Run a long autonomous build session from a brief — interview the user with `blind-spots`, prepare the plan and review it with `review-plan`, and wait for explicit final approval to start implementation. Only then decide later ambiguities as recorded rulings and execute without check-ins. Per task a fresh implementer subagent, an independent spec+quality reviewer, a fix loop, then whole-feature QA and a whole-branch review, the plan harvested into the repo's docs and deleted, the run's commits squashed, and a handoff report with rulings and deferred questions. Use when the user says "longshot", "work on this independently", "run with this", "ask me everything up front then go", "I'll be away", or hands over a multi-hour feature or package to build end to end. Do NOT use for a single small change — use `plan` for that.

The file

Show its rules and text

We split this skill into the rules it gives an agent

18 rules. About 0 are common, 15 are distinctive, and 3 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈15

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 3

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Rulings, not stalls: Every conflict, gap, plan defect or judgment call gets decided and written to the ledger as Ruling: <decision> — <why> …

    line 38
  2. Distinctive:

    It outranks this skill's defaults: If none exists, use the default workflow below.

    line 57
  3. Distinctive:

    If the brief opens with a technical question of the user's own, answer it with analysis and a recommendation in the first round.

    line 65
  4. Distinctive:

    Check the brief is one run first: If it describes several independent subsystems, say so before interviewing: propose the decomposition and …

    line 70
  5. Distinctive:

    Keep questions that materially affect usefulness, user workflow, priorities, or the design, even when the implementation would be cheap to …

    line 87
  6. Distinctive:

    Never turn an unanswered question into a ruling to close the frontier.

    line 107
  7. Distinctive:

    When the closing checks above are satisfied, proceed to planning while remaining in preparation.

    line 111
  8. Distinctive:

    After approval, announce "Implementation is starting.

    line 183
  9. Very specific:

    Create the run directory RUN=${TMPDIR:-/tmp}/longshot-<slug> for check logs and review findings.

    line 195
  10. Distinctive:

    Follow the workflow file. Default:

    line 203
  11. Very specific:

    Verify yourself: Run the project's own check command (just check, npm test, cargo test …) in this session.

    line 232
  12. Distinctive:

    Never end a turn on a ping — an ended turn is a stopped run.

    line 251
  13. Distinctive:

    Parallel tasks: only when the plan marks them independent *and* they live in different worktrees — max 3 at once, still one implementer …

    line 253
  14. Distinctive:

    After each task's verify, exactly one line.

    line 281
  15. Distinctive:

    Then sort what the run left in the work tree: Run git status in each writable repo.

    line 328
  16. Distinctive:

    Solution: keep the questions pending.

    line 417
  17. Distinctive:

    Solution: verify that implementation was approved, then re-read the four stops.

    line 423
  18. Distinctive:

    If it is not one of them, decide, write the ruling, continue.

    line 424

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md
<!-- Generated from https://github.com/nielsmadan/agentic-coding — edits here are overwritten. -->

Longshot

Take a brief, settle its consequential decisions with the user, prepare the plan, then get final approval to start implementation and build without check-ins.

Preparation needs the user; implementation is autonomous. Until the Phase 2 start gate is approved, stay read-only and wait for answers to every question you ask. Silence, an empty tool response, a preselected recommendation, elapsed time, and the initial longshot invocation are never answers or start approval. The autonomous contract below applies only after that gate, including its stop rules and troubleshooting advice.

A fresh longshot run needs its own start approval; a previous run's ledger does not authorize new scope.

The contract

Approving the implementation start authorizes staging and implementation commits for the run's work in its writable repos, including on the primary repo's current branch, and squashing those commits at the end of the run (Phase 6). Honor any explicit limits the user gives. Do not ask for a separate commit or squash confirmation.

State it back to the user at the implementation start gate, verbatim in substance:

  1. Every question up front. Finish the interrogation and planning, then wait for the user's final go-ahead. Announce implementation starting; only then are there no more questions except the four stops below.
  2. Rulings, not stalls. Every conflict, gap, plan defect or judgment call gets decided and written to the ledger as Ruling: <decision> — <why> — <cost if wrong>.
  3. Milestone pings only. One line per completed task. Never a question, never a progress summary, never "should I continue?".
  4. Nothing is pushed. Nothing outside the repos named in the brief is touched.

After implementation starts, four things stop the run: an irreversible or destructive operation; a security-sensitive action; a side effect outside the work tree that norms say you ask about first (a merge, a push, a release); or the brief turning out to be wrong about something load-bearing. Everything else is a ruling.

