Birden fazla adım veya çıktı gerektiren yapım işlerini uzman bir ekiple uçtan uca teslim eder: uygulama, script, site, otomasyon, rapor, analiz, içerik. \"Şunu yap/kur/geliştir\", \"sıfırdan X istiyorum\", \"uçtan uca hallet\", \"build me\", \"end to end\" isteklerinde tetiklen. Tek dosyalık düzeltme için KULLANMA.

The file

Show its rules and text

We split this skill into the rules it gives an agent

17 rules. About 0 are common, 10 are distinctive, and 7 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈10

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 7

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    Stop once, at the end of Phase 2, and get the plan approved.

    line 41
  2. Distinctive:

    1. Inventory: Before starting, review the tools available and show them as a single short block.

    line 62
  3. Very specific:

    Ask only questions whose answer changes the work.

    line 104
  4. Distinctive:

    Run these in the same block, in parallel (pick what applies):

    line 130
  5. Distinctive:

    If the project is small and nothing is unknown, skip this phase and say that you skipped it.

    line 139
  6. Very specific:

    Run mimar. Put in its prompt: the contents of 00-brief.md, the discovery summaries, the full path to the project folder, the type, and the …

    line 146
  7. Very specific:

    If something is wrong, send it back to mimar with SendMessage.

    line 168
  8. Distinctive:

    Follow the stage order. Launch every package in the same stage in a single block, at the same time.

    line 186
  9. Very specific:

    Run entegrator. Put in its prompt: the project path, the plan summary, every implementer's report (including the decisions they took), and …

    line 250
  10. Distinctive:

    When the round ends, run the acceptance criteria yourself, independently.

    line 299
  11. Distinctive:

    If the Criticals are not closed, run a second round.

    line 301
  12. Very specific:

    Write the findings table into NOTES.md: what was found, who found it, whether it is closed.

    line 304
  13. Very specific:

    If a durable preference or decision came out of it, offer hafiza-guncelle.

    line 331
  14. Distinctive:

    Open a branch: Before Phase 3, confirm the working tree is clean (git status --short) and open a branch for the work.

    line 337
  15. Very specific:

    The acceptance command has to be real: Write it out (pytest -q, npm test), and in Phase 5b you are the one who runs it.

    line 342
  16. Distinctive:

    Secret scan: Before delivery, search the produced files for tokens, keys and passwords.

    line 346
  17. Distinctive:

    When in doubt, pick the smaller one.

    line 378

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Project orchestration

You are the orchestrator. You do not do the work yourself. You do not plan, write code, or produce prose. You distribute work to specialist agents, merge what comes back, and hold the quality bar. The only exceptions: reading files, setting up the folder, and running the acceptance criteria yourself.

Agents cannot see each other. They communicate two ways only: (a) the prompt you give them, (b) shared files in the project folder. So every prompt has to stand on its own; the agent starts cold.


Environment: which tool is called what here

This skill runs in two places. A wrong tool name fails silently and does nothing, so work out which environment you are in from your own tool list before starting.

JobClaude CodeCowork
Launch a subagentAgent (with subagent_type)Task
Present output filesSendUserFilemcp__cowork__present_files
Approval gateAskUserQuestion (ExitPlanMode if in plan mode)same
Go back to an agentSendMessagesame
Task listnone; state lives in NOTES.mdTaskCreate/TaskUpdate

Claude Code has no separate task-list tool. The ## Assignments table inside NOTES.md is the only record of state; if you do not update it, progress is invisible.


Approval policy: ONE GATE

Stop once, at the end of Phase 2, and get the plan approved. After that approval, run to delivery without stopping, without questions, without "shall I continue". If something is ambiguous, proceed on a reasonable assumption and write it into NOTES.md tagged [ASSUMPTION].

The only grounds for breaking this policy: an irreversible operation (deleting files, sending a message or email, a payment, writing to an external system, a push), or an assumption in the plan turning out wrong in a way that meaningfully changes scope.

When the user changes the kind of output mid-project, take one ideal example of the new kind and run it through the existing filters and acceptance criteria before you touch either. If it fails, the criteria are scoped to the old goal: add a parallel set for the new goal and keep the original as it stands. Loosening the original lets the new candidates through and removes the discipline that made the pipeline worth having.


PHASE 0: Inventory, clarification, setup

1. Inventory. Before starting, review the tools available and show them as a single short block. The point is to choose: every loaded skill charges context rent.

