task-breakdown

Skill1 starsChanged 26 days agoMITView on GitHub

Breaks a PRD or BRD into actionable tasks per phase with dependencies, acceptance criteria, verification steps, and a Trace column to US/AC/TECH, fitted to the existing codebase. Use for "pecah jadi task", "breakdown PRD", or a backlog from a PRD.

21 other projects use a version of this.

Adopted by

Most recently taken up by

Used with

Projects with it also use troubleshooting, to-prd and 1 more.

Other files people use alongside this one.

Files found in the same public projects as a version of this one, more often than they turn up anywhere else. Each project counts once, large collections count for less, and this file's own repository is left out.
  • NVIDIASkill

    troubleshooting

    Diagnose and resolve common issues including test failures, build errors, performance regressions, and development environment problems. Use this skill whenever the user reports something broken, failing, timing out, hanging, or producing unexpected results. Trigger on test failures (elementIsStable timeouts, flaky tests, screenshot diffs), build errors (Cannot find module, wireit cache issues, stale output), CI/CD failures, Git LFS problems, port conflicts, lighthouse score regressions, SSR errors, or environment setup issues.

    Also in 3 projects that use this

  • GoogleSkill

    to-prd

    Turn the current conversation into a PRD and publish it to the project issue tracker — no interview, just synthesis of what you've already discussed.

    Also in 3 projects that use this

  • GoogleSkill

    code-review

    Adversarial systems, concurrency, memory-model, and architecture code review protocol. Use this skill whenever asked to review code, PRs, diffs, or branches in Filament.

    Also in 3 projects that use this

The file

We split this skill into the rules it gives an agent

9 rules. 0 are common, 7 are distinctive, and 2 are very specific to this project.

  • 0

    Common

    Most of the 14 edited versions we read keep these.

  • 7

    Distinctive

    This author's own choices. Worth a look.

  • 2

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    If the PRD doesn't detail the existing structure but says "integrated with system X", ask the user whether there is access to that existing …

    line 18
  2. Very specific:

    No tickets per layer or per file: migration, DTO, test, Swagger, or seeder go into the endpoint/feature ticket that needs them.

    line 33
  3. Distinctive:

    Only what was asked: No tickets for refactors, cleanup, upgrades, docs, or nice-to-haves the request didn't ask for — name them as …

    line 34
  4. Very specific:

    Never group an endpoint/change with a new business rule, a transaction, a permission change, or a new table — that stays its own ticket.

    line 38
  5. Distinctive:

    If the PRD says the existing side only adds a thin proxy layer (auth + forward, no business logic), the task is only that — don't create …

    line 76
  6. Distinctive:

    After the task list is done, include a short table at the end so the BR→…→TECH→Task chain isn't broken:

    line 111
  7. Distinctive:

    Default order (adjust if the PRD has different needs):

    line 123
  8. Distinctive:

    Don't create tasks that duplicate logic across systems: If system A (new) and system B (existing) are both touched by one feature, business …

    line 143
  9. Distinctive:

    Be realistic about what already exists: Don't suggest "rebuild the folder structure" or a "big refactor" unless the PRD asks for it — …

    line 144

“Common” is measured: kept by at least 6 in 10 of the 14 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

PRD to Task Breakdown

Turns a PRD into a task list ready for a tracker (Notion/Jira/Trello/GitHub Issues) or for direct work. Unlike prd-writer (requirement document), this skill focuses on execution: what to do, in what order, and which people/systems are affected.

Step 1: Understand the Project Context

Before creating tasks, determine:

