Writes or restructures an implementation plan in the format the phase-orchestrator skill consumes: dependency-ordered phases with explicit scope, acceptance criteria, validation commands, and status/log conventions. Use when the user asks to write a plan for phase orchestration, prepare a plan or PRD for delegated multi-agent implementation, or convert a spec, checklist, or design doc into implementable phases.
8 other projects use a version of this, 2 of them edited.
Adopted by
Most recently taken up by
- hraness/wrenchedited, first seen Sep 28, 2026
- hraness/atetedited, first seen Sep 28, 2026
- hraness/personal-monorepo-templateword for word, first seen Sep 28, 2026
Other versions8 projects use a version of this.
Word for word · 6
- hraness/oompa★ 9100% same
- hraness/message-like-me★ 7100% same
- hraness/textbutler★ 7100% same
- hraness/personal-monorepo-template★ 4100% same
- hraness/aicharts★ 4100% same
- hraness/oh★ 3100% same
Edited · 2
- hraness/atet★ 799% same
- hraness/wrench★ 779% same
Wrote their own version · 0
None found.
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository4 other files it gives its agents.
- phase-final-reviewerSkill
- phase-implementerSkill
- phase-orchestratorSkill
- phase-reviewerSkill
The file
We split this skill into the rules it gives an agent
5 rules. About 0 are common, 4 are distinctive, and 1 is very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈4
Distinctive · estimate
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 28
Follow the repo's convention for design docs (for example plans/<author>/ in repos that define one).
- Distinctive: line 76
If a phase exists only to set up a later phase, say which one, so the orchestrator knows a deviation there propagates.
- Distinctive: line 83
Use standalone spec language.
- Distinctive: line 90
Put shared context in Constraints once rather than repeating it per phase.
- Distinctive: line 109
Keep the Implementation log section present even when empty, so run updates have a stable place to land.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Write Phase Plan
Goal
Produce a plan document that a phase-orchestrator run can execute without re-deriving structure. Each phase must be implementable by a worker that has no chat history: the phase section is the worker's entire brief, plus repo rules and the code itself.
The plan is the source of truth during the run. The orchestrator updates phase status and appends log entries as it goes, so the document must be written to absorb that.
Where The Plan Lives
Follow the repo's convention for design docs (for example plans/<author>/ in
repos that define one). One markdown file per plan. Link out to the PRD/spec
rather than duplicating it.
Document Structure
# <Feature name>
## Overview
One or two paragraphs: what is being built and why. Link the PRD/spec.
## Constraints
Repo-wide facts every phase needs: commit/PR policy, validation commands,
branch or worktree requirements, anything the orchestrator must not infer.
## Phases
A short table or list: phase ID, name, depends-on, parallelizable-with.
## Phase 1: <name>
- **Status:** Not started
- **Depends on:** none | Phase N
- **Objective:** one sentence, the outcome not the activity.
- **Scope:** the files/modules this phase owns (its write scope).
- **Out of scope:** adjacent work this phase must not touch.
- **Approach:** implementation notes — key decisions already made, pointers
to the code the worker should read first, known landmines.
- **Acceptance criteria:** checkable statements (see below).
- **Validation:** exact commands to run, plus any manual checks.
## Phase 2: <name>
...
## Implementation log
(Empty at authoring time. The orchestrator appends one entry per phase:
date, phase, summary, validation results, review outcome, commit SHAs,
deviations, remaining risks.)Sizing And Ordering Phases
- One phase = one implementer worker session. If a phase's Approach section needs subheadings to stay coherent, split it.
- Order by dependency, foundations first. A schema/migration phase is always its own phase (and in many repos its own PR — record that in Constraints).
- Phases that can run in parallel must have disjoint write scopes. Declare parallelizability explicitly in the phase list; the orchestrator will not guess.
- If a phase exists only to set up a later phase, say which one, so the orchestrator knows a deviation there propagates.
Writing For A Context-Free Worker
The implementer sees the plan, the repo, and nothing else. So:
- Use standalone spec language. No "as discussed", "still", "instead of the old approach", or references to conversations that produced the plan.
- Name concrete things: file paths, function names, commands — not "the relevant helper" or "the usual checks".
- State decisions as decisions. If something is genuinely unresolved, mark it as an explicit open question and say who resolves it (the worker may decide in-scope questions; the orchestrator escalates cross-cutting ones).
- Put shared context in Constraints once rather than repeating it per phase.
Acceptance Criteria
Each criterion must be checkable by the reviewer from the diff and the running code, without asking the author:
- Good: "
POST /orgs/:id/invitesreturns 403 for a non-admin member; covered by a route test." - Bad: "Invites are properly secured."
Include the negative space: what must not change (existing behavior, public contracts, performance characteristics) when regression there is a real risk.
Status And Log Conventions
- Phase status vocabulary: Not started, In progress, Done, Partial, Blocked.
- The orchestrator owns status transitions and log entries during the run; the author sets everything to Not started.
- Keep the Implementation log section present even when empty, so run updates have a stable place to land.
Anti-Patterns
- Phases split by activity (design/build/test) instead of by deliverable — every phase should end with validated, committable work.
- Two phases that edit the same files marked as parallel.
- Acceptance criteria that restate the objective instead of testing it.
- A plan that embeds the whole PRD — link it and keep the plan operational.
- Hidden sequencing: prose that implies an order the phase list doesn't state.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.