Use before any engineering estimate is made. Requires a written scope before an estimate, and a written estimate before a commit. Blocks "we'll scope as we go" and "just give me a rough number" completions.
In this repository8 other files it gives its agents.
- AGENTS.mdAGENTS.md
- CLAUDE.mdCLAUDE.md
- ab-test-designSkill
- ai-feature-validationSkill
- metric-definitionSkill
- mvp-scope-validatorSkill
- prd-quality-gateSkill
- user-research-synthesisSkill
The file
We split this skill into the rules it gives an agent
5 rules. About 0 are common, 3 are distinctive, and 2 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈3
Distinctive · estimate
This author's own choices. Worth a look.
2
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 103
If any of these are false, the "commitment" is a guess that will be held as a promise.
- Very specific: line 109
Before any number is given.
- Very specific: line 121
When a deadline is shared with stakeholders, share the scope reference.
- Distinctive: line 125
If scope changes after commit, the estimate is re-done.
- Distinctive: line 139
When feature-scoping is satisfied, state it like this:
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Feature Scoping
The Law
A FEATURE ESTIMATED WITHOUT A WRITTEN SCOPE IS A COMMITMENT MADE AGAINST UNKNOWN WORK.
"Give me a rough number" produces a number that becomes a deadline before the scope is understood.
Written scope → time estimate against that scope → explicit commit IS a feature decision.When to Use
Trigger before:
- Any request for an engineering estimate
- Any sprint planning that includes new functionality
- Any stakeholder conversation that will produce a commitment
- Any handoff from product to engineering
When NOT to Use
- Time-boxed spikes where the output is knowledge, not a feature (the scope is "spend N days and report back")
- Hotfixes with unambiguous scope (the scope is "fix the specific bug described in the issue")
The Scope Document
A scope document answers four questions before any estimate is given.
1 — What is being built?
User-visible behaviour only. Not implementation details.
The user can:
- [Action 1] — e.g., "filter search results by date range"
- [Action 2] — e.g., "export the filtered results as CSV"
The system will:
- [Behaviour 1] — e.g., "persist filter state across sessions"2 — What is NOT being built in this scope?
Name the exclusions. Every implicit exclusion is a future dispute.
NOT included in this scope:
- [Exclusion 1] — e.g., "bulk export (> 1000 rows)"
- [Exclusion 2] — e.g., "real-time filter updates without page reload"3 — What are the acceptance criteria?
Specific, testable conditions that define "done":
Given [state], when [action], then [observable result].Acceptance criteria are the contract between product and engineering. Vague criteria ("works correctly") are not acceptance criteria.
4 — What are the dependencies and risks?
Dependencies:
- [Service/team/data that must be ready before this can ship]
Risks:
- [Known unknowns that could expand the estimate]The Estimate Protocol
An estimate is only valid if it names the scope document it was made against.
Estimate format:
Feature: <name>
Scope reference: product/scopes/<feature>-<date>.md
Estimate: <N days> (confidence: high / medium / low)
Assumptions: [any assumption that, if wrong, invalidates the estimate]
Not included: [any exclusion the estimate depends on]What does NOT count as an estimate:
- A number given before seeing the scope
- A number given in a Slack message without assumptions
- "Probably a week or two" — no scope reference, no confidence, no assumptions
The Commit Protocol
A commit is an estimate made public. Before committing:
- The scope document exists
- The estimate was made against it
- The assumptions are recorded
- The stakeholder who will hold the commitment has read the scope
If any of these are false, the "commitment" is a guess that will be held as a promise.
The Process
Step 1 — Write the Scope Document
Before any number is given. Create product/scopes/<feature>-<date>.md with all four sections.
Step 2 — Give the Estimate Against the Scope
Engineering estimates the scope document — not a verbal description of it. The estimate references the scope file path.
Step 3 — Review Assumptions Together
Product and engineering review the assumptions explicitly. Any assumption that product disputes is a scope change — update the document and re-estimate.
Step 4 — Commit With the Scope Attached
When a deadline is shared with stakeholders, share the scope reference. "We'll have X by [date], scope is product/scopes/X-YYYYMMDD.md" makes the scope part of the commitment.
Step 5 — Enforce Change Control
If scope changes after commit, the estimate is re-done. No exceptions. "It's a small addition" always comes with a small amount of time that nobody accounted for.
Rationalization Red Flags
These thoughts mean scoping was skipped — stop:
- "Just give me a rough number" — the rough number will be the deadline; the scope will expand to make it wrong; the deadline will not expand with it
- "We'll scope it as we go" — you will ship whatever fits in the time and call it the feature; scoping-as-you-go is discovering scope under pressure
- "The scope is obvious" — to you; write it down so the engineer building it agrees, in advance, in writing
- "We need to move fast" — a scope document takes 30 minutes; a scope dispute takes 3 weeks and ships the wrong feature
- "The estimate will change anyway" — yes, when the scope changes; the current estimate is valid against the current scope, and changes require a new estimate
Completion Statement Format
When feature-scoping is satisfied, state it like this:
Scope complete.
File: product/scopes/<feature>-<date>.md ✓
What's built: <N user-visible behaviours listed> ✓
What's NOT built: <M explicit exclusions listed by name> ✓
Acceptance criteria: <N testable Given/When/Then statements> ✓
Dependencies: <listed> / Risks: <listed or "none identified"> ✓
Estimate: <N days>, confidence: <level>, made against this scope document ✓
Assumptions: <listed — reviewed with both product and engineering> ✓The estimate is invalid without the scope reference. A number without a scope is not an estimate.
Why This Matters
Scope and estimate are not separable. An estimate made before scope is complete is not an estimate — it is a guess that will be treated as a deadline. The scope document is what makes the estimate defensible when the feature takes longer than the guess. Without it, "you said two weeks" is an argument that cannot be won.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.