  1. Pure new project (greenfield) or integration/addition to an existing project? Check the PRD's Architecture section — if it mentions other running systems (existing repo, stack that must match, existing endpoints), it's an integration case.
  2. If integrating into an existing project, tasks must follow the folder structure, code patterns, and conventions the PRD names as existing — not a "set up a new project from scratch" task. Quote the concrete paths/files the PRD names (e.g. server/internal/delivery/handlers/canteen_proxy.handler.go, the stores/attendance.js pattern) as direct references in the task, not generic folders like src/handlers/.
  3. If the PRD doesn't detail the existing structure but says "integrated with system X", ask the user whether there is access to that existing codebase (local path, repo) so tasks are precise — don't guess an unmentioned folder structure.
  4. Check whether a BRD document (erp-requirements Part B) already exists (US-xxx, AC-xxx, TECH-xxx) for this feature. If so, it is the primary source for the breakdown — see the traceability rules in Step 4. If not, the source is the PRD only.
  5. Identify how many systems/codebases are affected (e.g. 2 — backend/frontend of the new Kantin system, plus a thin addition to the existing HRIS backend/frontend). Each affected system gets a separate task group; if that system is a separate repo, its tickets get a repo: field (see feature-flow Multi-Repo section).

Ticket Rules (Aturan Tiket) — One Ticket per Endpoint, per Feature, or per Bug

The rule is deliberately simple so the ticket count is predictable:

Change typeOne ticket perTicket contents
Backend (BE)one new or changed endpointthe migration/entity that endpoint needs, DTO, service, controller, validation, test, Swagger, and the API Contract (Kontrak API)
Frontend (FE)one feature/pagecomponents, state, API calls, test
Bug fixone bugthe fix and a test proving that bug doesn't come back. If the bug is in both BE and FE, make two tickets using the BE–FE rules below
Feature without an endpoint (job, scheduler, internal logic change)one featurethe logic and its test
  • No tickets per layer or per file: migration, DTO, test, Swagger, or seeder go into the endpoint/feature ticket that needs them. A migration used by several endpoints goes into the first endpoint ticket that needs it; other tickets depends_on it.
  • Only what was asked. No tickets for refactors, cleanup, upgrades, docs, or nice-to-haves the request didn't ask for — name them as suggestions in the summary instead.
  • Group small changes into one ticket — every ticket pays a fixed cost (new agent, review, commit) of a few minutes, which outweighs a 2-minute change. Group, at most 3 per ticket, in the same repo:
    • BE: endpoints on the same resource that would each be complexity: simple (list, detail, lookup, plain CRUD, a field added to a response) — each endpoint keeps its own block in ## Kontrak API and its own AC.
    • FE/mobile: small changes on the same page/screen (a column, field, filter, label, removed element).
    • Never group an endpoint/change with a new business rule, a transaction, a permission change, or a new table — that stays its own ticket. The grouped ticket is still simple; if it no longer fits simple, split it back.
  • Ticket count is at most the number of endpoints, pages, and bugs — fewer after grouping small changes. If the result is more than 8 for one feature, re-check for per-layer tickets that should be merged.

AC checklist — catch boundary bugs when the ticket is written

Bugs found late (a BUG ticket from the final check) cost the most. When writing AC, go through this list for every input and rule the ticket touches, and add a negative/boundary AC for each item that applies — skip items that don't apply, don't pad:

  • Numbers: the rule's min/max and the database column limit (e.g. int4 max 2,147,483,647, decimal precision/scale). Above the limit → validation error (4xx), never a 500.
  • Text matching (codes, channel, status, email, names used as keys): case-insensitive and trimmed unless the PRD says otherwise; duplicate checks compare the same way.
  • Empty input: missing/null/empty fields, empty list, empty file.
  • Error responses: each error case returns the exact status + code/message from ## Kontrak API.
  • Upload/import: wrong template or columns, empty file, duplicate rows, per-row errors reported with the row number.
  • Dates/periods: first/last day of the period, overlapping periods, timezone.
  • Access: a role that must be rejected.

BE and FE: contract first, work together, check together at the end

  1. The API Contract (Kontrak API) is written when the ticket is created, in the BE ticket's ## Kontrak API section: method + path, request (body/query + validation rules), success response (status + JSON shape), and error responses (status + error code). This contract is the single reference for both sides.
  2. An FE ticket that uses that endpoint fills integrates_with: [<ID tiket BE>] (not depends_on) and refers to the contract. This lets the FE developer start alongside BE, using the contract as reference (types/mocks from the contract), without waiting for BE to finish.
  3. The BE ticket is still picked up first. The FE ticket may run concurrently (parallel mode) or afterwards (sequential mode).
  4. Both sides are tested against the contract, without a real database or server: BE endpoint tests assert the contract's responses; FE tests mock the API with payloads from the contract, including its negative scenarios (validation failure, not found, unauthorized). The real FE↔BE flow runs once in the final check (E2E).
  5. The contract is never changed silently. If during work the contract must change, the developer reports BLOCKED and the orchestrator updates the contract in the BE ticket and records it in both tickets' Riwayat.

