

  1. Planning deeper than the decision requires. Past a certain depth, extra planning changes nothing about what you do on Monday. That work is spend, not rigour.
  2. Leaving the discount rate implicit. Every argument about short-term versus long-term is an argument about a discount factor that nobody has written down. Write it down and the argument usually resolves in a minute.

The organising principle is receding horizon planning: plan to depth d, execute the first step, then replan. You are not committing to the plan. You are using the plan to choose the next action.

Workflow

- [ ] 1. Set the discount factor from a half-life you can defend
- [ ] 2. Find the depth where extra planning stops changing the first move
- [ ] 3. Prune the backlog against the incumbent
- [ ] 4. Evaluate the current plan before replacing it
- [ ] 5. Plan to that depth, commit only the first step, set a replan trigger

1. Set the discount factor

Do not argue about gamma. Argue about the half-life: how many periods until a payoff is worth half as much to us? Then convert.

node scripts/calc.js discount --half-life 6

That reports the effective horizon (1/(1-gamma)) - the point past which contributions are noise - and the weight on payoffs at 1, 3, 6, 12 and 24 periods.

Defensible half-lives depend on your position, not your temperament:

PositionMonthly half-lifeEffective horizon
Under 6 months of runway3~4 months
Profitable, stable12~17 months
Funded with a clear multi-year thesis24~35 months

Runway is the honest driver. A short runway should produce a high discount rate, because a payoff after you run out of money has a utility of zero. That is not short-termism, it is arithmetic. Say it that way and the strategic argument becomes a financing argument, which is the one actually worth having.

2. Find the depth that matters

Estimate the value of the best plan you can find at several depths and look for where the curve flattens.

node scripts/calc.js horizon depths.json

Input shape: examples/horizon.json. The answer is the depth beyond which extra planning buys under a couple of percent. Planning deeper than that is not more rigorous; it produces the same first move at higher cost, plus a document that will be wrong.

The check that makes this concrete: would a longer horizon change what we do this week? If no, the horizon is long enough. In the book's collision-avoidance example there is no benefit to planning past 40 seconds, because no action taken earlier than that differs.

3. Prune the backlog

For each candidate, an optimistic ceiling: the contribution if everything goes right. For candidates already tried, a realized floor: what it actually delivered.

Anything whose optimistic ceiling sits below the best realized floor can be dropped without further analysis, because even its best case loses to something you already have.

node scripts/calc.js prune backlog.json

Input shape: examples/prune.json. This is branch and bound, and it is the cheapest triage available: it removes items from the backlog by arithmetic rather than by debate. Tighter ceilings prune more, so it pays to make the optimistic estimates honest rather than generous.

The surviving list is ordered by ceiling: evaluate in that order, and each evaluation raises the floor and prunes more.

4. Evaluate before replacing

Before adopting a new plan, evaluate the current one properly - what it is actually worth if continued, not what it felt like last week. Most "pivots" skip this step and compare an optimistic new plan against a demoralised memory of the old one.

Policy iteration alternates evaluation and improvement, and the evaluation half is not optional. If the current plan has never been scored, you do not know what the new one has to beat.

5. Commit the first step only

Publish the depth-d plan as context. Commit only to the first step, and state the condition that triggers a replan. That is receding horizon planning, and it is what makes deep planning safe: you are not betting on the tail of the plan being right.

A replan trigger is an observation, not a date: "replan when weekly signups fall below 40 for two consecutive weeks" fires when the world changes. "Replan in Q3" fires when the calendar does.

Output template

## Discount factor
Half-life: <n> periods, because <runway / position>.
Gamma: <value>. Effective horizon: <n> periods.
A payoff at <n> periods is worth <pct> of the same payoff today.

## Planning depth
<paste calc horizon, or state the depth and why deeper changes nothing this week>

## Backlog after pruning
<paste calc prune: incumbent, keep list ordered by ceiling, prune list with reasons>

## Current plan, evaluated
<what the existing plan is worth if continued - the number the new plan must beat>

## Commitment
First step: <the only thing being committed to, with owner and date>
Context: <the rest of the depth-d plan, labelled as context not commitment>
Replan trigger: <an observation with a threshold and a duration, not a date>

Gotchas

  • Deeper is not better. Past the flat point, extra depth adds cost and a false sense of control. The book's example shows a planner gaining nothing past a specific horizon, and the same is true of roadmaps.
  • A shallow plan plus frequent replanning often beats a deep plan. Replanning compensates for a short horizon. If you can replan weekly, you need less depth than if you can only replan quarterly.
  • Open-loop plans assume no new information. A Gantt chart committing twelve months is an open-loop plan. It is efficient to compute and wrong the moment anything is learned. Reserve it for genuinely uninterruptible sequences.
  • Discounting is not impatience. It reflects genuine uncertainty about whether you will be there to collect. Making it explicit converts a values argument into an arithmetic one.
  • Do not discount twice. If your outcome estimates are already probability-weighted for "we might not get there", applying a survival-based discount on top double-counts.
  • Ceilings must be optimistic, not expected. Branch and bound is only valid if the ceiling really is an upper bound. Putting an expected value in the ceiling column prunes things that would have won.

Reference

  • references/receding-horizon.md - the loop, replan triggers, and open-loop versus closed-loop
  • references/search-strategies.md - forward search, branch and bound, sparse sampling, tree search, and which maps to which planning practice

Related skills

  • framing-decisions for the individual choice at each step
  • allocating-effort when the options are parallel bets rather than a sequence
  • stress-testing-plans to check the plan against assumptions you are unsure of
  • valuing-information when the plan depends on something you could go and measure

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.