Define MVP scope and delivery plan from the prioritized FDD Feature List. Makes the IN/POST-MVP/CUT decision per feature (recorded in the single `phase` field, never a separate `mvp` flag), assigns each feature to a Delivery Stripe. Updates feature_list.md and Feature Card frontmatter (phase + stripe). If features already carry a phase (Rebuild where roadmap split phases, or a workbench prototype that already placed its built features into roadmap phases), reads it as the proposed cut instead of re-deciding from scratch, confirms it, and only assigns stripes. After user approval, updates Notion Feature entries with phase and stripe assignment. Phase 5 exit artifact. Required input for pm-stripe JIT cycle.
In this repository51 other files it gives its agents.
- CLAUDE.mdCLAUDE.md
- design-thinkingSkill
- jtbd-buildingSkill
- pm-auditSkill
- pm-business-caseSkill
- pm-business-modelSkill
- pm-business-rule-coreSkill
- pm-business-rule-criticalSkill
- pm-business-rule-governanceSkill
- pm-business-rules-librarySkill
- pm-comms-charterSkill
- pm-decision-modelSkill
- pm-diagramsSkill
- pm-discovery-interviewSkill
- pm-discovery-reportSkill
- pm-domain-analysisSkill
- pm-domain-modelSkill
- pm-entity-registrySkill
- pm-feature-cardSkill
- pm-feature-designSkill
- pm-features-listSkill
- pm-feature-viabilitySkill
- pm-glossarySkill
- pm-hypothesesSkill
- pm-kotlerSkill
- pm-kpisSkill
- pm-lean-canvasSkill
- pm-market-analysisSkill
- pm-meetingSkill
- pm-onboardingSkill
- pm-open-questionsSkill
- pm-personasSkill
- pm-pitch-deckSkill
- pm-prdSkill
- pm-prioritizeSkill
- pm-privacy-requirementsSkill
- pm-problem-validationSkill
- pm-process-flowsSkill
- pm-product-roadmapSkill
- pm-project-charterSkill
- pm-prototypeSkill
- pm-reconcileSkill
- pm-reconcile-statusSkill
- pm-reverse-extractSkill
- pm-root-causeSkill
- pm-scope-briefSkill
- pm-stakeholder-mapSkill
- pm-stress-testSkill
- pm-stripeSkill
- pm-team-rosterSkill
- pm-tech-feasibilitySkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
22 rules. About 0 are common, 15 are distinctive, and 7 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈15
Distinctive · estimate
This author's own choices. Worth a look.
7
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 33
If set to a non-English language: write prose content (descriptions, rationale, rule text) in that language.
- Distinctive: line 34
Never translate: IDs, frontmatter keys and enum values, section headers other skills parse, file names - these stay English always, …
- Very specific: line 38
No workspace, or inputs missing: name which are missing and what each one unlocks, then offer the PREREQ paths - proceed on stated …
- Very specific: line 40
Read pureinn-variables.md / state.json where a value is actually used, not at the top of the run.
- Distinctive: line 52
After user approval: update Notion Feature entries with phase and stripe assignment.
- Very specific: line 74
A phase conflict is surfaced, not resolved silently: If a promoted card's phase differs from the row it came from, the card wins (it is the …
- Distinctive: line 86
All four artifacts from pm-features-list must be approved by user before running this skill
- Distinctive: line 104
Check for existing artifacts:
- Distinctive: line 120
Ask questions in 2 groups.
- Distinctive: line 126
Ask as plain text:
- Distinctive: line 143
After receiving Group 1 answers, Claude does the following before asking Group 2:
- Distinctive: line 145
Read the KANO + V×C output from pm-features-list in context
- Distinctive: line 167
Wait for response. Adjust the cut if needed - user's judgment overrides the framework's suggestion.
- Distinctive: line 173
Use AskUserQuestion tool for these two questions:
- Distinctive: line 195
After answers, show the finalized MVP scope proposal combining Group 1 alignment + Group 2 constraints.
- Distinctive: line 325
After user approves the MVP Scope and Stripe assignment:
- Very specific: line 328
Update features/feature_list.md - fill in the Stripe column and the phase value per feature.