Phase 0 — Recon before questions

Uninformed questions waste rounds and spend the user's patience. Before asking anything, read:

  • the project instruction files (AGENTS.md, CLAUDE.md, README.md)
  • the workflow file — workflow.md / WORKFLOW.md, or whatever the brief names. It outranks this skill's defaults. If none exists, use the default workflow below.
  • any plan or spec doc (docs/plans/*.md, docs/specs/*.md) and note its date
  • the reference/neighbour repos the brief names — for the integration surface and for their tooling: lint, static analysis, git hooks, CI, test layout, release scripts
  • git state: branch, whether there are commits at all, what is untracked

Dispatch at most 3 read-only Explore agents in parallel for the repo sweeps.

If the brief opens with a technical question of the user's own, answer it with analysis and a recommendation in the first round. Do not hand it back.

Phase 1 — The interrogation

Check the brief is one run first. If it describes several independent subsystems, say so before interviewing: propose the decomposition and its order, and run longshot on the first piece. One run that plans three projects at once produces a plan whose shape nobody approved. The opposite failure is a brief too small to pay for the overhead — say so and offer plan (see Examples).

Then invoke blind-spots on the brief and run it to completion. Phase 0 already did the recon its step 2 calls for — do not repeat it. Include its intent exploration, framing challenge, and follow-up on promising answers before closing decisions.

The user is still needed through planning and the final start gate. The interrogation ends when the intended outcome is understood, the framing and credible alternatives have been examined, and every consequential decision is settled by existing context, a user answer, or the user's explicit delegation of that decision.

blind-spots supplies the mechanics: dependency-ordered rounds, recommendations on decision questions, and focused exploration where an answer could change the brief. Keep questions that materially affect usefulness, user workflow, priorities, or the design, even when the implementation would be cheap to change. Rule on routine implementation details during the run. Distinguish the user's stated needs from your assumptions; an explicit "use your recommendations" settles the choices offered.

These are mandatory wherever they sit in the tree, because the run cannot proceed correctly without them. Put any still open into the first round:

  • Repo boundary. Which checkouts may be written to, which are read-only reference, and whether new clones/worktrees may be created.
  • Definition of done. "A complete package I can integrate" means something specific — name it: green suite, CI config, docs, a migration branch per consumer.
  • The user's own opening question, answered.
  • Anything where a wrong guess is architectural.

Once a question is asked, keep it pending until the user answers or explicitly asks you to choose. These are required decisions, not optional preferences with timeout defaults. An asynchronous question tool returning means the question was sent; it does not mean the user submitted the selected option. Continue independent read-only work while waiting; if none remains, yield with the questions pending. Never turn an unanswered question into a ruling to close the frontier.

"Use your recommendations" settles the questions it refers to. Recompute the frontier and ask any dependent questions; it does not bypass the final start gate. When the closing checks above are satisfied, proceed to planning while remaining in preparation.

Phase 2 — Plan

Settle the approach before drafting tasks. Carry forward the alternatives and rationale from blind-spots; do not reopen an approach already settled there. Where the settled decisions still leave a genuine fork in how the thing is built — the same requirements reachable two or three structurally different ways, a real fork by brainstorm's test — invoke brainstorm on it in its embedded mode, passing the settled brief, the definition of done and the options you see. It validates each option with an independent critic, presents them with your recommendation, and waits for the user's pick. blind-spots establishes what the work must do; this establishes the shape it takes, and a plan drafted before it is answered bakes in a choice the user never made. If there is no such fork, say so in one line and move on rather than inventing alternatives.

Then draft or validate the plan itself, in the plan format in references/prompts.md. Every task goes to a fresh subagent that has none of this conversation, so the plan is its whole brief: Global Constraints carrying the settled decisions, real code for the interfaces tasks share, and per task the files, tests, acceptance criteria, a model tier and an independence marker. Function bodies stay prose — writing them here does the implementation twice, on the most expensive model.

  • A plan doc exists → read it, then validate it against the current repo state: which steps are already done, which paths moved, what the plan asserts that is no longer true. Fold factual drift into the draft and bring it to the plan format; ask about consequential choices the drift exposes before seeking start approval.
  • No plan doc → draft one now. Use only plan's read-only planning step for the exploration, then recast its output into the plan format. Keep the draft in the conversation or planner output until approval; save it afterwards to docs/plans/<YYYY-MM-DD>-<slug>.md.

