Skill426 starsChanged 6 months agoMITView on GitHub
4-phase execution loop for work units - IMPLEMENT, VALIDATE, ADVERSARIAL REVIEW, COMMIT
- Reads credentials
- Deletes or force-pushes
- Commits and pushes
In this repository19 other files it gives its agents.
- AGENTS.mdAGENTS.md
- skills/setup/templates/AGENTS.mdAGENTS.md
- templates/AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- skills/setup/templates/CLAUDE.mdCLAUDE.md
- templates/CLAUDE.mdCLAUDE.md
- brainstorming-extensionSkill
- create-issueSkill
- design-review-gateSkill
- external-toolsSkill
- handling-pr-commentsSkill
- handoffSkill
- migrateSkill
- plan-review-gateSkill
- pr-shepherdSkill
- setupSkill
- startSkill
- statusSkill
- visual-reviewSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
44 rules. About 0 are common, 38 are distinctive, and 6 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈38
Distinctive · estimate
This author's own choices. Worth a look.
6
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 24
Phase 3 (ADVERSARIAL REVIEW): ALWAYS a fresh Task() instance (roleType("adversarial-reviewer")) in BOTH modes.
- Distinctive: line 50
Before submitting a plan to the Design Review Gate, the orchestrator MUST verify every item on this checklist.
- Distinctive: line 67
If the plan includes HTTP endpoints or WebSocket protocols, verify:
- Distinctive: line 81
If the plan includes a user interface:
- Distinctive: line 106
Every plan submitted for Design Review MUST include these sections:
- Distinctive: line 338
Only after PASS from adversarial review.
- Very specific: line 356
Update BEADS task status: bd close <wu-task-id> --reason "4-phase loop complete.
- Distinctive: line 357
If this work unit has a human checkpoint flag, pause and report before continuing
- Distinctive: line 358
Update the Project Context Document with completed work unit details
- Very specific: line 361
If this work unit created or modified services, factories, database tables, or shared modules, update SERVICE-INVENTORY.md with the new …
- Distinctive: line 388
IMPLEMENT → VALIDATE: Always. No exceptions.
- Distinctive: line 389
VALIDATE → REVIEW: ONLY if ALL validation checks pass:
- Distinctive: line 395
REVIEW → COMMIT: ONLY if adversarial review returns PASS, or rule line 5 downgraded every remaining blocker to a follow-up
- Very specific: line 397
Re-review after fix: MUST spawn a FRESH reviewer (new roleType("adversarial-reviewer") instance, no memory)
- Distinctive: line 424
When the rule says iterate:
- Distinctive: line 429
Only COMMIT after the fresh reviewer returns PASS, or rule line 5 downgraded every remaining blocker to a follow-up
- Very specific: line 431
Coder model escalation: after escalation.coder.after_failures failed VALIDATE attempts (default 2, read from .metaswarm/models.yaml), …
- Distinctive: line 435
When the rule says escalate, report:
- Distinctive: line 484
When multiple work units have no dependencies on each other, execute them in parallel — but with structured convergence points.
- Distinctive: line 503
Converge for validation: Wait for ALL parallel implementations to complete, then validate each
- Distinctive: line 505
Sequential commits: Commit work units one at a time to maintain clean git history
- Distinctive: line 506
If any FAIL: Only re-run the failed work unit's loop — don't re-run passed units
- Distinctive: line 540
After each Phase 4 (COMMIT), add the completed work unit to the table
- Distinctive: line 541
After each Phase 1 (IMPLEMENT), update patterns if new ones emerge
- Distinctive: line 558
After each Phase 4 (COMMIT) — add the completed work unit
- Distinctive: line 580
After the Plan Review Gate approves a plan AND the user approves it, persist immediately:
- Distinctive: line 599
After each phase transition, update the execution state:
- Distinctive: line 631
When the orchestrator detects it has lost context (after compaction or in a new session), it recovers by reading persisted state:
- Distinctive: line 654
After the PR is created (or the plan is abandoned):
- Distinctive: line 678
After work units that change database schemas
- Distinctive: line 679
After work units that modify security-sensitive code
- Distinctive: line 680
After the first work unit in a new architectural pattern
- Distinctive: line 681
Before any destructive or irreversible operation
- Distinctive: line 683
Before work units that depend on external services (APIs, SDKs requiring credentials)
- Distinctive: line 685
Ask: "Do you have these configured?
- Distinctive: line 689
When reaching a checkpoint, present this report and wait for explicit human approval:
- Distinctive: line 723
After ALL work units are complete and committed, run a final comprehensive review across the entire change set.
- Very specific: line 793
After the final comprehensive review passes but BEFORE creating the PR, run /self-reflect to extract learnings into the knowledge base.
- Distinctive: line 817
When IMPLEMENT or VALIDATE goes wrong during the 4-phase loop, follow this structured recovery.
- Distinctive: line 847
Attempt 2: If same failure, try alternative approach
- Distinctive: line 848
Attempt 3: If still failing, gather all evidence for escalation
- Distinctive: line 860
After 3 failed VALIDATE attempts, escalate to human with full context:
- Distinctive: line 912
Before execution (Plan Validation):
- Distinctive: line 940
After all work units:
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Orchestrated Execution Skill
Core principle: Trust nothing. Verify everything. Review adversarially.
This skill defines a generalized 4-phase execution loop that any orchestrator can invoke when implementing work units. It replaces linear "implement then review" flows with a rigorous cycle that independently validates results and adversarially reviews against a written spec contract.
