Phase 2 of AI Closed-Loop Programming — Commissioning: prove the project's OWN never-seen-working parts (its board, its wiring, its peers/simulators), so that a failing test means the code and not the setup. The testbench itself is never commissioned by a project — its quality is depended on, and fixed in its own repo only when DUT testing disproves it. Use this skill when the user mentions commissioning, bring-up, a new board or peer, wiring or polarity doubts, or wants to burn down the debugging agenda. Exit gate: DUT ready.
- Sends data out
2 other projects use a version of this.
Adopted by
Most recently taken up by
- markbaindesign/bain-studiotheir own version, first seen Jul 22, 2026
- spacedock-dev/spacedocktheir own version, first seen Jun 16, 2026
Other versions2 projects use a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 2
- spacedock-dev/spacedock★ 85same name
- markbaindesign/bain-studio★ 0same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository17 other files it gives its agents.
- buildSkill
- defineSkill
- esp-idf-handlingSkill
- esp-pio-handlingSkill
- grill-meSkill
- harnessSkill
- sdr-receiverSkill
- setup-actionSkill
- signal-generatorSkill
- testbench-bleSkill
- testbench-debugSkill
- testbench-installSkill
- testbench-integrationSkill
- testbench-loggingSkill
- testbench-mqttSkill
- testbench-test-handlingSkill
- testbench-wifiSkill
The file
We split this skill into the rules it gives an agent
2 rules. About 0 are common, 0 are distinctive, and 2 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈0
Distinctive · estimate
This author's own choices. Worth a look.
2
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Very specific: line 19
If the debugging agenda is already burned down, say so and continue as /build — typing the "wrong" door costs nothing.
- Very specific: line 142
All of it lives in testing/test-plan.yaml as dated observations.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Commission — Phase 2 door
A door into the Method skill: the driver, the chain, and the dispatch map
live in ../build/SKILL.md — read that first. This door exists so the phase
can be entered by its own name; the phase itself is always derived from state.
If the debugging agenda is already burned down, say so and continue as
/build — typing the "wrong" door costs nothing.
The law: no project tests the testbench
A project depends on the testbench's quality; it never proves it. The
bench is infrastructure, like the compiler — nobody tests gcc before
compiling. Its quality is the testbench repo's own responsibility: its FSD,
its suite, its acceptance run. A project consumes the bench's declared
capabilities at face value, available: yes as declared.
If DUT testing disproves the bench, fix the bench — but only then. When a red is exonerated of the product by evidence, the bench fault becomes a testbench change request, is fixed at its source, ideally lands as a test in the testbench's own suite, and every future project inherits the fix. Attempting to verify the bench upfront — when nothing yet exists that could expose its errors — buys ceremony, not trust. Real work is the only instrument that finds real bench faults.
What commissioning is, under the law
The debugging agenda (../build/references/test-design.md §5, first question)
lists every project-side part that has never been observed doing its job
here — whatever its reputation elsewhere:
- the DUT board itself — this unit, this slot, first flash, first boot
- project peers and simulators (an M-Bus simulator feeding telegrams)
- project-specific wiring and its polarity
- the project firmware's first contact with each path it uses
Until each is seen working, a failing test measures the environment. The testbench's instruments are not on this list.
- Work the agenda top-down; each item names what proves it. Drive known
patterns (
0x55survives inversion detection), make the simulator emit one whole telegram. - Agenda items are debugging work, not test cases — they never enter the plan. The separator: does it discharge a requirement, or interrogate the setup? Setup measurements go on the capability, with their consequence ("two bursts in six arrive clean → assert across several cycles").
- The
unprovencapability state applies to project-side equipment only — bench-declared capabilities are trusted by the law above. - The bring-up work that is a test case (it discharges a requirement about
the device) is
standardin kind, ordered ahead of the journey. - The DUT and testbench are not always powered. An unreachable bench is an
unmet precondition —
not donewith the reason, neverfailed. - The operator's hands are for physical acts — plug, wire, power, swap. Observations belong to instruments. Never design a step where a human reads a measurement by eye. If no instrument can make the observation, that is a testbench change request.
The worked shape — a typical ESP32 project on the testbench
- Discover the testbench; record hostname, last-seen IP and portal version as dated observations. Tests still select by identity — the record is memory, never a hardcoded address.
- Find the DUT and verify it is what the project expects — slot, chip type and revision, flash size, MAC against the FSD's unit. Mismatch = stop: wrong board in the slot.