Review your own draft before the gate, whether you wrote it or found it on disk:

  • Placeholders — a TBD, an empty section, a task whose verb has no object.
  • Contradictions — two tasks assuming different shapes of the same thing, or an order in which a task needs output from a later one.
  • Scope — anything the definition of done does not require. Cut it and say what you cut; an autonomous run builds whatever is on the list.
  • Ambiguity — a task an implementer could read two ways. It will be read by a fresh subagent with none of this conversation, so pick a reading and write it down.
  • Missing brief — no Global Constraints, a shared type described in prose, or a task without its tier, independence marker, tests or acceptance criteria.

Fix these inline; no second pass. A consequential choice the review exposes goes back to Phase 1.

Then run review-plan over the result — always, whether you drafted the plan or found it on disk, and whatever its size. Your self-review catches what the author can see; an autonomous run has no later check-in to catch the rest. Fold the findings into the plan; a finding that forks the design goes back to Phase 1. Present any finding you rejected, with the reason, at the final gate.

Longshot owns the final start gate; nested planning and review workflows must stay read-only and return here without implementing. Any new consequential decision returns to Phase 1. Resolving it does not itself approve implementation.

Final gate — start implementation

Present the settled decisions, the concrete plan, writable repo boundaries, definition of done, and the contract above. Say that preparation is complete and ask "Start implementation with this plan? After you approve, you can leave it running; I'll handle later decisions and report milestones." Then wait for an explicit reply. This is the single final confirmation that the user is done attending preparation, even when the original brief settled every decision.

A clear "yes", "looks good", "go ahead", or equivalent in response to this gate starts implementation immediately; do not ask again. If the reply changes scope or leaves a consequential choice unresolved, settle it and present the revised gate. Earlier answers to interview questions do not count as approval of this gate.

After approval, announce "Implementation is starting. Up-front questions are complete; you can leave this running. I'll decide later details and send milestone updates." Only now activate autonomous rulings, save the plan, create worktrees, dispatch implementers, or make implementation edits and commits.

Open the ledger at docs/plans/<YYYY-MM-DD>-<slug>-ledger.md (see references/prompts.md for its shape). Record the approved plan, the user's actual start-approval message, and the primary repo's HEAD as its base commit before the first ruling; Phase 3 adds each worktree's base as it creates it. Append to it for the rest of the run; it lives on disk so the phase and approval survive compaction.

Create the run directory RUN=${TMPDIR:-/tmp}/longshot-<slug> for check logs and review findings. Those are working artifacts, not the record — anything that outlives its fix loop goes in the ledger. Keeping them on disk instead of in this session's context is what lets a long run finish without compacting, so route them there even when a report looks short enough to read inline.

Phase 3 — Isolation

Follow the workflow file. Default:

  • Work on the primary repo's current branch unless the user requests another branch.
  • Every foreign repo gets a worktree, branched off its main: git worktree add ../<project>-worktrees/<repo> -b <feature> ../all/<repo>. Record the new branch's HEAD in the ledger as that repo's base commit. Never commit to a foreign repo's main. Never combine two repos in one commit.
  • --no-worktree skips this and works in place.

Phase 4 — The execution loop

Per plan task, in order. Sequential — one subagent at a time. This fixed fan-out is the skill's own and needs no further dispatch approval; do not widen it.

  1. Implement. One fresh write-capable general-purpose subagent. Construct its prompt from scratch — it inherits nothing. It must carry the literal line "Do not dispatch sub-agents; do this work yourself." Template in references/prompts.md.
  2. Review. One fresh general-purpose subagent that has not seen the implementer's reasoning checks the diff against that task's plan section on both spec compliance and code quality. It modifies nothing but its findings file — not Explore, which skims excerpts to locate code rather than audit it, and cannot write a file. It writes its findings to $RUN/review-task-<n>.md and returns only the path, a count and the severities. The findings themselves never enter this session's context.
  3. Fix loop. Hand the fixer the findings path, not the findings — passing the text through here bills it twice. Then re-review, scoped to those fixes only. Two rounds by default, a third only if round 2 actually closed findings; then rule on what is left, record it in the ledger, and move on.
  4. Verify yourself. Run the project's own check command (just check, npm test, cargo test …) in this session. Never delegate this — a subagent reporting "all tests pass" is not evidence. Redirect it and read the end:

    just check > "$RUN/check-task-<n>.log" 2>&1; echo "exit=$?"; tail -30 "$RUN/check-task-<n>.log"

    The exit code and the summary line are the verdict, and a green suite costs you thirty lines instead of thousands. A non-zero exit, or a summary naming failures, means you open the log and read it properly — that is not optional, and it is where the tokens belong. What you must never do is grep the log for the outcome you expect. Failures get fixed, never labelled pre-existing.