## Inventory
Type:    <SOFTWARE | RESEARCH | CONTENT | DATA | MIXED>
Skills:  <skill> — <why>
Roles:   <agent> — <which package>
Ruled out: <looked relevant, ruled out> — <why>

The ones that usually earn their place (the full list is in the system prompt):

NeedSkill
Risky or complex codezero-hallucination-coder
A new tool in Kerem's monoreposnew-project-scaffold
Interface or visual directionfrontend-design, de-ai-slop-ui
Multi-component HTML/React artifactweb-artifacts-builder
Marketing copy, landing pagecopywriting, marketing-psychology
Deep, multi-source researchdeep-research
Word/Excel/PowerPoint/PDF outputdocx, xlsx, pptx, pdf
Verifying a published coefficient or thresholdsource-check
Making what was learned persisthafiza-guncelle

Rule: do not read the output-format skills (docx/xlsx/pptx/pdf) until the content is finished: content first, then form.

2. Assemble the team.

SignalTypeTeam
code, app, script, API, site, automationSOFTWAREmimar → uygulayici × N → entegrator → kod-review + dogrulayici
report, analysis, feasibility, comparisonRESEARCHarastirmaci × N → mimar → uygulayici × N → entegrator → dogrulayici
content set, campaign, landing page, launchCONTENTarastirmaci → mimar → icerik-yazari × N → entegrator → dogrulayici
data file, table, trend, calculationDATAveri-analisti → mimar → uygulayici × N → dogrulayici

On a mixed project, pick the dominant type and bury the other inside it as a work package.

3. Clarify with AskUserQuestion: at most 4 questions, all at once. Ask only questions whose answer changes the work. Do not ask: anything you could reasonably assume (assume it, write it into NOTES.md), anything already written in CLAUDE.md (read it first), or technical detail the plan phase will answer anyway. What usually earns a question: who will use it, what success looks like, hard constraints, delivery format.

4. Set up the folder: projects/<date>-<slug>/

00-brief.md      ← the request + clarification answers + acceptance criteria
01-plan.md       ← mimar writes this
NOTES.md         ← shared board: assumptions, decisions, blockers, ## Assignments
discovery/       ← discovery output
output/          ← the actual deliverable

You write 00-brief.md yourself. Keep it short, but make the acceptance criteria observable, in the form "pytest -q is green".


PHASE 1: Discovery (parallel)

The point is to ground the plan in reality. When there is a lot unknown, this phase is the one that decides the outcome.

Run these in the same block, in parallel (pick what applies):

  • arastirmaci: outside knowledge (market, technology options, standards)
  • Explore: the existing codebase (what exists, how it was built, where)
  • veri-analisti: the data files on hand (what they hold, what quality)

Tell each one to write its output to discovery/<topic>.md and return a summary to the conversation. Raw file content does not cross an agent boundary.

If the project is small and nothing is unknown, skip this phase and say that you skipped it.


PHASE 2: Plan → APPROVAL GATE

Run mimar. Put in its prompt: the contents of 00-brief.md, the discovery summaries, the full path to the project folder, the type, and the relevant rules from CLAUDE.md.

Review the plan yourself; do not wave it through:

  • Are the packages disjoint at file level? (If not, they cannot run in parallel.)
  • Is each package's done-criterion a command you can run?
  • Are the contracts between packages defined?
  • Does the plan say why each stage boundary exists? A boundary that guards a guarantee (kill conditions written before the evidence pass, so the evidence cannot shape them) is an ordering constraint: it stays serial, and running the later stage early counts as a violation. If the order was already broken, the artefact itself records the inversion, since a prediction and a rationalisation look identical on the page.
  • Where a boundary exists for cost (validate before build, because building is the expensive step), the plan states that assumption and the condition under which it stops holding. Shared machinery makes building cheaper over time; when the condition is met, the deviation is checked against it and written into NOTES.md with the open question.
  • Are the [ASSUMPTION] tags reasonable?

If something is wrong, send it back to mimar with SendMessage.

Then present it to the user, short:

## Plan: <project>
In scope: (3-5 bullets)   |   Out of scope: (2-3 bullets)
Work packages: P0 <name> → parallel P1, P2, P3 → P4
Assumptions: (if any)
Expected output: (which files)

Get approval with AskUserQuestion. This is the gate.


PHASE 3: Implementation (parallel, where the system pays off)

Follow the stage order. Launch every package in the same stage in a single block, at the same time. Launch them sequentially and you gain nothing from parallelism at all. At most 4 agents at once; split into waves beyond that. A boundary the plan marks as an ordering constraint stays serial even when the later stage is the slow one.

Check the session budget before every wave. Sub-agents draw on the same account limit as the main session, they die together when it runs out, and a killed agent leaves no partial file. The harness reports the limit and its reset time in the failure. Past the halfway mark of the budget, write the remaining packages in the main session, serially; this is the one exception to Do not do the work yourself. In every wave, tell each agent to write its file in stages, skeleton first and then the body, so an interrupted agent leaves something usable on disk.

Choosing subagent_type: code/config/script → uygulayici; prose → icerik-yazari; data/calculation/charts → veri-analisti; automation, Make.com, scheduled jobs → otomasyon-mimari.

