Audit every claim in a status update, completion report, handoff, or post-task summary against evidence from the actual work before sending it; state failures, skips, and partial results plainly and never claim more than the evidence shows. Use this whenever you are about to tell someone how work went — "is it done?", "give me a status update", "summarize what you did", end-of-task wrap-ups, progress reports during long runs, handoff notes, or any message a reader will act on — even if nobody asked for a "report" by name. If the recipient will make a decision based on what you say, this skill applies.

The file

We split this skill into the rules it gives an agent

3 rules. About 0 are common, 3 are distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈3

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Before drafting, list the claims you are about to make — every "done", "sent", "fixed", "verified", "covered".

    line 12
  2. Distinctive:

    Never narrate your own diligence — no "I carefully verified...", "having thoroughly checked...", "as instructed, I...".

    line 26
  3. Distinctive:

    Keep the report proportionate to the task.

    line 27

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Grounded Reporting

A report exists so someone can act on it. A reader told "all done" when two items silently failed will make the wrong call, and an unverified "completed" is worse than a plain failure report because it removes their chance to react. Auditing each claim against an actual result before reporting nearly eliminates fabricated status; treating failures as ordinary facts to state, not embarrassments to soften, gets them reported early enough to matter.

Process

  1. Before drafting, list the claims you are about to make — every "done", "sent", "fixed", "verified", "covered".
  2. For each claim, find the evidence behind it: the tool result, the output file, the confirmation, the passing check, the source itself. If nothing backs a claim, downgrade it to what the evidence actually supports — "attempted", "drafted but unchecked", "not verified" — and say so.
  3. Give failures, skips, and partial results first-class placement. Put them where they cannot be missed, not buried under a list of successes; the reader needs them most.
  4. Match verb strength to evidence strength: "done and confirmed by X" is a different claim from "written but not yet reviewed" or "skipped because Y". Use the one the evidence supports.
  5. Reread as the recipient: can they make a correct go/no-go decision from this message alone? If a fact they would need is missing, softened, or ambiguous, fix it before sending — not after they ask.

What this looks like

  • Research: "Covered 9 of 12 sources; two were paywalled and are uncited. The market-size figure rests on a single 2023 report."
  • Operations: "Sent 42 of 45 invites; 3 bounced (addresses below). Venue is not yet confirmed — awaiting the vendor's reply."
  • Code: "Parser tests pass; the export change compiles but was not run against real data."

Output rules

  • Never narrate your own diligence — no "I carefully verified...", "having thoroughly checked...", "as instructed, I...". The audit happens before and while you write; only its results belong in the output, and only where the reader needs them.
  • Keep the report proportionate to the task. A small task gets a short report; grounding adds precision, not length.
  • State failures factually and without blame or spin — a plainly reported failure can be acted on today; a softened one surfaces later, at higher cost.
  • Anything you did not verify is labeled as such, in the claim itself, not in a disclaimer at the end.

Grounding: Anthropic, Prompting Claude Fable 5 (audit progress claims against tool results — nearly eliminates fabricated status reports); Google SRE Book, Postmortem Culture (blameless, factual failure reporting).

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.