Closes the loop that every other financial-case skill in this pack opens — checks realized results against the original business case, full-potential diagnostic, or synergy case line by line, and attributes the gap to assumption error, execution, or external shock. Use whenever the user wants a post-implementation review, wants to check if an initiative or deal actually delivered its promised value, or has a past business case, full-potential diagnostic, or synergy case that's never been checked against what actually happened.

2 other projects use a version of this.

Adopted by

Most recently taken up by

The file

We split this skill into the rules it gives an agent

1 rule. About 0 are common, 1 is distinctive, and 0 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈1

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 0

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Feed the recurring cause back into practice: If assumption error keeps showing up across past reviews, that's a signal the assumption-audit …

    line 20

≈ “Common” is an estimate: at least 1 in 5 of the 364,980 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Value Realization

When to use

Use 6-18 months after a business case, full-potential diagnostic, or synergy case was approved, to check whether it actually delivered. Every skill in this pack that produces a projection (business-case-builder, full-potential-diagnostic, synergy-case-builder) has no accountability loop without this step — a business case with no eventual value-realization check tends to get more optimistic over time, since no one ever pays for being wrong.

What it does

Compares the original projection's driver-level numbers against actuals at the same granularity, attributes material variances to a specific cause (assumption error, execution gap, or external shock), and states plainly whether the initiative is on track but delayed, or genuinely off track — then feeds the finding back into how future cases in this organization get built.

Method

  1. Pull the original projection at driver level, not just the headline number — the same granularity business-case-builder, full-potential-diagnostic, or synergy-case-builder produced.
  2. Gather actuals at the same driver-level granularity and time periods, so the comparison is apples to apples.
  3. Compute variance per driver, not just the bottom line — offsetting errors can make a headline number look fine while hiding that every underlying driver missed in a different direction.
  4. Attribute each material variance to one cause: assumption error (the input was wrong from the start — check against any assumption-audit that exists), execution gap (the assumption was reasonable, delivery fell short), or external shock (outside anyone's reasonable forecast).
  5. State the verdict plainly: on track but behind schedule (needs a revised timeline, not a new decision), or genuinely off track (needs a real decision about continuing, adjusting, or stopping).
  6. Feed the recurring cause back into practice. If assumption error keeps showing up across past reviews, that's a signal the assumption-audit step is being skipped or done too lightly upstream — name it as a process fix.

Inputs

  • The original projection (business case, full-potential diagnostic, or synergy case) at driver-level detail
  • Actual results at the same granularity and time periods
  • Any assumption-audit findings from the original case, if available

Output format

Driver-by-driver projected-vs-actual comparison with variance; cause attribution per material variance; an explicit on-track-but-delayed vs. off-track verdict; one process-level learning fed back into future case-building.

Example

An initiative projected at $3M NPV within 18 months is reviewed at month 12: revenue tracks 15% below plan (an overly optimistic conversion-rate assumption, an assumption error) while costs run 10% under plan (an execution win). The blended NPV still looks roughly on track, but the review flags the revenue-driver miss as the real signal worth revisiting, rather than declaring the case validated because the bottom line happens to still look fine.

Common pitfalls

  • Checking only the bottom-line number, missing that offsetting driver errors can accidentally produce a healthy-looking total.
  • Treating every miss as an execution failure without checking whether the original assumption was ever realistic.
  • Skipping the review once a case has served its purpose of getting funding approved, breaking the accountability loop for every future case.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.