Step 2: Extract Tasks from Each PRD Section

PRD sectionBecomes task type
Database SchemaMigration goes into the first endpoint/feature ticket that uses that table, not its own ticket
Core FeaturesBE: one ticket per endpoint (with Kontrak API). FE: one ticket per feature/page with integrates_with to its BE ticket
Architecture — proxy/integrationSeparate integration-specific task (see Step 3)
API DesignSource of the Kontrak API in BE tickets. One ticket per endpoint
User Flow (conditional branches)Added as ACs in the related feature ticket. Own ticket only for processes that run separately (scheduler job, automatic cut-off) — often missed if you only break down Core Features
Design & Technical ConstraintsInitial setup tasks (project scaffolding, CI/CD, environment config) — only for new projects, skip for existing projects

Step 3: Integration Tasks — Precise, Not Generic

This is the part most often done wrong: integration tasks into an existing system must be scoped as tightly as the PRD states, not widened into duplicated business logic.

Principles (apply when the PRD describes a "thin proxy" pattern or similar):

  • If the PRD says the existing side only adds a thin proxy layer (auth + forward, no business logic), the task is only that — don't create tasks that reimplement logic already in the new system
  • Name the existing roles/middleware being reused (e.g. "role employee/hr/administrator already exists in models.UserRole, no new role needed") as a note in the task, so the developer doesn't invent unnecessary new structures
  • If there is a mechanism that doesn't exist yet and must be built (PRD example: service-to-service auth doesn't exist in the existing system), it becomes its own task clearly marked as a new addition to the existing system, not part of the new system
  • Data sync tasks (if any, e.g. a cross-system identity cache) are separate from plain CRUD tasks, because they usually need special consideration (sync schedule, what may/may not be overwritten — check the "Keterangan" column in the PRD's Database Schema for such rules)

Step 4: Output Structure

Group tasks by phase (logical work order, not just per module), then by system/layer within that phase. Format:

## Fase 1: [Nama Fase — misal "Database & Core Backend"]

### Backend — [Nama Sistem, misal "Kantin (baru)"]
- [ ] **[TASK-ID]** [Judul task singkat, actionable]
  - **Deskripsi:** [apa yang dikerjakan, 1-2 kalimat]
  - **Acuan PRD:** [section/bagian PRD terkait, misal "Database Schema — tabel orders"]
  - **Trace:** [hanya kalau ada dokumen BRD (`erp-requirements` Bagian B) — `US-INV-001 / TECH-003 / AC-002` yang dipenuhi task ini]
  - **File/lokasi:** [path konkret kalau project existing, atau struktur folder yang berlaku dari `coding-standards`]
  - **Acceptance Criteria:**
    - [ ] [kriteria terverifikasi 1]
    - [ ] [kriteria terverifikasi 2]
  - **Cara Verifikasi:** [langkah/command konkret untuk membuktikan task ini benar-benar selesai — bukan cuma "sudah dikerjakan". Contoh: "jalankan `go test ./internal/usecase/order/...`, semua lulus" atau "curl endpoint dengan payload X, cek response match skema Y" atau "buka halaman Z, submit form, cek data masuk ke tabel yang benar". Task tanpa cara verifikasi yang jelas biasanya berarti task-nya masih terlalu kabur — pecah lagi]
  - **Dependency:** [task lain yang harus selesai duluan, kalau ada — "Tidak ada" kalau tidak ada]
  - **Estimasi:** [S/M/L atau story point, opsional — hanya isi kalau user minta]

### Backend — [Nama Sistem Existing, misal "HRIS (existing, penambahan)"]
- [ ] **[TASK-ID]** [...]

Task-ID numbering rule: prefix per system/module so it's easy to track, e.g. KTN-BE-001 (Kantin Backend), KTN-FE-001 (Kantin Frontend), HR-INT-001 (integration in HRIS) — consistent and short.

