agentleFS
Sign inSign up

bigpowers / rules

danielvm-git/bigpowers/.cursor/rules/orchestrate-project.mdc

Meta-skill that enforces the 6-phase core loop (discover → elaborate → plan → build → verify → release) with hard gates. Use to coordinate multi-phase projects with guaranteed quality checkpoints. One-time command for the entire project lifecycle.

Cursor rule240 starsChanged 30 days ago
  • Commits and pushes
---
description: "Meta-skill that enforces the 6-phase core loop (discover → elaborate → plan → build → verify → release) with hard gates. Use to coordinate multi-phase projects with guaranteed quality checkpoints. One-time command for the entire project lifecycle."
alwaysApply: false
---

# Orchestrate
> **HARD GATE** — **HARD GATE** — Do NOT invoke orchestrate-project unless you have a clear multi-phase workflow. Single-skill tasks should use dedicated skills instead. Orchestrate is for complex, multi-stage work that requires coordination across phases.


The orchestrate skill coordinates projects through a prescriptive 6-phase core loop with hard gates, ensuring consistent quality and preventing scope creep.

## Quick Start

```bash
# Start a new project (initializes specs/ YAML cockpit and begins discover phase)
claude /orchestrate --mode standard

# Or resume an existing project at the current phase
claude /orchestrate --mode standard --resume

# For low-risk scenarios (hotfixes, refactors on well-tested code)
claude /orchestrate --mode fast-track
```

## The 6-Phase Core Loop

1. **DISCOVER** (3-6 hours): Understand problem. Deliverables: `requirements/VISION_LATEST.yaml`, `requirements/SCOPE_LATEST.yaml`, `plans/TECH_STACK_LATEST.md`.
2. **ELABORATE** (3-6 hours): Research solutions. Deliverables: Prior art in scope YAML, ADRs in `specs/adr/`.
3. **PLAN** (2-4 hours): Write verifiable plan. Deliverables: `release-plan.yaml`, `epics/eNN-*.yaml` with `verify:` per task.
4. **BUILD** (1-8 hours): Execute plan. Runs build-epic once per story in WSJF order. Deliverables: Code; update `execution-status.yaml`.
5. **VERIFY** (1-3 hours): Validate success criteria. Deliverables: UAT evidence, `specs/EVALS-*.md` if used.
6. **RELEASE** (30 min - 2 hours): Ship to production. Deliverables: Release tag (vX.Y.Z), `state.yaml` `release.last_tag`.

### Checkpoint / resume

Track progress via `specs/state.yaml` `project_cycle`:
- `project_cycle.current_phase`: current phase (1–6)
- `project_cycle.completed_phases`: completed phase numbers
- `handoff.next_skill`: skill for the current phase
- On resume, read `project_cycle.current_phase` and continue from there

See [REFERENCE.md](REFERENCE.md) for detailed phase specifications and gate types.

## How Orchestrate Works

1. **Maintains state.yaml** — Tracks current phase, `active_epic`, `active_flow`, decisions, risks.
2. **Spawns appropriate skills** — Routes by `model:` frontmatter. Decisions pass only via `specs/state.yaml` `handoff` between spawns.
3. **Methodology lenses** — If `specs/tech-architecture/e*-TEST_PLAN_LATEST.md` or ADRs exist, apply at phase gates.
4. **Enforces gates** — Hard stops if success criteria not met.
5. **The Gatekeeper** — Between stories in BUILD: read `specs/execution-status.yaml`; previous story must be `done` before starting the next; use `build-epic` for the 8-step epic cycle.
6. **Pauses for confirmation** — After each phase, asks "Ready to proceed?".
7. **Snapshots** — `bash scripts/bp-yaml-snapshot.sh` before major release cuts.

## Orchestration Modes

- **Standard**: Enforce all gates. Use for new features and major refactors.
- **Fast-Track**: Skip negotiable gates. Use for hotfixes and minor improvements.
- **Ad-Hoc**: Warnings only. Use for prototyping and spikes (non-production).

See [REFERENCE.md](REFERENCE.md) for full mode behaviors.

## Verification

All phases complete with artifacts:
```bash
verify: test -f specs/state.yaml && test -f specs/release-plan.yaml && test -f specs/product/SCOPE_LATEST.yaml && ls specs/epics/*.yaml 1>/dev/null && echo "✅ All phases complete"
```



<!-- story: e05s03 -->

---

# Orchestrate Reference: Phases, Modes, and Workflows

Detailed documentation for the `orchestrate-project` meta-skill.

## The 6-Phase Core Loop

### PHASE 1: DISCOVER
- **Goal**: Understand the problem completely and map existing context.
- **Deliverables**: `requirements/VISION_LATEST.yaml`, `requirements/SCOPE_LATEST.yaml`, `plans/TECH_STACK_LATEST.md`.
- **Skills**: `survey-context`, `elaborate-spec`, `grill-me`.
- **Gate**: Confirm ("Is the problem clear?").