- Distinctive: line 336
If no Notion Feature entries exist (pm-features-list was not pushed to Notion): skip this step.
- Very specific: line 340
Read pureinn-variables.md key "Feature Backlog" → get URL
- Very specific: line 341
Check state.json notion_ids.feature_backlog → if set, use it directly
- Very specific: line 342
If not cached: call mcp__claude_ai_Notion__notion-fetch with the URL, extract data source ID, save to state.json notion_ids.feature_backlog
- Distinctive: line 360
After all updates: report counts (Features enriched, errors).
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
PM - MVP Scope
Agent mode (--agent)
Supports --agent: runs autonomously in a subagent, drafts the artifact from existing inputs, and returns a short summary + coverage note.
- No flag → interactive (default); if inputs are heavy, offer agent mode.
--agent→ obey. First check inputs are complete. Anything missing: do NOT invent it - mark[ASSUMED - what/why]in the output and summary. Never hallucinate to fill a gap.- Review required: the artifact contains commitments - after drafting, require the user's review before finalizing; do not close decisions autonomously.
Artifact language
Checks state.json → artifact_language. Default (unset or "English"): no change in behavior.
- If set to a non-English language: write prose content (descriptions, rationale, rule text) in that language.
- Never translate: IDs, frontmatter keys and enum values, section headers other skills parse, file names - these stay English always, regardless of the setting.
Standalone run
Needs the artifacts listed under Dependencies - it synthesizes them, so without them there is nothing to synthesize.
- No workspace, or inputs missing: name which are missing and what each one unlocks, then offer the PREREQ paths - proceed on stated assumptions marked
[ASSUMED - what/why], or route to the skill that produces the missing input. Never hard-block, and never invent the input. - Writing never depends on
/pureinnhaving run: with no workspace, create just the folder this skill writes into, or write to a path the user names, and say where the file went. - Read
pureinn-variables.md/state.jsonwhere a value is actually used, not at the top of the run. Missing value: continue and name the capability it costs.
What this skill does
Phase 5 / Steps 4-5. Takes the prioritized, dependency-mapped FDD Feature List (Live Register 4, output of pm-features-list) and produces the delivery structure:
- MVP Scope Decision - what is IN (MVP), what is POST-MVP, what is CUT. Decision is per Feature - not per Feature Set. Feature Sets are grouping only and do not affect the MVP cut. MVP membership is recorded in the
phasefield, NOT a separatemvpboolean - see the next section. - Delivery Stripes - parallel development tracks (not time-boxed sprints). Each stripe is an isolated channel for a coherent domain slice (e.g., stripe-checkout, stripe-auth). Features are assigned to stripes based on domain affinity and dependencies.
- Stripe assignment - updates
stripe:field in each Feature Card frontmatter and in feature_list.md.
After user approval: update Notion Feature entries with phase and stripe assignment.
phase is the single axis for MVP membership - no separate mvp flag
The canonical Feature Card carries one field for this: phase (MVP / MVP+ / Phase 1 / … - or a project's own labels like P0 / P1). MVP membership is the phase value: IN-MVP = phase: MVP (or the project's first/P0 phase); POST-MVP = a later phase; CUT = removed / What we are NOT building. Never write a separate mvp: true/false (or roadmap_phase) field - that duplicates phase on the same axis and the two drift apart. One field, one source of truth.
If features already carry a phase (a Rebuild where /pm-product-roadmap already split phases, e.g. P0 Pilot = MVP): the cut is already decided - read it, do not re-litigate IN/POST. This skill's remaining job is then only stripe assignment (delivery channels + dependency order). Confirm the phase-derived cut with the user, then assign stripes.
