agentleFS
baney75baney75/myelinate/skills/study-plan/SKILL.md

study-plan

Skill4 starsChanged 2 days agoMITView on GitHub

Use when someone says exam on Friday, what should I study, make a study schedule, or set study reminders. Not general calendar events.

We split this skill into the rules it gives an agent

5 rules. 0 are common, 4 are distinctive, and 1 is very specific to this project.

  • 0

    Common

    Most of the 6 edited versions we read keep these.

  • 4

    Distinctive

    This author's own choices. Worth a look.

  • 1

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Stand down when it isn't wanted: If memory or the person says not to use Myelinate for this subject or kind of request, skip this skill's …

    line 12
  2. Distinctive:

    Not checked on heavily tested targets (check fast)

    line 25
  3. Distinctive:

    Add, never rearrange: Create new events on a calendar they choose.

    line 60
  4. Distinctive:

    Keep the record honest: If a reminder couldn't be created, say so.

    line 62
  5. Distinctive:

    After each session, update states from actual unassisted results and re-rank.

    line 67

“Common” is measured: kept by at least 6 in 10 of the 6 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Study Plan

A plan is only as good as the hours it fits into. Compute real time, rank by what the exam rewards and what the learner can't yet do, schedule retrieval (not rereading), space it, and protect sleep. Then say plainly what won't fit.

Paths like references/…, templates/… and examples/… are relative to this skill's folder, which carries its own copy of every file it names. Other Myelinate skills are siblings (../tutor/SKILL.md) and are installed as their own skills too. If a file is missing from your copy, fetch it from https://raw.githubusercontent.com/baney75/myelinate/main/ plus its path in the repository (references/…, skills/<name>/SKILL.md); if you can't fetch, work from this file and the router's core rules.

Stand down when it isn't wanted. If memory or the person says not to use Myelinate for this subject or kind of request, skip this skill's method and answer plainly; a slash command brings it back.

1. Inputs

  • Scope: study guide / objectives (confirmed) or inferred list (label it). From tutor's course map, or teach's curriculum for self-directed learners.
  • Exam: date and time, format, weight in the course, allowed materials.
  • Real hours: hours they can actually study per day until the exam. Ask; don't assume. Subtract classes, work, sleep (7 to 9 h), commute, other exams.
  • Current state per target: from a quick check (5 to 15 mixed items) or tracked states: Not checked / Needs support / Independent this session / Retrieved after delay / Transferred. Self-ratings are a weak signal; prefer a quick check.

2. Rank

Priority ≈ exam weight × gap × prerequisite leverage.

  1. Needs support on heavily tested targets
  2. Not checked on heavily tested targets (check fast)
  3. Prerequisites that unlock several targets
  4. Needs support on light targets
  5. Independent-this-session items due for delayed retrieval Drop or skim: lightly tested, already retrieved-after-delay, or costly-to-learn-for-one-question items. Say what you dropped and why.

3. Schedule rules (evidence)

  • Retrieval over rereading. Practice testing and distributed practice are "high utility"; rereading and highlighting "low" (Dunlosky et al. 2013).
  • Successive relearning: reach 3 correct recalls per item in session 1, then relearn to 1 correct recall in each of 3+ later sessions spaced ≥ a day apart (Rawson & Dunlosky 2011).
  • Spacing scales with the horizon: the optimal gap was about 20 to 40% of a 1-week test delay and about 5 to 10% of a 1-year delay (Cepeda et al. 2008). For an exam in 7 days, review at about days 1, 3, 6; in 30 days, about 1, 4, 10, 20, 28; with no deadline, the default ladder ~1 → 3 → 7 → 14 → 30 days. These are starting heuristics; adjust to errors.
  • Interleave confusable types once basics are in place (Brunmair & Richter 2019).
  • Pretest each new block; even wrong guesses help later learning.
  • Match the exam format in the final days (timed MCQ sets, drawings, practical stations, essay outlines).
  • Sleep: sleep before learning supports encoding and after learning supports consolidation; don't trade sleep for a final cram. No all-nighters in the plan.
  • Blocks: 25 to 50 min focused blocks, one active task per block, short breaks. A clear "next block" beats a perfect week grid.

4. Output

Use templates/study-plan.md:

  • Exam clock: "Exam Fri 10:00, 3 days, ~11 study hours available."
  • Ranked target list with state
  • Day-by-day blocks: target → activity (tutor drill / lab section / problem set / flashcard review / mixed practice test) → check
  • Next block (start now)
  • If time runs out, drop: …
  • Won't be covered: …
  • Sleep and exam-morning plan (brief warm-up retrieval, no new material)

Calendar entries and reminders: see §4a. A suggested review date is not a reminder. Save the plan and topic states to memory (or the learner profile) so the next session picks up where this left off.

4a. Calendar and reminders (opt-in, no setup required)

Reminders turn a plan into something that happens. They are optional. Offer once when a plan has dates. Create them only if the learner authorizes a calendar and the assistant has real scheduling support, such as a connected calendar tool. Otherwise give the learner a dated list to copy into their calendar and call it a plan, not a reminder.

  • What to add, with their OK: exam dates and assignment due dates from the syllabus (for a class) or from an assistant-run course; spaced review sessions; study blocks they agreed to. Show the list first, then create, then read each event back to confirm it exists.
  • Add, never rearrange. Create new events on a calendar they choose; never edit or delete existing events unless asked.
  • Earlier personal deadlines, by agreement. If they've told you, or the record shows, that work tends to land at the last minute, offer a personal deadline a few days before the real one ("Draft due to yourself Tuesday; real deadline Friday"), labeled clearly as personal so it's never confused with the course's date. Say it plainly and kindly; it's a planning tool, not a judgment. Keep it only if it helps: ask after a couple of deadlines whether it did.
  • Keep the record honest. If a reminder couldn't be created, say so. If dates came from a syllabus you inferred rather than read, mark them "check against your syllabus."
  • Save the deadlines and the early-deadline preference to memory (with their OK the first time) so later plans use them.

5. Re-plan

After each session, update states from actual unassisted results and re-rank. If they fall behind, cut scope, not sleep. Final 24 h: mixed retrieval on high-weight items and confident-wrong areas; no new topics unless heavily tested and quick.

Anti-patterns

Calendar hours instead of real hours · plans that are all reading · equal time per chapter · no "drop" list · all-nighters · planning more than doing (keep planning under ~10% of time) · promising a grade.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.