algo-sc-safety-stock
Skill238 starsChanged 6 months agoMITView on GitHub
Calculate safety stock levels to buffer against demand and lead time uncertainty. Use this skill when the user needs to set inventory buffers, determine service level trade-offs, or optimize safety stock across SKUs — even if they say 'how much buffer inventory', 'stockout prevention', or 'service level calculation'.
In this repository315 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- algo-ad-biddingSkill
- algo-ad-budgetSkill
- algo-ad-ctrSkill
- algo-ad-gspSkill
- algo-ad-vcgSkill
- algo-blockchain-basicsSkill
- algo-blockchain-smart-contractSkill
- algo-ecom-bm25Skill
- algo-ecom-rankingSkill
- algo-ecom-searchSkill
- algo-forecast-arimaSkill
- algo-forecast-ensembleSkill
- algo-forecast-exponentialSkill
- algo-forecast-prophetSkill
- algo-hr-compensationSkill
- algo-hr-matchingSkill
- algo-hr-turnoverSkill
- algo-mfg-cpkSkill
- algo-mfg-doeSkill
- algo-mfg-fmeaSkill
- algo-mfg-spcSkill
- algo-net-centralitySkill
- algo-net-communitySkill
- algo-net-influenceSkill
- algo-nlp-ldaSkill
- algo-nlp-nerSkill
- algo-nlp-similaritySkill
- algo-nlp-summarizationSkill
- algo-price-bundleSkill
- algo-price-conjointSkill
- algo-price-dynamicSkill
- algo-price-elasticitySkill
- algo-price-van-westendorpSkill
- algo-rank-bayesianSkill
- algo-rank-eloSkill
- algo-rank-trueskillSkill
- algo-rank-wilsonSkill
- algo-rec-cfSkill
- algo-rec-contentSkill
- algo-rec-hybridSkill
- algo-rec-mfSkill
- algo-rec-sessionSkill
- algo-risk-altman-zSkill
- algo-risk-benfordSkill
- algo-risk-creditSkill
- algo-risk-varSkill
- algo-sc-bullwhipSkill
- algo-sc-eoqSkill
- algo-sc-newsvendorSkill
- algo-sc-routingSkill
- algo-seo-backlinkSkill
- algo-seo-contentSkill
- algo-seo-crawlSkill
- algo-seo-pagerankSkill
- algo-seo-schemaSkill
- algo-seo-technicalSkill
- algo-seo-tfidfSkill
- algo-social-engagementSkill
- The first 60 shown.
The file
We split this skill into the rules it gives an agent
5 rules. About 0 are common, 4 are distinctive, and 1 is very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈4
Distinctive · estimate
This author's own choices. Worth a look.
1
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 23
When demand is deterministic (use EOQ without safety stock)
- Distinctive: line 45
Look up z for target service level
- Distinctive: line 84
Demand forecast error, not demand variability: If you use a forecast, SS should buffer forecast ERROR (σ_error), not raw demand variability.
- Distinctive: line 87
ABC segmentation: Don't apply the same service level to all SKUs.
- Very specific: line 95
Run python scripts/safety_stock.py --verify to execute built-in sanity tests.
≈ “Common” is an estimate: at least 1 in 5 of the 364,980 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Safety Stock Calculation
Overview
Safety stock is buffer inventory held to protect against demand and lead time variability. Formula: SS = z × √(LT × σ²_d + d² × σ²_LT) where z=service factor, LT=lead time, σ_d=demand std dev, d=avg demand, σ_LT=lead time std dev. Directly trades inventory cost against stockout risk.
When to Use
Trigger conditions:
- Setting inventory buffers for variable-demand items
- Choosing target service levels and computing required safety stock
- Optimizing safety stock across a portfolio of SKUs
When NOT to use:
- When demand is deterministic (use EOQ without safety stock)
- For one-time purchase decisions (use newsvendor model)
Algorithm
IRON LAW: Safety Stock Is a TRADE-OFF, Not a Target
More safety stock = fewer stockouts but higher holding cost.
The relationship is non-linear: going from 95% to 99% service level
roughly DOUBLES safety stock. Going from 99% to 99.9% doubles it
again. Always quantify the cost of each service level increment.
z-values: 90%→1.28, 95%→1.65, 99%→2.33, 99.9%→3.09.Phase 1: Input Validation
Collect: historical demand data (weekly/monthly), lead time data (average and variability), target service level, unit cost and holding rate. Gate: Minimum 12 periods of demand data, lead time estimates available.
Phase 2: Core Algorithm
- Compute demand statistics: average demand (d), demand standard deviation (σ_d)
- Compute lead time statistics: average LT, LT standard deviation (σ_LT)
- Compute combined variability: σ_combined = √(LT × σ²_d + d² × σ²_LT)
- Look up z for target service level
- Safety stock = z × σ_combined
- Reorder point = d × LT + SS
Phase 3: Verification
Simulate: using historical demand, would the computed SS have prevented stockouts at the target service level? Gate: Simulated service level matches target (±2%).
Phase 4: Output
Return safety stock with cost impact and service level analysis.
Output Format
{
"safety_stock": 250,
"reorder_point": 850,
"service_level": 0.95,
"annual_holding_cost": 5000,
"metadata": {"avg_demand_weekly": 120, "demand_cv": 0.3, "avg_lead_time_weeks": 5}
}Examples
Sample I/O
Input: Weekly demand: avg=100, σ=30. Lead time: avg=4 weeks, σ=1 week. Target: 95%. Expected: σ_combined = √(4×900 + 10000×1) = √(3600+10000) = √13600 = 116.6. SS = 1.65 × 116.6 = 192 units.
Edge Cases
| Input | Expected | Why |
| Zero demand variability | SS from LT variability only | σ_d = 0, only lead time risk remains |
| Zero lead time variability | SS from demand variability only | σ_LT = 0, standard formula simplifies |
| Very long lead time | High SS | More uncertainty accumulates over longer periods |
Gotchas
- Normal distribution assumption: Formula assumes normally distributed demand. Highly intermittent demand (many zeros) needs different approaches (Poisson, negative binomial).
- Demand forecast error, not demand variability: If you use a forecast, SS should buffer forecast ERROR (σ_error), not raw demand variability.
- Service level definition: Cycle service level (probability of no stockout per cycle) ≠ fill rate (fraction of demand met from stock). Companies often mean fill rate but calculate cycle SL.
- Lead time data quality: Lead time variability is often poorly tracked. Underestimating σ_LT leads to insufficient safety stock.
- ABC segmentation: Don't apply the same service level to all SKUs. A-items (high revenue) deserve 99%; C-items may be fine at 90%.
Scripts
| Script | Description | Usage |
scripts/safety_stock.py | Compute safety stock and reorder point with combined demand/lead-time variability | python scripts/safety_stock.py --help |
Run python scripts/safety_stock.py --verify to execute built-in sanity tests.
References
- For multi-echelon safety stock optimization, see
references/multi-echelon.md - For intermittent demand methods, see
references/intermittent-demand.md
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.