The same path applies when a workbench prototype already made the cut. A prototype folder at pureinn-workspace/[project-slug]/prototypes/*/ whose meta.md says **Purpose:** workbench was built wider than the MVP on purpose and then cut down by roadmap phase - so its feature-plan-prt.md already carries a phase per built feature. That is a phase decision someone already made over a clickable product; read it, do not re-derive it from KANO/V×C.
| Feature is | Its phase is read from | What this skill does with it |
promoted - a Feature Card with promoted_from: PRT-[NAME]-NNN | the Feature Card and feature_list.md (the source of truth changed hands at promotion) | the rule above - read the phase, assign the stripe |
still PRT-, state built, phase set | feature-plan-prt.md | show it as the proposed IN / later split. It has no FEAT-ID yet, so it gets no stripe and is not written anywhere by this skill |
still PRT-, state built, no phase | - | undecided, not POST-MVP. List it as open and route to /pm-prototype (converge), do not place it here |
next / cut in the plan | feature-plan-prt.md | next carries its phase into Post-MVP; cut carries its recorded reason into Cut. Do not reopen a cut without new information |
in feature_list.md with no prototype counterpart | nowhere yet | the normal Step 1 cut |
Rules for this path:
- Offer, do not impose. Present the split as the workbench's proposal, name the prototype folder it came from, and ask for confirmation. The user's judgment overrides it, same as it overrides KANO/V×C. A change the user makes here to a still-
PRT-feature is recorded in the MVP Scope artifact and flagged as a divergence fromfeature-plan-prt.md- this skill does not edit the prototype folder;/pm-prototypeupdates the plan. - Promotion does not happen here. Turning a
PRT-feature into a Feature Card with a realFEAT-IDandpromoted_from:is done by/pm-prototype, phase by phase (itsreferences/promotion.md). Never write aPRT-ID intofeature_list.md, a Feature Card, or a stripe - a prototype ID in a production register is exactly what the separate ID exists to prevent. First-phase features that are stillPRT-are listed under "awaiting promotion" with the route/pm-prototype; stripes are assigned to them on the re-run after promotion (delta mode). - Match by reference, never by name. A
PRT-feature corresponds to aFEAT-feature only throughpromoted_from:or the prototype'smeta.md→targets. If two look like the same feature and nothing links them, ask - do not merge them on a similar title. - A phase conflict is surfaced, not resolved silently. If a promoted card's
phasediffers from the row it came from, the card wins (it is the live artifact) - say so in one line. - What the workbench split is evidence for. A room agreeing over a prototype is stakeholder alignment, not user evidence. The capacity reconciliation in Step 1 still runs against the confirmed IN-list, and Group 1's "what must the MVP prove" is still asked.
- More than one workbench folder: ask which one governs. A prototype with
**Purpose:** testcarries no phase split and is ignored here.
This is the Phase 5 exit artifact. pm-stripe uses this structure to orchestrate the JIT cycle - picking the next ready feature in each stripe and routing to pm-feature-design + build.
Dependencies
Required before running:
pm-features-list- must include completed Dependency Map, KANO Analysis, and V×C Matrix- All four artifacts from pm-features-list must be approved by user before running this skill
Recommended before running:
pm-prototype(workbench purpose) - if the MVP was cut down in a workbench prototype, itsfeature-plan-prt.mdis the proposed phase split and promotion of the first phase should run before stripes are assignedpm-kpis- North Star and AARRR metrics validate MVP scope alignmentpm-business-case- revenue model and runway inform how aggressive the MVP cut should be
Produces artifacts used by:
features/feature_list.md- updated withphaseand stripe per feature/features/cards/FEAT-*.md-phase:andstripe:fields updated in each stub Feature Cardpm-product-roadmapv3 - delivery view populatedpm-stripe- uses stripe assignments to orchestrate JIT cycle per feature- Notion - Feature entries enriched with phase and stripe assignment
Step 0: Current state check
Check for existing artifacts:
- MVP Scope decision (in feature_list.md MVP column)
- Delivery Stripe assignments (in feature_list.md and Feature Card frontmatter)
Also check: does features/feature_list.md exist with KANO and V×C? Stub Feature Cards created? This skill cannot run without them.
Also check for a workbench prototype: any prototypes/*/meta.md with **Purpose:** workbench. If one exists, read its meta.md and feature-plan-prt.md in full and report it in the state check - folder name, how many built features carry a phase, how many have none, how many are already promoted (Feature Cards with promoted_from:). Then follow the workbench path in "phase is the single axis" above instead of opening Group 1 with a cut from scratch.
Look for: MVP scope that's too large (more than 3-4 months of work), no explicit out-of-scope list, features assigned to stripes that violate dependencies (blocked feature in Stripe 1, blocker in Stripe 2), domain boundary confusion across stripes (mixing unrelated domains in one stripe creates parallel conflict risk).