  5. Commit the task's work, per the project's commit convention, with the task's box in the plan ticked — resuming after compaction starts at the first unticked one. Work found along the way that the definition of done needs becomes a new plan task with a ruling saying why; anything it does not need is a deferred question.
  6. Ping. One line (see below), in the same message as the next task's dispatch. Never end a turn on a ping — an ended turn is a stopped run.

Parallel tasks only when the plan marks them independent and they live in different worktrees — max 3 at once, still one implementer each.

Whatever you cannot run (a GUI test host, a credentialed deploy, a sandbox-blocked suite) is compile-verified as far as possible, recorded, and carried to the handoff's "Blocked on you" section. It is not a reason to stop.

Model per role

Pass model on every dispatch. An omitted one inherits the session model — usually the most expensive — and that silently puts routine implementation on the top tier. The names are Claude Code's; on another harness use its equivalent tier.

RoleModel
Implementer, Tier: standardsonnet
Implementer, Tier: designopus
Reviewersonnet; opus for a design task, or a diff touching concurrency, security, a persisted format or a repo boundary
Scoped re-reviewsonnet
Fixersonnet; opus in round 3
Phase 5 contract reviewer and fix waveopus — code-review picks its own models

haiku is left out on purpose: working from prose over several steps it takes more turns than it saves in price. The tier comes from the approved plan, not from a judgment made mid-run.

Milestone pings

After each task's verify, exactly one line. No question, no invitation to respond:

Task 3/6 done — consumer registry + bounded sink fan-out, 41 tests, clippy clean. On to install/hooks.

Phase 5 — Feature QA and whole-branch review

Per the workflow file. Default: QA first, then review.

QA the whole feature once, after the last task's commit: qa --fix over everything the run built, through its real user or consumer interfaces, given the definition of done and every task's acceptance criteria. Per-task checks prove each piece; this proves they work together. Have it write its report to $RUN/qa.md and read the count, the coverage and what it fixed. Run the check command yourself after its fixes, as in Phase 4 step 4, and commit them. Whatever QA cannot exercise here goes to "Blocked on you".

Then code-review over the full diff of every touched repo (--quick only if the whole longshot was small), then a fix wave, then a re-review scoped to those fixes. Cross-repo runs get one reviewer whose job is contract coherence — wire formats, manifest shapes, command strings, identity semantics agreeing across repo boundaries.

These are the largest reports in the run, so the same rule binds hardest here: findings go to $RUN/review-branch.md and $RUN/review-contract.md, the fix wave gets the path, and this session reads the count and the severities. Pull a finding into context only when you need to rule on it.

Phase 6 — Harvest and handoff

Harvest the plan into the docs, then delete it. A dated plan is stale the day the work lands, and whoever reads the repo next will not find it. Move what is still true and still useful into the repo's canonical docs — architecture or design docs, README, AGENTS.md, wherever the repo keeps such things (doc --session if it has a doc set): the design decisions and why they were made, the shared interfaces as built, and any constraint on future work. Leave behind the task list, the checkboxes and anything the code now says. Then delete the plan the run saved and commit both. A plan the user supplied was theirs before the run — harvest it the same way but propose its deletion in the handoff rather than doing it.

The ledger stays until the user has read the handoff: it is the record of what was decided on their behalf. Its rulings that constrain future work are harvested now. Move the file itself out of the repo to $RUN/ledger.md before committing the harvest, so the squashed history leaves no trace of it. Delete it with the rest of $RUN once the user has read the handoff.

Then sort what the run left in the work tree. Run git status in each writable repo. Keep the files the run created that help the user try out what it built — seeded data, a sample config, a fixture to run against — and list each one in the handoff with what it is for. Delete every other file the run created, such as scratch output, logs and stray screenshots. Leave alone any change the run did not make.

Then squash the run's commits — start approval covers this, so do not ask again. Per writable repo, invoke squash-commits <base> with the base commit the ledger recorded, so the range is exactly what the run committed. Squash a repo only when every commit in <base>..HEAD is the run's and none of them is on a remote. Uncommitted or untracked files do not block it, so leave in place anything the run kept for the user to try out. If either condition fails — the user committed or pushed in that checkout mid-run — leave its history alone and put the squash plan in "Blocked on you" as a before/after commit list awaiting a yes. Keep each repo's pre-squash tip for the report.

