Migrates Cypress, Selenium, WebdriverIO, or Protractor suites to Playwright in staged slices, each with a parity gate before the old test is deleted. Use when porting a legacy browser suite, when deciding which tests are not worth porting, when a half-finished migration has stalled with two suites running in parallel, or when a suite migration needs a plan before anyone starts translating files.

We split this skill into the rules it gives an agent

15 rules. About 0 are common, 11 are distinctive, and 4 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈11

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 4

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Use this skill when an existing browser suite is moving to Playwright and the migration needs to finish.

    line 10
  2. Distinctive:

    Do not open a test file to translate until this is finished.

    line 37
  3. Very specific:

    Run unslop-tests over the source suite to make the drop and rewrite decisions on evidence rather than impression.

    line 51
  4. Very specific:

    Write it as a decision record.

    line 66
  5. Distinctive:

    every ported test's intent maps to at least one new test, recorded in a mapping table

    line 97
  6. Distinctive:

    delete the source tests in this slice

    line 109
  7. Distinctive:

    remove the source framework's config for the deleted area

    line 110
  8. Distinctive:

    update CI so the old job stops running those tests

    line 111
  9. Distinctive:

    update the README's coverage section

    line 112
  10. Distinctive:

    Every slice that ends without a deletion adds to the maintenance burden the migration was supposed to remove.

    line 114
  11. Very specific:

    When the last slice lands: remove the source framework from package.json, delete its config, its plugins, and its CI job.

    line 116
  12. Very specific:

    Keep the plan visible using ./resources/migration-plan-template.md:

    line 120
  13. Distinctive:

    no deletion step, so the migration is 90 percent done for a year

    line 138
  14. Distinctive:

    every source test is classified as port, rewrite, merge, drop, or defer, with counts recorded

    line 163
  15. Distinctive:

    no explicit waits, brittle selectors, or compatibility wrappers were carried across

    line 166

≈ “Common” is an estimate: at least 1 in 5 of the 308,232 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Migrating Tests to Playwright

Use this skill when an existing browser suite is moving to Playwright and the migration needs to finish.

The characteristic failure is not a hard translation problem. It is a migration that stalls at 60 percent, leaving two suites, two CI jobs, two sets of conventions, and nobody willing to delete the old one because nobody can prove the new one covers the same ground. Everything below is arranged to prevent that: slices with parity gates, and a deletion at the end of every slice.

The second thing this skill insists on: a migration is the cheapest opportunity you will ever get to not port the tests that should not exist. A line-by-line translation preserves the old suite's flakiness, its weak assertions, and its coverage gaps, and adds a migration's worth of risk on top.

When to Use

  • a Cypress, Selenium, WebdriverIO, or Protractor suite is moving to Playwright
  • a migration is underway and has stalled with both suites running
  • someone is about to start translating files and there is no plan
  • the question is which tests to port and which to drop
  • a framework is being evaluated and the migration cost needs estimating

Operating Principles

  • Slices, not a big bang. Migrate a vertical slice, prove parity, delete the old tests in that slice, then move on. Two suites is a temporary state with a deadline, not a phase.
  • Every slice ends with a deletion. Without it, the old suite survives forever and the migration is never done.
  • Port behaviour, not code. The old test's intent is the requirement. Its implementation is not.
  • Triage before translating. Tests that are flaky, redundant, or prove nothing get dropped or rewritten, not carried over.
  • Parity is measured, not asserted. A slice is done when the new tests fail on the defects the old ones caught.
  • Adopt Playwright's model rather than emulating the old one. A Cypress-shaped Playwright suite gets the migration cost and none of the benefit.

Workflow

Phase 0: Inventory and triage

Do not open a test file to translate until this is finished.

Classify every test in the source suite:

ClassSignalAction
PortCovers real risk, passes reliably, assertions are meaningfulMigrate
RewriteCovers real risk, but is flaky, over-mocked, or asserts nothingMigrate the intent, write the test fresh
MergeDuplicates another test's coverageFold into one
DropTests a removed feature, or proves nothing, or is permanently skippedDelete, with a note
DeferReal coverage, low risk, expensive to portBacklog, and say so out loud

Record the counts. "We are porting 140 tests" and "we are porting 90, rewriting 20, dropping 30" are different projects with different estimates.

Run unslop-tests over the source suite to make the drop and rewrite decisions on evidence rather than impression. A suite where 30 percent of tests pass with the feature deleted is a suite where the migration should be a rewrite.

Phase 1: Establish the target shape

Decide the Playwright conventions before the first file, or the first ten files set them accidentally.

  • fixtures versus page objects, and what goes in each
  • auth strategy: storageState set up once, not a login in every test
  • data strategy: API seeding through fixtures, with teardown
  • what stays real and what gets stubbed
  • tags and projects
  • folder layout

Decide this deliberately rather than letting the first ten files settle it. The designing-test-automation-architecture skill (planned) will own this decision; until it exists, make the calls above explicitly and record them.

Write it as a decision record; see documenting-test-suites. In eight months someone will ask why the migration did not just keep the old page objects.

