Plan strategic sourcing, supplier development, quality control and logistics. Use when managing physical inventory, manufacturing lead times, or logistics.

8 other projects use a version of this.

Adopted by

Most recently taken up by

The file

We split this skill into the rules it gives an agent

2 rules. 0 are common, 2 are distinctive, and 0 are very specific to this project.

  • 0

    Common

    Most of the 8 edited versions we read keep these.

  • 2

    Distinctive

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Every mission-critical component (ASIC, sensor, battery, PCB substrate) must have at least two qualified, production-tested suppliers …

    line 26
  2. Distinctive:

    Never evaluate suppliers solely on unit purchase price (FOB factory gate).

    line 30

“Common” is measured: kept by at least 6 in 10 of the 8 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

supply-chain

Core Philosophy

Physical hardware, electronic component, and product supply chains are governed by global lead times, manufacturing yields, tariffs, geopolitical bottlenecks, and inventory carrying costs. A software bug can be patched in minutes; a missing $0.05 microcontroller stops a $5,000,000 automated assembly line for 6 months. Managing high-reliability supply chains requires rigorous Bill of Materials (BOM) hygiene, Total Cost of Ownership (TCO) modeling, multi-source supplier risk mitigation, and scientific safety stock calculations.


4-Step Strategic Supply Chain & Hardware Logistics Framework

Step 1: Bill of Materials (BOM) & Lifecycle Sourcing

  1. The Indented Engineering BOM (eBOM -> mBOM):
    • Map every physical component down to primary manufacturer part numbers (MPN), approved alternate sources, and lifecycle status:
      • Active: In volume mass production.
      • Not Recommended for New Designs (NRND): Flagged for phase-out.
      • End of Life (EOL): Must identify replacement drop-in equivalents immediately.
  2. Single-Source Risk Elimination:
    • Every mission-critical component (ASIC, sensor, battery, PCB substrate) must have at least two qualified, production-tested suppliers (Dual-Sourcing Strategy).

Step 2: Total Cost of Ownership (TCO) & Landed Cost Modeling

  1. The Landed Cost Formula:
    • Never evaluate suppliers solely on unit purchase price (FOB factory gate). Calculate true Landed Cost: $$text{Landed Cost} = text{Unit Ex-Works Price} + text{Ocean/Air Freight} + text{Customs Tariffs} + text{Insurance} + text{Scrap Rate} + text{Inventory Carrying Cost}$$
  2. Incoterms 2020 Standardization:
    • Define exact legal transfer of risk and freight liability:
      • EXW (Ex Works): Buyer assumes 100% of transport risk and customs from factory floor.
      • FOB (Free on Board): Seller handles local transport to port; buyer assumes ocean freight risk.
      • DDP (Delivered Duty Paid): Seller covers all shipping, insurance, and import duties to buyer’s warehouse.

Step 3: Scientific Inventory Control & Safety Stock

  1. Economic Order Quantity (EOQ): $$EOQ = \sqrt{ rac{2 imes D imes S}{H}}$$
    • Where $D$ = Annual Demand, $S$ = Order Setup Cost, $H$ = Annual Holding Cost per unit.
  2. Safety Stock Formula (Demand & Lead Time Variability): $$text{Safety Stock} = Z imes \sqrt{L imes \sigma_D^2 + D^2 imes \sigma_L^2}$$
    • Where $Z$ = Service level factor (e.g. $1.65$ for 95% fill rate), $L$ = Lead time, $\sigma_D$ = Demand variance, $\sigma_L$ = Lead time variance.

Step 4: Quality Assurance & Factory Audits (AQL Standard)

  1. Acceptance Quality Limit (ISO 2859 / ANSI/ASQ Z1.4):
    • Enforce standard AQL sampling on factory shipments:
      • Critical Defects (Safety/Fire Hazard): 0% tolerance (AQL 0).
      • Major Defects (Device inoperable): AQL 1.0 or 1.5.
      • Minor Defects (Cosmetic scratch): AQL 4.0.

Deliverable Format: Supply Chain Architecture & Sourcing Spec (SUPPLY-CHAIN-SPEC.md)

# Strategic Sourcing & Supply Chain Specification: [Hardware Product]

## 1. Indented Bill of Materials (BOM) Risk Matrix
| Subsystem | Component Name | Primary MPN | Alternate MPN | Lifecycle Status | Lead Time | Single Source Risk |
|---|---|---|---|---|---|---|
| Compute | Main MCU 32-bit | STM32F405 | GD32F405 | Active | 14 Weeks | Low (Dual-sourced) |
| Power | Buck Converter | TPS62130 | RT6253 | Active | 8 Weeks | Low (Footprint compatible)|
| Enclosure | Anodized Aluminum Shell | Custom CNC | Local Sheetmetal | Custom Tooling | 6 Weeks | Medium (1 tooling set) |

## 2. Landed Unit Economics Model
- **Ex-Works Factory Cost**: $42.50
- **Ocean Freight + Logistics**: $3.20 / unit
- **Import Tariffs (Harmonized Code 8471)**: $4.25 (10%)
- **Warehousing & Carrying Cost**: $1.80 / unit
- **Total Landed Unit Cost**: **$51.75** (Target retail MSRP: $199.00 | Gross Margin: 74%)

## 3. Inventory Reorder & Safety Buffer
- **Target Customer Fill Rate**: 98% ($Z = 2.05$)
- **Required Safety Stock**: 1,200 units in central 3PL warehouse
- **Reorder Point**: Trigger production run when inventory drops to 2,800 units.

Worked Example: Navigating Semiconductor Component Allocations

  • Crisis: Primary microcontroller lead time exploded from 12 weeks to 52 weeks during global chip shortage.
  • Execution: Hardware team had pre-qualified a pin-compatible alternative microcontroller in the original eBOM design.
  • Outcome: Swapped parts on the SMT assembly line without a board redesign; preserved 100% on-time customer delivery while competitors halted production for 9 months.

Verification Checklist

  • All critical electrical and mechanical components have verified second sources.
  • Landed cost calculated including tariffs, freight, insurance, and inventory carrying cost.
  • Safety stock mathematically derived from demand and lead time variances.
  • Incoterms explicitly defined on all international purchase orders.
  • Factory quality inspections enforce standard AQL sampling criteria.

Anti-Patterns

  • Single-Source Complacency: Relying on a single specialized component vendor with zero alternate footprint on the PCB.
  • FOB Price Myopia: Choosing a factory 2% cheaper on purchase price whose freight and tariffs make it 15% more expensive landed.
  • Ignoring EOL Notices: Ignoring component manufacturer end-of-life notices until production stops.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.