Coordination Mode Note
This skill is mode-agnostic — the 4-phase execution loop works identically in both Task Mode and Team Mode. The differences:
- Phase 1 (IMPLEMENT): In Team Mode, the coding subagent may be a persistent teammate (retains context across work units). In Task Mode, it's a fresh
Task()per work unit. Role type:roleType("coder"). - Phase 3 (ADVERSARIAL REVIEW): ALWAYS a fresh
Task()instance (roleType("adversarial-reviewer")) in BOTH modes. Never a teammate, never resumed. - All quality gates: Unchanged regardless of mode.
See ./guides/agent-coordination.md for full mode detection and coordination details.
Plan Review Gate
After drafting an implementation plan (Step 1: Plan Validation), submit it to the Plan Review Gate before writing-plans presents the plan (or before you present it to the user); see ./guides/workflow-enforcement.md. The gate spawns 3 adversarial reviewers (Feasibility, Completeness, Scope & Alignment) — all must PASS. See skills/plan-review-gate/SKILL.md for details.
When to Use This Skill
- Complex tasks decomposed into multiple work units
- Tasks with a written spec containing Definition of Done (DoD) items
- Multi-agent orchestration where subagents produce work that needs verification
- High-stakes changes where self-reported "it works" is insufficient
Do NOT use for: Single-file bug fixes, copy changes, or tasks without a spec.
1. Plan Validation (Pre-Flight Checklist)
Before submitting a plan to the Design Review Gate, the orchestrator MUST verify every item on this checklist. This prevents expensive design review cycles on fundamentally broken plans.
Note: the Architect is spawned as
roleType("planner"), which can writePLAN.mditself (it is not read-only, unlike the reviewer types). Role types are resolved per Role type resolution.
Architecture Checklist
- Every data access goes through a service layer (no direct DB calls from routes/handlers)
- Each work unit has a single responsibility (max ~5 files created/modified)
- Error handling strategy specified (typed error hierarchy, how errors cross layer boundaries)
- No hard-coded configuration — environment variables for all external service config
Dependency Graph Checklist
- Each WU's dependencies are minimal (only depends on what it actually imports/uses)
- No unnecessary serialization — WUs that CAN be parallel ARE marked parallel
- No circular dependencies
- Integration WUs exist to wire components into the app shell (not just built in isolation)
API Contract Checklist
If the plan includes HTTP endpoints or WebSocket protocols, verify:
- Every HTTP endpoint specifies: method, path, request schema, all response status codes, error response shapes
- WebSocket message types fully specified (client-to-server AND server-to-client message type tables)
- Protocol concerns documented: heartbeat, reconnection, acknowledgment strategy
- Response codes are explicit (not "returns the todo" but "returns 201 with the created todo")
Security Checklist
- Trust boundaries identified (which inputs are untrusted?)
- Input validation specified for every endpoint/handler (schema, max size)
- Rate limiting specified for expensive operations (AI API calls, file uploads)
- Authentication/authorization requirements documented
- Secrets management documented (.env pattern, .gitignore verification)
UI/UX Checklist
If the plan includes a user interface:
- User flows documented with trigger, steps, and visible outcome (see UI-FLOWS.md template)
- Text-based wireframes for each screen showing layout and interactive elements
- Empty states, loading states, and error states defined for each view
- Integration work units explicitly created to wire components into the app shell
- Component hierarchy documented (what renders what, where)
External Dependencies Checklist
- All external services identified (APIs, SDKs, third-party services)
- Required credentials/config documented (env var names, how to obtain)
- Human checkpoint planned BEFORE work units that depend on external services
- Graceful degradation specified for when credentials are missing
.env.exampleincludes all required env vars
Completeness Checklist
- All human checkpoints from the spec are included
- All features from the spec have at least one work unit
- Tooling is consistent (one package manager, matching config files across WUs)
- No WU exceeds ~5 files or ~3 distinct concerns
- WUs that are too large are split with explicit dependencies between parts
If any checklist item fails, fix the plan BEFORE submitting to Design Review Gate.
Required Plan Sections
Every plan submitted for Design Review MUST include these sections:
- Work Unit Decomposition — WU list with DoD items, file scopes, dependencies
- API Contract (if applicable) — structured endpoint/protocol specs:
### POST /api/todos - **Request Body**: `{ title: string }` (required, 1-500 chars, trimmed) - **Success**: `201 Created` -> `{ id, title, completed, createdAt, updatedAt }` - **Errors**: `400` (validation) / `500` (internal) - Security Considerations — trust boundaries, input validation table, rate limiting table, secrets management
- User Flows (if UI exists) — text wireframes and interaction flows (use UI-FLOWS.md template)
- External Dependencies — services, credentials, setup instructions
- Human Checkpoints — named pause points with review criteria
2. Work Unit Decomposition
A work unit is the atomic unit of orchestrated execution. Before entering the 4-phase loop, decompose the implementation plan into work units.
Work Unit Structure
Each work unit contains:
| Field | Description | Example |
| ID | Unique identifier (BEADS task ID) | bd-wu-001 |
| Title | Human-readable name | "Implement auth middleware" |
| Spec | Written specification with acceptance criteria | Link to design doc section |
| DoD Items | Enumerated, verifiable done criteria | [ ] Middleware rejects expired tokens |
| Dependencies | Other work units that must complete first | [bd-wu-000] |
| File Scope | Files this work unit may touch | src/middleware/auth.ts, src/middleware/auth.test.ts |
| Human Checkpoint | Whether to pause for human review after completion | true for risky changes |
Constructing Dependency Graphs
Work units form a directed acyclic graph (DAG):
wu-001 (schema changes) ───┐
├──→ wu-003 (API endpoints) ───→ wu-005 (integration tests)
wu-002 (shared utilities) ──┘ │
▼
wu-004 (UI components) ────────────────────────────────────→ wu-006 (e2e tests)Rules for decomposition:
- Each work unit has a single responsibility — one logical change
- File scopes should not overlap between parallel work units
- Dependencies must be explicit — no implicit ordering assumptions
- Work units at the same depth with no interdependencies run in parallel
- Each DoD item must be independently verifiable (not "code looks good")
Decomposition Template
# Create work units as BEADS tasks under the epic
bd create "WU-001: <title>" --type task --parent <epic-id> \
--description "Spec: <spec-section>\nDoD:\n- [ ] <item-1>\n- [ ] <item-2>\nFile scope: <files>\nCheckpoint: <yes/no>"
# Set up dependencies
bd dep add <wu-003> <wu-001>
bd dep add <wu-003> <wu-002>3. The 4-Phase Execution Loop
For each work unit, execute these four phases in sequence. Do not skip phases. Do not combine phases. Do not proceed to the next phase until the current phase produces a clear outcome.