Interaction: Group related questions (2-4 per round) and confirm before moving on. For any A/B/C/D choice, use the AskUserQuestion tool with one option marked (Recommended) - never print options as plain text. Keep open-ended questions free-text (don't fake options). If the user is unsure, propose 3-4 concrete options plus "Other". Surface an assumption the moment you make one; never fabricate to fill a gap. (Full standard: CLAUDE.md.)
Step 1: Gather inputs
Ask questions in 2 groups. Group 1 drives strategic alignment - Claude shows a preliminary MVP cut after it. Group 2 sets execution parameters.
Group 1 of 2 - Strategic alignment
Ask as plain text:
What is the single most important thing the MVP must prove? Complete this sentence: "We will consider MVP successful if we prove that..." (e.g., "hosts will pay for automated property management", "users can complete a booking end-to-end without human intervention")
Are there any features that must be in MVP regardless of KANO/V×C scoring? Why are they non-negotiable? (technical dependency, contractual requirement, customer commitment, other)
Are there any features that must NOT be in MVP - explicitly excluded for technical, strategic, or resource reasons?
Then use AskUserQuestion tool:
What matters most for this MVP?
A) User experience quality - the product must feel polished and intuitive from day one (Recommended if B2C or high-competition market) B) Revenue validation - proving people will pay, even if experience is rough C) Technical foundation - building the right architecture first, even if MVP is lean D) Speed to market - ship as fast as possible, iterate based on real feedback
After receiving Group 1 answers, Claude does the following before asking Group 2:
- Read the KANO + V×C output from pm-features-list in context
- Apply MVP hypothesis, non-negotiables, exclusions, and priority value to the feature list
- Show a preliminary MVP cut with explicit trade-offs:
Based on your MVP hypothesis and priorities, here is my initial reading:
IN (recommended):
- [feature] - [KANO: M / V×C: Quick Win] → why it's in
- [feature] - [KANO: P / V×C: Big Bet] → worth the complexity because [reason]
BORDERLINE (discuss):
- [feature] - [KANO/V×C score] → Trade-off: including this adds ~[X] to scope but [benefit]. Excluding means [cost/risk].
OUT (deferred):
- [feature] - [reason: Delighter / Indifferent / too complex / explicit exclusion]
Override check:
Any features in OUT that belong IN for reasons KANO/V×C doesn't capture?
(customer commitment, competitive parity, sales dependency, personal priority)Wait for response. Adjust the cut if needed - user's judgment overrides the framework's suggestion. Then proceed to Group 2.
Group 2 of 2 - Execution parameters
Use AskUserQuestion tool for these two questions:
What is the approximate team size for development?
A) Solo developer B) 2 developers C) 3-4 developers D) 5+ developers
What is the MVP timeline constraint?
A) Hard deadline - specific date or event (describe) B) Runway-constrained - must launch before runway runs out (how many months?) C) Milestone-driven - launch when PMF signal is achieved, no fixed date D) No constraint - launch when it's ready
Then ask as plain text:
Are Notion Feature entries already created from pm-features-list? (yes / no - if yes, I'll update existing entries; if no, Notion update is skipped)
Capacity reconciliation (run before finalizing - this is where most MVPs actually blow their timeline): cross-check the Group 1 IN-list size against Group 2's team size and timeline constraint. Rough heuristic: a solo developer clears roughly 2-4 Quick-Win-sized features per week, less for Big Bets; scale with team size but apply a coordination discount (a 4-person team is not 4x a solo dev - closer to 2.5-3x once integration and review overhead is counted). If the IN-list divided by this rate exceeds the stated deadline or runway, say so explicitly and force a second cut pass before generating the artifact: "At [team size], this MVP list is ~[X] weeks of work against a [Y]-week constraint. Which gives: cut more features, extend timeline, or add capacity?" Do not generate an MVP Scope that is silently unrealistic against its own stated constraint - that is the single most common way MVPs slip.
After answers, show the finalized MVP scope proposal combining Group 1 alignment + Group 2 constraints. Ask for final confirmation before generating the full MVP Scope artifact with Feature Sets and Delivery Stripes.