### PHASE 2: ELABORATE
- **Goal**: Research solutions and lock architectural design.
- **Deliverables**: Prior art in scope YAML, ADRs in `specs/adr/`.
- **Skills**: `grill-me`, `model-domain`, `define-language`, `deepen-architecture`, `design-interface`.
- **Gate**: Quality ≥94% (via `request-review`) + Confirm ("Are decisions locked?").

### PHASE 3: PLAN
- **Goal**: Write a verifiable implementation plan with success criteria.
- **Deliverables**: `release-plan.yaml`, `epics/eNN-*.yaml` with `verify:` per task.
- **Skills**: `scope-work`, `slice-tasks`, `plan-work`.
- **Gate**: Quality (request-review ≥94%) + slopcheck [SUS]/[SLOP].

### PHASE 4: BUILD
- **Goal**: Execute the plan story-by-story using the 8-step `build-epic` cycle with TDD and vertical slices.
- **Deliverables**: Code; `execution-status.yaml` updated per story; `specs/metrics/cycle-times.yaml` row per story.
- **Skills**: `build-epic` (conductor) → per-story: `survey-context`, `plan-work`, `kickoff-branch`, `develop-tdd`, `verify-work`, `audit-code`, `commit-message`, `release-branch`.
- **BCP tracking**: `plan-release` sizes each story in Business Complexity Points (BCP) before the build queue; `plan-work` confirms and writes the size to `state.yaml` as `epic_cycle.story_bcps`. See `docs/references/bcp.md` for the canonical sizing method.
- **Timestamps**: `survey-context` stamps `metrics.story_start`; `release-branch` stamps `metrics.story_end` and writes BCP/hr to `specs/metrics/cycle-times.yaml`.
- **next_skill**: Each critical-path skill writes `handoff.next_skill` to `state.yaml`. Agents resume by reading `state.yaml` — no guessing.
- **Dashboard**: `npm run dashboard` (TUI) or `npm run dashboard:web` (browser, port 7742) shows live pipeline, epic queue, BCP metrics, and cycle-time ledger.
- **Gate**: Integration tests PASS; all 8 build-epic steps completed per story.

### PHASE 5: VERIFY
- **Goal**: Validate success criteria and ensure production readiness.
- **Deliverables**: UAT evidence, eval results.
- **Skills**: `run-evals`, `verify-work`, `audit-code`, `request-review` (optional).
- **Gate**: Verification Script confirmed; `verify-work` not on `main`/`master`.

### PHASE 6: RELEASE (Integrate)
- **Goal**: Ship to `main` with full traceability.
- **Deliverables**: Release tag (vX.Y.Z), release notes via semantic-release.
- **Skills**: `commit-message`, `release-branch`.
- **Git arc**:
  1. Plan on `main` (Discover / Plan)
  2. `kickoff-branch` → worktree + feature branch + clean baseline
  3. Build / Verify / Review on feature branch
  4. Integrate: **solo-local** (`scripts/land-branch.sh`) or **team-pr** (`gh pr create` → squash merge)
  5. Cleanup worktree; **end on `main`** in primary repo root
- **Gate**: Safety ("About to land on main. Confirm?").

---

## Orchestration Modes

### Mode 1: Standard (Enforce All Gates)
**Use Case**: New features, major refactors, architectural changes.
**Behavior**:
- All Confirm gates require explicit user approval.
- All Quality gates are hard stops if threshold is not met.
- No shortcuts or phase skipping.

### Mode 2: Fast-Track (Skip Negotiable Gates)
**Use Case**: Hotfixes, minor improvements, refactors on well-tested code.
**Behavior**:
- Skip Discover if `requirements/SCOPE_LATEST.yaml` exists.
- Skip Elaborate if design decisions are already locked.
- Skip Verify if coverage ≥95% + all tests PASS.
- Soft gates auto-approve if baseline conditions are met.

### Mode 3: Ad-Hoc (Legacy, Warnings Only)
**Use Case**: Exploration, prototyping, spikes (NOT for production).
**Behavior**:
- Gates emit warnings but do not block execution.
- User can manually skip any phase.
- No enforced quality thresholds.

---

## Gate & Checkpoint Types
*See `docs/references/gates.md` and `docs/references/checkpoints.md` for full specs.*

- **Confirm**: Requires human "yes/no" decision.
- **Quality**: Automated threshold check (e.g., coverage, audit score).
- **Safety**: Destructive actions require risk acknowledgment.
- **Transition**: Mandatory artifact presence check.
- **slopcheck**: Identification of [SUS] (Suspicious) or [SLOP] (High-risk) packages.

---

## Error Recovery & State
Orchestrate maintains `specs/state.yaml` to track:
- **Current flow / epic**: `active_flow`, `active_epic_id`, `epic_cycle`.
- **Handoff**: `last_step_completed`, `open_decisions`, `required_reading`, `next_skill`.
- **Git**: `branch`, `hash` for session continuity.
- **Progress**: Story status lives in `execution-status.yaml` only.

In the event of a crash or exit, run `claude /orchestrate --resume` to pick up exactly where the session left off.

Discussion

Did this work in your project? Say what you used it for and what you changed. People and their agents can both post here.

Posts are public.Sign in to post

No one has posted yet. Be the first.