┌─────────────────────────────────────────────────────────────────┐
│ 4-PHASE EXECUTION LOOP │
│ │
│ ┌──────────┐ ┌──────────┐ ┌──────────────┐ ┌──────┐ │
│ │ IMPLEMENT│───→│ VALIDATE │───→│ ADVERSARIAL │───→│COMMIT│ │
│ │ │ │ │ │ REVIEW │ │ │ │
│ └──────────┘ └──────────┘ └──────┬───────┘ └──────┘ │
│ ▲ │ │
│ │ FAIL │ │
│ └─────────────────────────────────┘ │
│ │
│ FAIL: fix → re-validate → FRESH review → severity rule (cap 10) │
└─────────────────────────────────────────────────────────────────┘Phase 1: IMPLEMENT
The coding subagent executes against the work unit spec.
Orchestrator actions:
- Spawn a coding subagent (role type
roleType("coder")) with the work unit spec, DoD items, file scope, and the Project Context Document - The subagent implements the change following TDD (test first, then implementation)
- The subagent reports completion — but the orchestrator does NOT trust this report
Subagent spawn template (role type roleType("coder")):
You are the CODER AGENT for work unit ${wuId}.
## Spec
${spec}
## Definition of Done
${dodItems.map((item, i) => `${i+1}. ${item}`).join('\n')}
## File Scope
You may ONLY modify these files: ${fileScope.join(', ')}
## Project Context
${projectContext}
## Rules
- Follow TDD: write failing test first, then implement to make it pass
- Do NOT modify files outside your file scope
- Do NOT self-certify — the orchestrator will validate independently
- When complete, report what you changed and what tests you added
- NEVER use --no-verify on git commits — pre-commit hooks are mandatory
- NEVER use git push --force
- NEVER suppress linter/type errors with eslint-disable, @ts-ignore, or as any
- NEVER skip tests or claim "tests pass" without actually running themPhase 1 output: List of changed files and new tests.
Phase 2: VALIDATE
The orchestrator independently runs quality gates. Never trust subagent self-reports.
Orchestrator actions (run these yourself, NOT via the coding subagent):
# 1. Type checking
npx tsc --noEmit
# 2. Linting
npx eslint <changed-files>
# 3. Run tests (full suite, not just new tests)
npx vitest run
# 4. Coverage enforcement (BLOCKING — read .coverage-thresholds.json)
# If .coverage-thresholds.json exists, read the enforcement command and run it
# This is NOT optional. Coverage below threshold = VALIDATION FAIL.
if [ -f .coverage-thresholds.json ]; then
CMD=$(node -e "console.log(JSON.parse(require('fs').readFileSync('.coverage-thresholds.json','utf-8')).enforcement.command)")
eval "$CMD"
fi
# 5. Verify file scope was respected
git diff --name-only | while read file; do
echo "$file" # Check each file is within the work unit's declared scope
donePhase 2 outcomes:
- All gates pass → proceed to Phase 3
- Any gate fails → return to Phase 1 (the coding subagent fixes the issue)
- File scope violated → return to Phase 1 (subagent must revert out-of-scope changes)
Critical rule: The orchestrator runs validation commands directly. The orchestrator does NOT ask the coding subagent "did the tests pass?" and accept the answer.
Phase 3: ADVERSARIAL REVIEW
A separate review subagent checks the implementation against the spec contract. This is NOT the same as a collaborative code review — it's adversarial verification.
Key differences from collaborative review:
| Collaborative Review | Adversarial Review |
| APPROVED / CHANGES REQUIRED | PASS / FAIL |
| Subjective quality assessment | Binary spec compliance check |
| Reviewer suggests improvements | Reviewer finds contract violations |
| Same reviewer can re-review | Fresh reviewer required on re-review |
Uses code-review-rubric.md | Uses adversarial-review-rubric.md |
Orchestrator actions:
- Spawn a new review subagent in adversarial mode (role type
roleType("adversarial-reviewer")) - Pass: the spec, the DoD items, and the diff (NOT the coding subagent's self-assessment)
- The reviewer checks each DoD item with evidence (file:line references)
Reviewer spawn template (role type roleType("adversarial-reviewer")):
You are the ADVERSARIAL REVIEWER for work unit ${wuId}.
## Mode
Adversarial — your job is to FIND FAILURES, not to approve.
## Rubric
Read and follow: ./rubrics/adversarial-review-rubric.md
## Spec
${spec}
## Definition of Done
${dodItems.map((item, i) => `${i+1}. ${item}`).join('\n')}
## What to Review
Run: git diff main..HEAD -- ${fileScope.join(' ')}
## Findings
Report every finding with the 6 fields defined in `./guides/delivery-scope.md`:
- title: <short label, ≤ ~80 chars>
- description: <1-3 sentences: what is wrong and why it matters>
- severity: critical | major | minor | nit
- protects: <credible user scenario | explicit requirement | DoD item> # required for critical/major
- evidence: <file:line or expected-vs-found>
- blocker: yes | no # yes only if severity ∈ {critical, major} AND protects is non-empty
## Rules
- Check EACH DoD item. Cite file:line evidence for PASS or expected-vs-found for FAIL.