Step 2: Generate MVP Scope
ARTIFACT 1: MVP Scope
# MVP Scope - [Product Name]
> **Phase:** 5 - Feature Planning
> **Date:** [date]
> **MVP definition:** The minimum set of features that delivers the core value proposition
> to the primary persona and enables the first paying customers.
---
## MVP Definition
**What MVP must prove:** [Single hypothesis]
**Success signal:** [Specific, measurable - e.g., "20 paying customers, D30 retention > 40%, NPS > 30"]
**Primary persona served:** [Persona name from pm-personas]
---
## In MVP
| Feature | ID | KANO | V×C | Delivery Stripe |
|---|---|---|---|---|
| [Feature name] | FEAT-[DOMAIN]-001 | Must-be | Quick Win | Stripe 1 |
| [Feature name] | FEAT-[DOMAIN]-011 | Must-be | Big Bet | Stripe 2 |
**MVP total:** [X] features across [Y] stripes ([Z] weeks)
---
## Post-MVP
| Feature | ID | KANO | Reason deferred | Target phase |
|---|---|---|---|---|
| [Feature name] | FEAT-[DOMAIN]-006 | Performance | Not blocking core value | MVP+ |
| [Feature name] | FEAT-[DOMAIN]-040 | Performance | Nice-to-have | Phase 2 |
---
## Cut (Not building)
| Feature | ID | Reason |
|---|---|---|
| [Feature name] | F-050 | Indifferent per KANO - no customer asked for it |Step 3: Generate Delivery Stripes + Stripe Assignment
ARTIFACT 2: Delivery Stripes
# Delivery Stripes - [Product Name]
> **Phase:** 5 - Feature Planning
> **Date:** [date]
> **Definition:** A Delivery Stripe is an isolated development channel for a coherent domain slice.
> MVP cut and stripe assignment are per Feature - not per Feature Set.
> Feature Sets are grouping only. JIT design and build operate at Feature level.
---
## Stripe Overview
| Stripe ID | Name | Domain focus | MVP Features | Goal |
|---|---|---|---|---|
| stripe-checkout | Checkout | Order + Payment | FEAT-ORD-001, FEAT-ORD-002, FEAT-PAY-001 | [Customer can place and pay for an order] |
| stripe-auth | Authentication | User / Auth | FEAT-USR-001, FEAT-USR-002 | [User can register and log in] |
| stripe-[name] | [Name] | [Domain] | [FEAT-IDs] | [Goal] |
**MVP features total:** [X] across [Y] stripes
**Post-MVP backlog:** [X] features (stripe TBD)
---
## Stripe Design Rules
- Each stripe covers a coherent domain slice (minimizes register conflicts between parallel agents)
- No feature is assigned to a stripe if its dependencies are in a different stripe that hasn't started
- Feature Sets span multiple stripes - that is expected and correct
- JIT design (pm-feature-design) runs per feature, per stripe, just before build
- Stripes can run in parallel (different Claude agents / Class Owners per stripe)
---
## Feature-to-Stripe Assignment
| FEAT-ID | Feature | MVP | Stripe | Dependency on |
|---|---|---|---|---|
| FEAT-ORD-001 | [Create] [draft order] [from cart] | true | stripe-checkout | none |
| FEAT-ORD-002 | [Confirm] [order] [after payment] | true | stripe-checkout | FEAT-ORD-001, FEAT-PAY-001 |
| FEAT-PAY-001 | [Validate] [card payment] [for order] | true | stripe-checkout | FEAT-ORD-001 |
| FEAT-USR-001 | [Register] [new account] [with email] | true | stripe-auth | none |
---
## Dependency Sequencing per Stripe
For each stripe, list the execution order based on dependencies:
**stripe-checkout:**
1. FEAT-ORD-001 (no deps)
2. FEAT-PAY-001 (needs FEAT-ORD-001)
3. FEAT-ORD-002 (needs FEAT-ORD-001 + FEAT-PAY-001)
**stripe-auth:**
1. FEAT-USR-001 (no deps)
2. FEAT-USR-002 (needs FEAT-USR-001)Step 4: Update Feature Cards and feature_list.md
After user approves the MVP Scope and Stripe assignment:
- For each feature, update the
stripe:field and thephase:field in the Feature Card frontmatter at/features/cards/[FEAT-ID].md. The MVP decision is written as thephasevalue (MVP/MVP+/Phase N- or the project'sP0/P1…), not a separatemvpfield. - Update
features/feature_list.md- fill in the Stripe column and thephasevalue per feature. Do not add a separate MVP true/false column -phasecarries it (IN-MVP = first/MVP/P0phase). If the list already has a straymvporroadmap_phasecolumn, collapse it intophase.