Traceability to the BRD document (erp-requirements Part B, if the document exists):

  • Every TECH-xxx is covered by at least one task; several small TECHs for the same behavior may be merged into one task (the Trace column lists all of them). A TECH that is too large may be split into several tasks, but all refer to the same TECH in the Trace column — don't recreate tasks from the PRD for things already covered by a TECH.
  • Task Acceptance Criteria come from the AC-xxx referenced by that TECH (write the ID, e.g. AC-002: qty > outstanding ditolak), not rewritten in new words.
  • Extra tasks not derived from any TECH (setup, CI/CD, existing integration) are still allowed, but the Trace column is — with the reason in Deskripsi.
  • After the task list is done, include a short table at the end so the BR→…→TECH→Task chain isn't broken:
| TECH | Task-ID | AC yang dipenuhi | Test Case |
|---|---|---|---|
| US-INV-001 / TECH-003 | WMS-BE-004 | AC-002 | TC-INV-002 |

Re-check before finishing: every TECH has ≥1 task, and every AC appears in at least one task. If anything is missing, tell the user.

Step 5: Sensible Phase Order

Default order (adjust if the PRD has different needs):

  1. Database & migration — the foundation, all other tasks depend on it
  2. Backend core — main business logic before endpoints
  3. API endpoints — after the logic exists
  4. Integration with existing systems (proxy, sync endpoint) — after the main API is stable, so you don't integrate against a still-changing API
  5. Frontend — can run parallel with integration if different people, but order it after the basic API exists
  6. Supporting features (notifications, analytics, report export) — usually can come later, not blocking core features
  7. Final check & documentation (integration/E2E with a real database runs once at the end, not as a ticket) — including user-guide (plugin noskill-extras) if needed (Swagger docs go in the endpoint's ticket, not a separate task)

Mark which tasks can run in parallel vs which are strictly sequential via the Dependency column, so when a team/several people work on it it's clear what can start at the same time.

Step 6: After the Task List Is Done

  • Offer to push to a tracker if relevant (e.g. the user uses Notion for project management) — first check whether a connector is available before suggesting it; don't assume a specific tool without confirmation
  • Save the task list as a Markdown file via the file-creation tool available in this environment, so it can be stored/shared, unless the user wants it pushed straight to another tool

Principles

  1. One ticket per endpoint, per feature, or per bug — see the Ticket Rules (Aturan Tiket) section above.
  2. Every task traces back to the PRD. The "Acuan PRD" field isn't a formality — if a task can't be linked to any PRD section, question whether it's needed or is scope creep.
  3. Don't create tasks that duplicate logic across systems. If system A (new) and system B (existing) are both touched by one feature, business logic lives in only one place (per the PRD's Architecture decision) — the other system gets only an integration/proxy task.
  4. Be realistic about what already exists. Don't suggest "rebuild the folder structure" or a "big refactor" unless the PRD asks for it — integration tasks adapt to the existing project, not the other way around, unless the user explicitly asks for a refactor.
  5. "Done" is proven via Cara Verifikasi, not claimed. A task is checked off only after the steps in "Cara Verifikasi" are actually run and the result matches — not because the code "looks right".
  6. Refactor tasks need a plan before becoming a normal task list. If any task is a big refactor (not just adding a feature), don't break it down like a normal feature task — its first task is "draft the refactor plan" (see coding-standards section 1, principle 6) as its own deliverable; the execution tasks follow that plan after it's reviewed.

Related Skills

  • prd-writer — source PRD for the breakdown
  • erp-requirements — if a BRD document (Part B) exists, the source of US/AC/TECH that must be referenced in the Trace column
  • coding-standards — used for backend/frontend folder structure/conventions in new projects (no existing pattern to follow)
  • standup-update (plugin noskill-extras) — after tasks are worked on, progress can be summarized with this skill

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.