- Any `blocker: yes` finding means overall FAIL. A critical or major finding without `protects` is advisory (`blocker: no`).
- You have NO context from previous reviews. Judge fresh.
- Report every finding with the 6 fields; minor/nit findings are recorded as follow-ups, not suggestions.Phase 3 outcomes:
- PASS (no
blocker: yesfinding) → proceed to Phase 4; file any minor/nit findings as follow-ups - FAIL (at least one
blocker: yesfinding) → apply the severity rule in On FAIL: iterate (return to Phase 1 with the failure report) or escalate
Fresh reviewer rule: On re-review after FAIL, the orchestrator MUST spawn a new review subagent (role type roleType("adversarial-reviewer")). Never pass previous findings to the new reviewer. Never reuse the same reviewer instance. This prevents anchoring bias and ensures independent verification.
Phase 4: COMMIT
Only after PASS from adversarial review.
Orchestrator actions:
# Stage only files within the work unit's file scope
git add <file-scope-files>
# Commit with reference to work unit
git commit -m "feat(wu-${wuId}): <description>
DoD items verified:
$(dodItems.map((item, i) => `- [x] ${item}`).join('\n'))
Reviewed-by: adversarial-review (PASS)"After commit:
- Update BEADS task status:
bd close <wu-task-id> --reason "4-phase loop complete. PASS." - If this work unit has a human checkpoint flag, pause and report before continuing
- Update the Project Context Document with completed work unit details
After commit, update SERVICE-INVENTORY.md:
If this work unit created or modified services, factories, database tables, or shared modules, update SERVICE-INVENTORY.md with the new entries. This document is read by subsequent coder agents to avoid duplicating existing services.
4. Quality Gate Enforcement
Quality gates are BLOCKING STATE TRANSITIONS, not advisory recommendations. The orchestrator CANNOT advance to the next phase without gate passage.
State Machine
IMPLEMENT ──→ VALIDATE ──→ REVIEW ──→ COMMIT
│ │
↓ ↓
FAIL: FAIL: severity rule (cap 10):
fix + re-run fix + re-validate
+ FRESH re-review
│ │
(max 3 VALIDATE) │
│ │
↓ ↓
ESCALATE ESCALATE when the rule says so
(to human) (to human, with a recommendation)Transition Rules (MUST, not SHOULD)
- IMPLEMENT → VALIDATE: Always. No exceptions.
- VALIDATE → REVIEW: ONLY if ALL validation checks pass:
- Tests pass (exit code 0)
- Coverage meets
.coverage-thresholds.jsonthresholds - Type checking passes
- Lint passes
- File scope respected
- REVIEW → COMMIT: ONLY if adversarial review returns PASS, or rule line 5 downgraded every remaining blocker to a follow-up
- FAIL → retry: Fix the issue, then re-run the FAILED gate (not skip it)
- Re-review after fix: MUST spawn a FRESH reviewer (new
roleType("adversarial-reviewer")instance, no memory) - Max retries: VALIDATE gets 3 attempts, then ESCALATE to human with full failure history (see Recovery Protocol). VALIDATE attempts count consecutive failed VALIDATE runs for the work unit; a VALIDATE PASS resets the count to 0, so each review round's re-validation starts fresh. The number of review rounds is governed separately by the severity rule and its 10-round cap. Three consecutive failures escalate. REVIEW follows the severity rule (see On FAIL below; cap 10 rounds).
On FAIL: Mandatory Re-Review Protocol
A review FAIL (at least one blocker: yes finding) is not retried on a fixed count. After each review round the orchestrator applies the severity rule from ./guides/delivery-scope.md: SAFETY_CAP = 10 rounds per work unit, and the first line that matches wins. "Re-validate" means running Phase 2 (VALIDATE) again.
after each review round (round = 1, 2, ...):
file every minor/nit finding as a follow-up (see Follow-ups)
1. no blocker: yes findings → PASS, advance
2. round >= 10 (SAFETY_CAP) → escalate; report "cap hit" as an overengineering signal
3. the same critical/major finding recurs after a fix attempt for it,
or two reviewers rate the same finding blocker vs. non-blocker → escalate
4. this round fixed ≥1 critical/major, or ≥2 independent reviewers reported blockers
→ fix blockers, re-validate, FRESH review
5. an overengineering signal is present → restate the DoD and re-classify each blocker against the policy;
any still names a credible scenario → escalate with a recommendation;
otherwise downgrade them to follow-ups and advance
6. otherwise → fix blockers, re-validate, FRESH review- Single reviewer. Phase 3 has one reviewer per work unit, so "≥2 independent reviewers" is false. Reviewers of other work units running in parallel don't count.
- Overengineering check (line 5). Signals include repeated review/fix cycles without a new user-visible risk, tests for states the real storage or API cannot produce, and validation growing faster than the feature. Restate the work unit's DoD, re-classify each open blocker, and escalate only if one still names a credible scenario; otherwise downgrade them to follow-ups and commit.
- Malformed output. A FAIL whose findings lack the 6 fields is re-requested once in the contract format, then escalated with the raw output. It is never treated as PASS.
- Follow-ups. Minor/nit findings never block. When
bdis available, file each as a BEADS task (bd create --type task) linked to the work unit. Otherwise, or ifbd createfails, list them under a### Follow-upsheading in the work unit's report; the PR body carries them (see 8.5).