Step 5: Notion update
Runs after user approves both artifacts.
If no Notion Feature entries exist (pm-features-list was not pushed to Notion): skip this step.
5a. Get Notion connection
- Read
pureinn-variables.mdkey "Feature Backlog" → get URL - Check
state.json notion_ids.feature_backlog→ if set, use it directly - If not cached: call
mcp__claude_ai_Notion__notion-fetchwith the URL, extract data source ID, save tostate.json notion_ids.feature_backlog
5b. Enrich Feature entries
For each Feature, update the existing Notion entry via mcp__claude_ai_Notion__notion-update-page.
Only update MVP and POST-MVP features. Do NOT push CUT features - they remain in local feature_list.md only.
| Property | Value | Source |
Phase | "MVP" (MVP features) / "MVP+" (POST-MVP features) | Artifact 1 MVP decision |
Dev Stripe | "Stripe 1" / "Stripe 2" / ... / "Stripe 7" | Artifact 2 stripe number (Stripe 1 = first stripe defined, Stripe 2 = second, etc.) |
FEAT-ID | FEAT-[DOMAIN]-[NUMBER] | feature_list.md |
Dev Stripe mapping: Named stripes (e.g., stripe-auth, stripe-payments) map to Notion's numbered options by position in the delivery plan. The first stripe defined = Stripe 1, second = Stripe 2, etc. The domain name is preserved in local Feature Card frontmatter and feature_list.md.
5c. Confirm
After all updates: report counts (Features enriched, errors). Remind user that pm-stripe will orchestrate the JIT cycle - picking the next ready feature per stripe when build starts.
Internal completeness checklist
<!-- Claude reference only -->MVP Scope must cover:
- MVP hypothesis stated
- MVP success signal defined (measurable)
- In MVP list with stripe assignment
- Post-MVP list with reason for deferral and target phase
- Cut list with rationale
- MVP size is realistic vs. team and timeline
- Workbench prototype present: its phase split was shown as a proposal and confirmed, no
PRT-ID written intofeature_list.md/ cards / stripes, unpromoted first-phase features routed to/pm-prototype
Delivery Stripes must cover:
- Each stripe has a coherent domain focus (minimizes register conflicts)
- Each stripe has a named goal (testable outcome)
- No feature assigned to a stripe that violates its dependency order
- Dependency sequencing per stripe is explicit
- Stripes can run in parallel without register conflicts
For SaaS/AI products:
- Onboarding flow is in Stripe 1 or 2
- Payment integration is in MVP stripes (if paid product)
- AI features have a fallback plan if AI output quality isn't ready
- Data pipeline features are before AI features in stripe order
- Account deletion (GDPR) is before launch stripe
- Admin/support tooling has at least a minimal stripe in MVP
Save to
pureinn-workspace/[project-slug]/artifacts/phase-5-planning/mvp-scope.md
pureinn-workspace/[project-slug]/artifacts/phase-5-planning/delivery-stripes.md
pureinn-workspace/[project-slug]/features/feature_list.md (updated: MVP + stripe columns)
pureinn-workspace/[project-slug]/features/cards/FEAT-*.md (updated: stripe field in frontmatter)Handoff
Čo si teraz má: MVP Scope (IN/POST-MVP/CUT per feature) + Delivery Stripes - jasné čo sa stavia a v akých paralelných kanáloch. Phase 5 exit.
Ďalší krok: /pm-stripe — spusti JIT delivery cyklus, rieši features jednu po druhej per stripe v dependency poradí.
Môžeš preskočiť ak: Pred buildom ešte potrebuješ technický základ - najprv /common-ground (stack, repo štruktúra).
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.