Then one report. Template in references/prompts.md. It must contain:

  • Blocked on you — first, because it is what the user reads first: each blocked check with the exact command to run; any squash that had to be skipped, with its reason and proposed commit list; and the deferred questions worth an answer before the next round of work. The rest stay in the ledger.
  • What exists, where — a repo / path / branch / commit-count table.
  • Left for you to try — each uncommitted file the run kept, its path and what it is for.
  • Squashed — per repo, how many commits folded into which subjects, and the pre-squash tip with the undo command git reset --soft <tip>.
  • Where the plan went — which docs received what, and that the plan was deleted.
  • Rulings — the ledger, grouped scope vs. design, each as decision — why — cost if wrong.
  • Nothing was pushed — and which checkouts were left untouched.

Default workflow

Used only when the project has no workflow file:

Pick the next task → parallelizable? send it to a worktree → plan it → big? review the plan multi-agent → implement → QA → code-review (multi; quick for small) → fix everything → squash → re-integrate the worktree.

Examples

Example: a package to be integrated by two other repos

User: "Work on this fairly independently. Other repos are under ../all/juggler and ../all/ringleader. Ask whatever you need up front so you can work independently after. Follow ./workflow.md. In the end I want a complete package I can integrate. One question to start: what about sessions that get killed?"

Actions: read workflow.md, the plan doc, both neighbour repos' tooling and the integration surfaces (3 Explore agents) → answer the killed-sessions question with a recommendation, then blind-spots: round 1 asks the questions answerable now (repo boundary, protocol scope, what "integrate" means, …), round 2 the two that only became questions once protocol scope was settled → validate the plan against the repo → review-plan over it → present the final plan and contract → wait for start approval → announce implementation starting → worktree per consumer repo → 6 tasks through the loop with pings → qa --fix over the whole feature → whole-branch review + contract-coherence pass + fix wave → handoff.

Result: three branches ready to integrate, a rulings ledger explaining every decision made in the user's absence, one XCTest run flagged as theirs to do, and each branch's history squashed to a few commits. Zero required user turns between start approval and the report.

Example: unanswered choices in an asynchronous prompt

The agent asks whether a file contains a complete prompt or reusable instructions, and whether redirected stdin should be read automatically. Both have recommended options, but the user has not replied. The question tool returns immediately.

Actions: keep both questions pending; do only independent read-only work, then yield. If the user says "use both recommendations", record those answers and finish any dependent questions and planning. Present the final start gate and wait. Once the user approves that gate, announce implementation and proceed.

Example: too small for longshot

User: "Add a --json flag to the export command, run it independently."

Action: say this is a plan-sized task, not a longshot, and offer to run plan instead. Longshot's overhead only pays off across many tasks.

Troubleshooting

The agent accepts its own interview recommendations

Cause: applying implementation autonomy during preparation, or treating a question tool's return or preselected option as a user answer. Solution: keep the questions pending. Read the user's actual replies; wait for answers and final start approval. Waiting during preparation is required.

Implementation stalls waiting for the user anyway

Cause: treating an ambiguity as a stop condition after start approval. Solution: verify that implementation was approved, then re-read the four stops. If it is not one of them, decide, write the ruling, continue. A plan defect is a ruling. A conflict between the plan and the spec is a ruling — the spec wins.

Reviews keep passing but the code is wrong

Cause: the reviewer inherited the implementer's framing, or you accepted a subagent's word for a green suite. Solution: the reviewer must be a fresh agent given the diff and the plan section, never the implementer's report, running on at least sonnet — an undeclared model or an Explore agent can quietly downgrade the gate. And run the check command yourself in Phase 4 step 4 — that step is not delegable.

Context runs out mid-run

Cause: a multi-hour run outlives its context window. Solution: recover the current phase and the user's replies first. Pending questions and an unapproved start gate stay pending. During implementation, re-read the plan and ledger, including the recorded start approval, and resume at the first unchecked task. A plan or ledger existing is not itself approval. If approval cannot be recovered, ask before implementing; never invent it.

The user comes back mid-run and asks something

Cause: normal — the contract binds you, not them. Solution: answer, then resume. Do not turn it into a check-in or re-open the interrogation.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.