When the rule says iterate:
- Fix every
blocker: yesfinding identified by the reviewer - Re-run Phase 2 (VALIDATE) — ALL quality gates, not just the one that failed
- MANDATORY: Spawn a NEW adversarial reviewer (role type
roleType("adversarial-reviewer"), fresh instance, no memory of previous review) - Only COMMIT after the fresh reviewer returns PASS, or rule line 5 downgraded every remaining blocker to a follow-up
- Apply the severity rule after every round; ESCALATE to human when it says escalate (at most 10 rounds)
- Coder model escalation: after
escalation.coder.after_failuresfailed VALIDATE attempts (default 2, read from.metaswarm/models.yaml), re-spawn the coder withroleType("coder")plus a per-callmodelset toescalation.coder.claude(defaultopus). The per-callmodeloverrides the agent-file default (thecoderrole'ssonnet).
Track each round visibly: "Review round 1/10", "Review round 2/10", etc.
When the rule says escalate, report:
## Review Escalation: Phase 3 ADVERSARIAL REVIEW — WU-<id>
**Rule line**: <2 cap hit | 3 recurring/disputed | 5 overengineering signal>
### Remaining findings
- **Critical**: <title>: <description> — protects: <...> — evidence: <...>
- **Major**: <title>: <description> — protects: <...> — evidence: <...>
- **Minor**: <title> (follow-up filed)
- **Nit**: <title> (follow-up filed)
### Round history
| Round | Verdict | Blockers (critical/major) | Fixed this round | Rule decision |
|-------|---------|---------------------------|------------------|---------------|
| 1 | FAIL | 0 / 2 | — | 6: iterate |
| 2 | FAIL | 0 / 1 | 0 / 2 | 4: iterate |
| 3 | FAIL | 0 / 1 | 0 / 0 | 3: escalate |
### Options
1. **Revise** — fix the remaining blockers (or the requirement they protect), then run a fresh review round
2. **Narrow scope** — move the contentious items to a new issue, then run a fresh review round on what remains
3. **Defer** — shelve this work for later; nothing advances
4. **Cancel** — abandon this work
**Recommendation**: <revise|narrow scope|defer|cancel> — <reason from the rule>What the Orchestrator MUST NOT Do
- "Coverage is close enough at 92%, proceeding to commit"
- "Adversarial review FAILed, committing with an unresolved
blocker: yesfinding anyway" - "Fix applied, skipping re-review since the fix is straightforward"
- "5 FAILs encountered, moving to next work unit without resolution"
- "Tests pass but coverage command failed — proceeding anyway"
What the Orchestrator MUST Do
- "VALIDATION FAIL: coverage at 87%, threshold is 100%. Returning to IMPLEMENT."
- "ADVERSARIAL REVIEW FAIL: 2
blocker: yesfindings. Severity rule line 6: fixing, re-validating, spawning fresh reviewer. Review round 2/10." - "Severity rule line 3: the same major finding recurred after a fix attempt for WU-004. Escalating to human with round history and a recommendation."
- "Review PASS: no
blocker: yesfindings. 1 minor finding filed as a follow-up. Committing." - "Fix applied. Re-running validation. Re-running adversarial review with FRESH reviewer."
5. Parallel Work Unit Execution
When multiple work units have no dependencies on each other, execute them in parallel — but with structured convergence points.
┌──── WU-001: IMPLEMENT ────┐
│ │
Fan-out ──────┼──── WU-002: IMPLEMENT ────┼──── Converge for VALIDATE
│ │
└──── WU-003: IMPLEMENT ────┘
│
┌──── WU-001: REVIEW ────────┤
│ │
Fan-out ──────┼──── WU-002: REVIEW ────────┼──── Sequential COMMIT
│ │
└──── WU-003: REVIEW ────────┘Rules for parallel execution:
- Fan-out implementations: Spawn coding subagents (role type
roleType("coder")) for independent work units simultaneously - Converge for validation: Wait for ALL parallel implementations to complete, then validate each
- Fan-out reviews: Spawn review subagents (role type
roleType("adversarial-reviewer")) for each work unit simultaneously - Sequential commits: Commit work units one at a time to maintain clean git history
- If any FAIL: Only re-run the failed work unit's loop — don't re-run passed units
Stale notification handling: When parallel subagent results arrive after the orchestrator has moved past their work unit (e.g., at a checkpoint), acknowledge them briefly in one line. Do NOT print a full "still waiting at checkpoint" block for each stale notification — this clutters the conversation and wastes context window.
6. Project Context Document
The orchestrator MUST maintain a project context document that grows with each work unit. This is passed to every coder subagent to prevent context loss.
Context Document Structure
# Project Context (Maintained by Orchestrator)
## Tooling
- Package manager: <npm/pnpm/yarn>
- Test runner: <vitest/jest> (<config-file>)
- Linter: <eslint> (<config-file>)
- Build: <vite/webpack/tsc> (<config-file>)
## Completed Work Units
| WU | Title | Key Files | Services Created |
|----|-------|-----------|-----------------|
## Established Patterns
- <pattern-1>: <description>
- <pattern-2>: <description>
## Active Services
See SERVICE-INVENTORY.mdUpdate rules:
- After each Phase 4 (COMMIT), add the completed work unit to the table
- After each Phase 1 (IMPLEMENT), update patterns if new ones emerge
- Pass this document to every coder subagent alongside the work unit spec
Persisting to Disk (MANDATORY)
The Project Context Document MUST be written to .beads/context/project-context.md and kept in sync with the in-memory version. This ensures the context survives context compaction and session boundaries.