Phase 2: Slice the work

A slice is a vertical journey, not a directory. "Checkout" is a slice; "all the tests in specs/forms/" is not.

Order slices by:

  1. A thin one first, to prove the toolchain, CI, reporting, and auth end to end. Two or three tests.
  2. Highest risk next, so the most valuable coverage moves to the maintained framework earliest.
  3. Most flaky after that, because those tests are costing time now and the rewrite pays back immediately.
  4. Everything else, by cohesion.

For each slice record: the source tests, the target tests, the parity evidence, and the deletion commit.

Phase 3: Translate

Per-construct mappings are in ./resources/cypress-to-playwright-map.md and ./resources/selenium-to-playwright-map.md, including the constructs that have no direct equivalent and need a different approach.

Rules while translating:

  • Take the assertion, question the mechanics. Selectors, waits, and helper chains are the old framework's shape.
  • Do not port waits. Explicit sleeps and manual wait helpers become web-first assertions. This is the single largest quality gain available in the migration; do not carry the waits across.
  • Do not port selectors blindly. A brittle CSS chain becomes a role or label locator. If the application has no accessible name to target, that is a finding worth raising.
  • Do not port custom commands one for one. A Cypress custom command is often a fixture, sometimes a helper, and occasionally three unrelated things that should be split.
  • Do not build a Cypress compatibility layer. A cy-shaped wrapper over Playwright pays the migration cost, keeps the old model, and adds an abstraction nobody else will understand.

Phase 4: Prove parity

The gate that makes deletion safe. For each slice, work through ./resources/parity-gate-checklist.md. The load-bearing checks:

  • every ported test's intent maps to at least one new test, recorded in a mapping table
  • the new tests run green three times consecutively
  • for at least the slice's highest-risk cases, the new test fails when the behaviour is broken. Break it deliberately and watch. A test that has never failed is a test whose value is unmeasured.
  • the new suite's runtime and flake rate are recorded
  • the coverage the slice deliberately dropped is listed explicitly

Without the deliberate-break check, parity means "both suites are green", which is compatible with the new suite testing nothing.

Phase 5: Delete

Same pull request as the parity evidence, or the next one. Not "later".

  • delete the source tests in this slice
  • remove the source framework's config for the deleted area
  • update CI so the old job stops running those tests
  • update the README's coverage section

Every slice that ends without a deletion adds to the maintenance burden the migration was supposed to remove.

When the last slice lands: remove the source framework from package.json, delete its config, its plugins, and its CI job. A dependency left behind gets updated by a bot forever.

Phase 6: Track and report

Keep the plan visible using ./resources/migration-plan-template.md:

  • slices done, in progress, and remaining
  • tests ported, rewritten, merged, dropped, deferred
  • runtime and flake rate, old suite against new
  • coverage deliberately dropped, in one list
  • the projected finish date, updated honestly

A stalled migration is usually a migration nobody was reporting on.

Common Failure Modes

  • translating file by file in alphabetical order, so the highest-risk coverage moves last
  • porting the flaky tests unchanged, importing every problem into the new suite
  • keeping both suites running "for confidence", which doubles the maintenance and halves the trust
  • a wrapper that makes Playwright behave like the old framework
  • porting explicit waits into Playwright, then wondering why it is no faster
  • declaring parity because both suites are green, without ever seeing the new tests fail
  • no deletion step, so the migration is 90 percent done for a year
  • dropping coverage silently instead of listing it
  • migrating without deciding the target architecture, so the first ten files become the convention

Resource Map

  • ./resources/cypress-to-playwright-map.md - construct-by-construct mapping, including custom commands, intercepts, and the constructs with no equivalent
  • ./resources/selenium-to-playwright-map.md - Selenium and WebdriverIO mapping, waits, page objects, and grid to project matrix
  • ./resources/migration-plan-template.md - slice plan, inventory counts, progress tracking, and the report format
  • ./resources/parity-gate-checklist.md - the per-slice gate, including the deliberate-break check and the deletion step

Related Skills

  • designing-test-automation-architecture (planned) - to decide the target shape before the first file is translated
  • unslop-tests - to triage the source suite so weak tests are rewritten rather than ported
  • ui-playwright-test-developer (planned) - for how the ported tests should be written
  • mocking-network-and-time - when the source suite's intercepts and stubs need re-expressing
  • stabilizing-flaky-tests (planned) - for the source tests classified as rewrite because of flakiness
  • automating-ci-test-pipelines (planned) - for the CI transition and running both suites during the overlap
  • documenting-test-suites - to record the migration decision and the new conventions

Definition of Done

This skill is complete when:

  • every source test is classified as port, rewrite, merge, drop, or defer, with counts recorded
  • the target architecture is decided and written down before translation starts
  • work is sliced by vertical journey, with the thin proving slice first and the highest-risk slice second
  • no explicit waits, brittle selectors, or compatibility wrappers were carried across
  • each slice has a mapping table from old test intent to new test
  • each slice's highest-risk tests have been observed failing on deliberately broken behaviour
  • each slice ends with the source tests deleted in the same or the next pull request
  • coverage deliberately dropped is listed in one place
  • the source framework and its CI job are removed when the last slice lands

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.