- Project peers, if any (a meter simulator): present, answers one basic command; record its slot.
- Prove the forward path with a trivial known-good program — CI
compiles it, the artifact is flashed to the DUT's slot, and its output is
observed. Print alternating
ON/OFFon serial rather than blinking an LED: no GPIO need be wired, no camera or eye is required, and the bench observes it directly with a serial pattern match. One pass proves the whole pipeline — toolchain, artifact flow, flash, boot, observation — with code that cannot itself be the problem. When the project's first real build fails later, the pipeline is above suspicion.
Nothing else. Items 1–3 are seconds; item 4 is one CI cycle. Everything beyond this list is bench-side and covered by the law.
Running the four checks
Discover the bench, then hold its URL in $WB — never write an address into a
committed file.
# 1 · testbench: answers, and in the mode the project needs
curl -s $WB/api/info # hostname, slots configured/running
curl -s $WB/api/wifi/mode # wifi-testing, if the project uses WiFi
# 2 · DUT: the right board, in a free slot
curl -s $WB/api/devices # select by detected_chip, not by label
curl -s -X POST $WB/api/chip/info -H 'Content-Type: application/json' \
-d '{"slot":"<SLOT>"}' # chip, revision, flash size, MAC
# Compare with the unit the FSD records. A mismatch stops the phase.
# Check `debugging` as well as `state`: a live OpenOCD session holds the port
# while the slot still reads idle. Every native-USB ESP32 enumerates as
# 303a:1001, so `detected_chip` is only trustworthy if the bench selects the
# board by USB topology; a bench that does not will confidently report one
# slot's chip for another. Verify the MAC, which is per-board.
# 3 · project peers, if any: present, and answering one basic command
# 4 · forward path: CI artifact → flash → observed marker
gh run download <run-id> -D fw # the same bytes CI built
curl -s -X POST $WB/api/flash -F slot=<SLOT> -F chip=<chip> -F baud=460800 \
-F "bin@<offset>=@<image>" ... # one part per image
curl -s -X POST $WB/api/serial/monitor -H 'Content-Type: application/json' \
-d '{"slot":"<SLOT>","pattern":"<marker>","timeout":30}'Take the flash offsets from the build, never from memory. An ESP-IDF
build ships flash_args beside the images with the authoritative offsets;
they move whenever the partition table changes — dropping a factory
partition shifts the app from 0x10000 to 0x20000, and otadata from
0xd000 to 0xf000. Guessing produces a successful flash with a
hash-verified write and a device that then reports invalid magic byte
(nothing flashed here?) and refuses to boot. Read flash_args; the flash
succeeding is not evidence that it landed where the partition table expects.
Monitor with a pattern and start it before the reset, or match a periodic
marker instead: a boot banner has already scrolled past by the time a monitor
opened afterwards, so a missed match may mean late, not absent. A
heartbeat line (alive 1, alive 2, …) is observable at any moment, which is
why item 4's program prints one.
Exit
Deliverables — what Phase 2 hands to Phase 3
All of it lives in testing/test-plan.yaml as dated observations; none of it
is prose in a document nobody reads again.
| Deliverable | Content |
| Testbench record | hostname, last-seen IP, portal version, date. Memory, never an address tests connect to |
| DUT record | slot, chip type and revision, flash size, MAC — the unit this project is verified against, matching the FSD |
| Peer records | each project peer: what it is, its slot or address, the command it answered |
| Forward-path evidence | the CI run id, the artifact, the flash offsets used (from flash_args), and the marker observed |
| Capability updates | every project-side unproven resolved to yes or no; each no carries its consequence, each yes its observation |
| Agenda | empty of project-side items; anything left is bench-side and belongs to the testbench repo, named with its issue |
The gate
Run the four checks in a fresh checker with this project's gate file
(../build/references/gate-checks.md) — the session that flashed the board is
the one most likely to read a half-observed marker as proof.
The gate loops, it does not wave through. A failed check sends the work back to the act that owns it — a DUT that is not the expected unit, a peer that will not answer, a forward path that does not reach its marker — and the whole check runs again. Wave 1 does not start on a partial commissioning.
DUT ready — derived, never declared: the testbench commissioned (by law,
not by proof), the DUT connected and verified as the unit the FSD names, the
project's peers answering, and the forward path proven to deliver code to it. From here /build runs the journey
tests as the gate and the loop proper begins. For a project with no new
hardware and no peers, this phase is minutes, not days.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.