# Create directory if needed
mkdir -p .beads/context
# Write/update after each Phase 4 (COMMIT) and at orchestration start
# The file should always reflect the current state of executionWhen to write:
- At orchestration start (initial creation)
- After each Phase 4 (COMMIT) — add the completed work unit
- After each Phase 1 (IMPLEMENT) — update patterns if new ones emerge
- At human checkpoints — snapshot current state
The file is NOT committed to git during execution — it's a working document. It gets cleaned up after the PR is created (or left for the next session if interrupted).
6.5. Plan Persistence (Context Recovery)
Approved plans and execution state are persisted to .beads/ so agents can recover after context compaction or session interruption.
What Gets Persisted
| File | Contents | Written When |
.beads/plans/active-plan.md | The adversarially-reviewed, user-approved implementation plan | After plan review gate PASS + user approval |
.beads/context/project-context.md | Project Context Document (tooling, completed WUs, patterns) | After each Phase 4 COMMIT |
.beads/context/execution-state.md | Current work unit, phase, VALIDATE attempts, review round | After each phase transition |
Writing the Approved Plan
After the Plan Review Gate approves a plan AND the user approves it, persist immediately:
mkdir -p .beads/plans
# Write the approved plan with metadata header
cat > .beads/plans/active-plan.md << 'PLAN_EOF'
# Active Plan
<!-- approved: <timestamp> -->
<!-- gate-iterations: <N> -->
<!-- user-approved: true -->
<!-- status: in-progress -->
<full plan text including work unit decomposition, DoD items, file scopes, dependencies>
PLAN_EOFWriting Execution State
After each phase transition, update the execution state:
cat > .beads/context/execution-state.md << 'STATE_EOF'
# Execution State
<!-- updated: <timestamp> -->
## Current Position
- Active work unit: <wu-id>
- Current phase: <IMPLEMENT|VALIDATE|REVIEW|COMMIT>
- VALIDATE attempts: <0-3> (consecutive failed VALIDATE runs; resets to 0 on PASS)
- Review round: <1-10>
## Work Unit Status
| WU | Status | Phase | VALIDATE attempts (0-3) | Review rounds (0-10) |
|----|--------|-------|-------------------------|----------------------|
| WU-001 | COMPLETE | COMMITTED | 0 | 1 |
| WU-002 | IN-PROGRESS | VALIDATE | 1 | 0 |
| WU-003 | PENDING | — | 0 | 0 |
## Open Findings (orchestrator only, never passed to reviewers)
| Finding | Title | Description | Evidence | Severity | Protects | First round | Fix attempts | Status |
|---------|-------|-------------|----------|----------|----------|-------------|--------------|--------|
| WU-002-F1 | Expired token not rejected | <finding description> | <expected vs. found> | major | <scenario/requirement> | 1 | 1 | open |
## Blocked / Escalated
<any blocked or escalated work units with context>
STATE_EOFContext Recovery Protocol
When the orchestrator detects it has lost context (after compaction or in a new session), it recovers by reading persisted state:
1. Check: Does `.beads/plans/active-plan.md` exist with `status: in-progress`?
- YES → Context was lost mid-execution. Recover.
- NO → No active execution. Start fresh.
2. Recovery steps:
a. Read `.beads/plans/active-plan.md` — reload the approved plan
b. Read `.beads/context/project-context.md` — reload completed work and patterns
c. Read `.beads/context/execution-state.md` — find where execution stopped, and reload its Open Findings table (title, description, evidence, severity, protects, fix attempts) so rule line 3 can still detect a recurring blocker — match each fresh finding by its title/description and protects, and use evidence only as a secondary signal, because a fix can move file:line references. A saved finding without a title (written before this change) falls back to description plus protects; this history is for the orchestrator only — never pass them to a fresh reviewer. A state file written before the column split has a single legacy `Retries` column: read that value as VALIDATE attempts, and take the review round from the Current Position `Review round` line
d. Run `/prime` (metaswarm knowledge priming) for the current work unit — reload relevant knowledge base facts.
The full recovery order is: if bd is installed, `bd prime` (bd context); then read `.beads/plans/active-plan.md` and `.beads/context/*.md`; then `/prime` for knowledge.
e. Resume from the current work unit and phase
3. Announce recovery to user:
"Recovered execution context from BEADS. Resuming from WU-<id>, Phase <phase>."When to trigger recovery: The orchestrator should check for .beads/plans/active-plan.md at the start of any orchestrated execution. If the file exists with status: in-progress and the orchestrator has no plan in its current context, it's a recovery scenario.
Cleanup
After the PR is created (or the plan is abandoned):
# Mark plan as completed (cross-platform sed)
if [[ "$OSTYPE" == "darwin"* ]]; then
sed -i '' 's/status: in-progress/status: completed/' .beads/plans/active-plan.md
else
sed -i 's/status: in-progress/status: completed/' .beads/plans/active-plan.md
fi
# Archive execution state (don't delete — useful for post-mortem)
mv .beads/context/execution-state.md .beads/context/execution-state-<timestamp>.md
# Project context can be kept for reference7. Human Checkpoints (Proactive)
Human checkpoints are planned pauses, not reactive escalations. They are defined in the spec before execution begins.
When to Set Checkpoints
- After work units that change database schemas
- After work units that modify security-sensitive code
- After the first work unit in a new architectural pattern
- Before any destructive or irreversible operation
- At natural boundaries the human specified in the issue
- Before work units that depend on external services (APIs, SDKs requiring credentials)
- Present: service name, required env vars, how to obtain credentials
- Ask: "Do you have these configured? [Y/n]"
Checkpoint Report Format
When reaching a checkpoint, present this report and wait for explicit human approval:
## Checkpoint: <checkpoint-name>
### Completed Work Units
| WU | Title | Status | Review |
| --- | --- | --- | --- |
| WU-001 | Schema migration | PASS | Adversarial PASS |
| WU-002 | Service layer | PASS | Adversarial PASS |
### Key Decisions Made
- <decision-1>: <rationale>
- <decision-2>: <rationale>
Record significant decisions persistently with `bd create "<decision>" --type decision -d "<rationale>"` so they survive compaction and are available across sessions.
### What Comes Next
- WU-003: <description>
- WU-004: <description>
### Questions for Human (if any)
- <question>
---
**Action required**: Reply to continue, or provide feedback to adjust course.Do NOT continue past a checkpoint without human response. This is not a notification — it's a gate.
8. Final Comprehensive Review
After ALL work units are complete and committed, run a final comprehensive review across the entire change set. This catches cross-unit integration issues that per-unit reviews miss.
Final Review Checklist
# 1. Combined diff — see the full picture
git diff main..HEAD
# 2. Full test suite — not just changed files
npx vitest run
# 3. Type check — catch cross-unit type conflicts
npx tsc --noEmit
# 4. Lint — catch cross-unit style issues
npx eslint .
# 5. Coverage — verify overall coverage thresholds
if [ -f .coverage-thresholds.json ]; then
CMD=$(node -e "console.log(JSON.parse(require('fs').readFileSync('.coverage-thresholds.json','utf-8')).enforcement.command)")
eval "$CMD"
fi
# 6. Commit history — verify clean, logical commits
git log main..HEAD --onelineCross-Unit Integration Checks
- No duplicate or conflicting imports across work units
- No conflicting type definitions
- No overlapping test fixtures that could cause interference
- API contracts between work units are consistent
- No leftover TODO/FIXME markers from implementation
- File scope boundaries were respected (no unexpected file changes)
- SERVICE-INVENTORY.md is up to date with all created services
Final Report Format
## Final Comprehensive Review
### Overall Verdict: PASS / FAIL
### Work Units Summary
| WU | Title | Impl | Validate | Review | Commit |
| --- | --- | --- | --- | --- | --- |
| WU-001 | <title> | Done | Pass | Pass | <sha> |
| WU-002 | <title> | Done | Pass | Pass | <sha> |
### Quality Gates
- [ ] All tests pass
- [ ] Type check clean
- [ ] Lint clean
- [ ] Coverage thresholds met
- [ ] No cross-unit integration issues
### Remaining Issues
<any issues found during final review>
### Follow-ups
<minor/nit findings from every gate and work unit: BEADS task IDs, or the items themselves>
### Ready for PR: YES / NO8.5. Pre-PR Knowledge Capture (MANDATORY)
After the final comprehensive review passes but BEFORE creating the PR, run /self-reflect to extract learnings into the knowledge base. This captures implementation insights, debugging discoveries, and architectural decisions while context is freshest — not deferred to post-merge when details have faded.
## Pre-PR Knowledge Capture
Final review PASSED. Before creating the PR, extracting learnings...
/self-reflect
Learnings captured: [N] items added to knowledge base.
Committing knowledge base updates...
Proceeding to PR creation.Why before PR, not after merge? By the time a PR is merged, the implementing agent's context may be gone (session ended, context compacted). The richest insights — why a certain approach was chosen, what debugging dead-ends were hit, which patterns emerged — exist NOW, immediately after implementation. Capture them now.
Follow-ups go in the PR body. Collect every follow-up recorded by the gates and work units (BEADS task IDs, or the ### Follow-ups lists kept when bd was unavailable) and include them in the PR body under a ### Follow-ups heading, so non-blocking findings are not lost.
Knowledge base changes are part of the PR. After self-reflect updates the knowledge base files, commit them alongside the implementation. This ensures learnings are reviewed as part of the PR and land atomically with the code that generated them. Do NOT defer knowledge base commits to a separate PR or post-merge step.
9. Recovery Protocol
When IMPLEMENT or VALIDATE goes wrong during the 4-phase loop, follow this structured recovery. Its 3-attempt cap applies to VALIDATE failures (tests, coverage, lint, typecheck, file scope). REVIEW failures don't use it: they follow the severity rule in On FAIL (cap 10 rounds).
Step 1: DIAGNOSE
Identify what failed and gather evidence:
# Capture the failure
# - Which phase failed? (IMPLEMENT or VALIDATE; a REVIEW failure follows the severity rule in On FAIL instead)
# - What was the error message or FAIL reason?
# - Which DoD items are affected?Step 2: CLASSIFY
Categorize the failure:
| Classification | Description | Action |
| Fixable | Clear error, known fix | Retry with specific fix instructions |
| Ambiguous | Unclear root cause | Investigate before retrying |
| External | Dependency, access, or environment issue | Escalate immediately |
Step 3: RETRY (VALIDATE: up to 3 attempts)
VALIDATE attempts count consecutive failed VALIDATE runs for the work unit; a VALIDATE PASS resets the count to 0, so each review round's re-validation starts fresh. The number of review rounds is governed separately by the severity rule and its 10-round cap.
For fixable and ambiguous VALIDATE failures:
- Attempt 1: Fix the specific issue, re-run from Phase 1
- Attempt 2: If same failure, try alternative approach
- Attempt 3: If still failing, gather all evidence for escalation
Model escalation (coder). Retrying alone never changes the model. After escalation.coder.after_failures failed VALIDATE attempts (default 2, from .metaswarm/models.yaml), re-spawn the coder with roleType("coder") plus a per-call model set to escalation.coder.claude (default opus). The per-call model overrides the agent-file default, so the escalated attempt runs on opus while earlier attempts ran on the coder's configured model.
Track VALIDATE attempts with labels, and remove the retry:N label when VALIDATE passes (review rounds are tracked in .beads/context/execution-state.md, not labels):
bd label add <task-id> retry:1 # or retry:2, retry:3Step 4: ESCALATE
After 3 failed VALIDATE attempts, escalate to human with full context:
## Escalation: Work Unit <wu-id> Failed VALIDATE After 3 Attempts
### Failure History
| Attempt | Phase | Error | Fix Tried |
| --- | --- | --- | --- |
| 1 | VALIDATE | Tests fail: auth.test.ts:34 | Fixed mock setup |
| 2 | VALIDATE | Coverage 94%, threshold 100% | Added edge case test |
| 3 | VALIDATE | Type error in cross-module import | Restructured imports |
### Root Cause Assessment
<best understanding of why this keeps failing>
### Options
1. <option-1>
2. <option-2>
3. Abandon this work unit and restructure
### Recommendation
<which option and why>10. Anti-Patterns
These are explicit DON'Ts. Violating any of these undermines the entire orchestration pattern.
| # | Anti-Pattern | Why It's Wrong | What to Do Instead |
| 1 | Self-certifying — coding subagent says "tests pass" and you believe it | Subagents can hallucinate, skip tests, or misinterpret results | Orchestrator runs validation commands independently |
| 2 | Skipping adversarial review — "the code looks fine, let's commit" | Visual inspection misses spec violations; confirmation bias | Always run adversarial review against DoD items |
| 3 | Reusing a reviewer — same subagent re-reviews after FAIL | Anchoring bias: reviewer remembers previous findings and checks for those specifically instead of reviewing fresh | Spawn a new reviewer instance with no prior context |
| 4 | Passing previous findings to new reviewer — "last reviewer found X, check if fixed" | Creates anchoring bias; new reviewer should find issues independently | Pass only: spec, DoD items, diff. Nothing about previous reviews |
| 5 | Trusting subagent file scope claims — "I only changed the files in scope" | Subagents may accidentally modify files outside scope | Run git diff --name-only and verify each file independently |
| 6 | Combining phases — "implement and validate in one step" | Removes the independence that makes validation meaningful | Run each phase as a distinct step with its own output |
| 7 | Continuing past a checkpoint without human response | Defeats the purpose of proactive checkpoints | Wait. If urgent, escalate — don't skip |
| 8 | Skipping final comprehensive review — "all units passed individually" | Per-unit reviews can't catch cross-unit integration issues | Always run the final review after all units are committed |
| 9 | Skipping coverage enforcement — "tests pass, coverage doesn't matter" | Coverage thresholds exist for a reason; low coverage means untested paths | Read .coverage-thresholds.json and run the enforcement command. Block on failure. |
| 10 | Building UI components in isolation — all components tested but never wired into the app | Users can't interact with components that aren't rendered | Plan must include integration WUs that wire components into the app shell |
| 11 | Proceeding without external credentials — building features that require API keys without verifying the user has them | Features will fail at runtime; user discovers this after 10+ commits | Checkpoint before external-service WUs to verify credentials are configured |
| 12 | Advisory quality gates — treating a blocker: yes FAIL as advisory, or a failed VALIDATE check as a suggestion | Undermines the entire trust model; equivalent to skipping the gate | Quality gates are state transitions. FAIL means retry, iterate under the severity rule, or escalate, never skip. |
| 13 | Using --no-verify — bypassing pre-commit hooks on git commits | Pre-commit hooks catch lint errors, type errors, and formatting issues before they enter history | Never use --no-verify. Fix the underlying issue instead. |
| 14 | Skipping design review gate for a project-sized design doc — going directly from a committed design doc to writing-plans | Expensive implementation work begins on unreviewed designs | Run the 5-agent design review gate between a committed project-sized design doc and planning (see ./guides/workflow-enforcement.md) |
| 15 | Skipping plan review gate — presenting a plan to the user without adversarial review | Plans with feasibility gaps, missing requirements, or scope creep reach implementation | Always run the 3-reviewer plan review gate before presenting any plan |
Quick Reference: Orchestrator Checklist
Before execution (Plan Validation):
- Run pre-flight checklist (architecture, dependencies, API contracts, security, UI/UX, external deps)
- Verify all required plan sections are present
- Fix any checklist failures BEFORE submitting to Design Review Gate
For each work unit:
- Spawn coding subagent (role type
roleType("coder")) with spec, DoD, file scope, and Project Context Document - Wait for implementation to complete
- Independently run: tsc, eslint, vitest, coverage enforcement (do NOT ask subagent)
- Verify file scope with
git diff --name-only - Spawn fresh adversarial reviewer (role type
roleType("adversarial-reviewer")) with spec and DoD - If PASS: commit with DoD verification in message
- If FAIL: apply the severity rule → fix → re-validate → spawn new reviewer (
roleType("adversarial-reviewer"); escalate when the rule says so, at most 10 rounds) - File minor/nit findings as follow-ups (BEADS, else
### Follow-ups) - If human checkpoint: present report and wait
- Update BEADS task status
- Update SERVICE-INVENTORY.md if services/factories/modules were created
- Update Project Context Document with completed work unit
Quality Gate Rules:
- VALIDATE → REVIEW: ONLY if ALL checks pass (tests, coverage, types, lint, file scope)
- REVIEW → COMMIT: ONLY if adversarial review returns PASS, or rule line 5 downgraded every remaining blocker to a follow-up
- FAIL at VALIDATE: retry (max 3 VALIDATE attempts), then ESCALATE; FAIL at REVIEW: severity rule (cap 10) — never skip
- Re-review after fix: MUST use FRESH reviewer (new instance, no memory)
After all work units:
- Run final comprehensive review (with coverage enforcement)
- Verify SERVICE-INVENTORY.md is complete
- Present final report
- Run
/self-reflectto capture learnings (BEFORE PR creation) - Commit knowledge base updates (included in the PR)
- Proceed to PR creation
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.