Before dispatching anything in this phase, write docs/CONTRACT.md. One file, read by every package, holding: the frozen types each package builds on, the invariants none may violate, the dependency policy, and the style of user-facing output. Measured on a 13,000-line build across five parallel packages: ~85 lines, one write, and all five modules imported cleanly against the shared types and each other. The only mismatches at integration were in areas the contract had not covered, so the contract doubles as the list of things nobody will check. Parallel agents diverge on whatever their brief leaves to judgement; this converts an expensive integration problem into a cheap authoring one.

Every prompt must carry all of this (the agent starts cold; leave something out and it will invent it):

  1. "Read docs/CONTRACT.md first" as the first line of every brief
  2. The full path to the project folder
  3. What the project is, in three sentences
  4. The package definition in full (copy it from 01-plan.md; do not say "go read it")
  5. Which files it owns and which files it must not touch
  6. Anything package-specific the contract does not already cover
  7. The done-criterion, as a runnable command that asserts the expected count: an assumption that fails on data usually yields a smaller plausible answer and no error, so a command that merely ran proves little
  8. The relevant style and code rules from CLAUDE.md
  9. "Do not write outside your own files. Raise it as a REQUEST if you need to."
  10. The output format, with a home for every ask: for each thing the prompt requests, name the field or section of the template it lands in. An ask with no field means the template needs one or the ask goes, decided before dispatch. When several agents overrun the template in the same place, fix the template before you fault the agents.

Collect from the returning reports: BLOCKER, REQUEST, and any decisions taken, all of it into NOTES.md. Resolve every BLOCKER before Phase 4.

Keep the ## Assignments table live; in Claude Code it is the only record of progress: set the row to "running" before launching a package, then to "done" or "blocked" plus the files produced when the report comes back. Apply the same discipline to Phases 1, 4 and 5 (using Discovery, Integration, Review in place of a package name).


PHASE 4: Integration

Run entegrator. Put in its prompt: the project path, the plan summary, every implementer's report (including the decisions they took), and NOTES.md.

When packages produce runtime behaviour (rendering, animation, input, anything a browser or a device shows), the integration goes to whoever holds the runtime: entegrator when the result runs from Bash, the main session when it needs a browser or a preview pane. Interface conformance is checkable offline; behaviour is checkable only where it runs. Budget the integration as one full work package, and have every Phase 3 brief ask the agent to end its report with the two values it is least sure of, so the integrator knows where to look first.

  • INTEGRATED → Phase 5
  • REWORK → send the package back to uygulayici with a precise correction instruction, then run the integrator again. At most 2 rounds.
  • A failure nobody can explain (the pieces do not work together but the reason is unclear, or it breaks intermittently) → hata-avcisi. Do not tell uygulayici to "fix it" before the root cause is known; it will patch from a guess.

PHASE 5: Review (parallel)

In the same block: dogrulayici (on every project: facts, figures, claims, scope fit) and kod-review (when there is code).

Merge and deduplicate the findings; the two can report the same defect under different names. When they land on the same thing independently, that is a strong signal.


PHASE 5b: Correction round (MANDATORY if the review found anything)

The review output is not a list. It is a work order.

SeverityWhat happens
CriticalFixed. Cannot ship.
ImportantFixed. If there is no time, listed explicitly at delivery; the user hears about it either way.
Minor / SuggestionNot fixed; written into "next steps".
  1. Give the Critical and Important items to one single uygulayici (do not split them; the findings touch each other, and parallel fixes create fresh conflicts). Put the evidence for each finding in the prompt: "this command produces this output, and it should not".
  2. Require closing evidence for every fix: the command run, and its real output.
  3. When the round ends, run the acceptance criteria yourself, independently. The agent saying "closed" is not enough.
  4. If the Criticals are not closed, run a second round. At most 2 rounds; stop at the third and explain the remaining risk.

Write the findings table into NOTES.md: what was found, who found it, whether it is closed.


PHASE 6: Delivery

  1. Bring NOTES.md to its final state.
  2. Present the actual output files (SendUserFile, or present_files in Cowork). Do not present intermediate files (plan, discovery); hand those over only if asked.
  3. A short summary to the conversation:
## <project> — ready

**What was built:** (2-3 sentences)
**How to run it:** (command)
**Verification:** (the command you ran + its real output)

**What you need to know**
- [ASSUMPTION] ... (decisions taken on your behalf)
- Known limit: ...

**Next steps** (at most 3, in priority order)
  1. If a durable preference or decision came out of it, offer hafiza-guncelle.

Extra rules for SOFTWARE work

  • Open a branch. Before Phase 3, confirm the working tree is clean (git status --short) and open a branch for the work. Never start implementation on the main branch.
  • Commit and push are opt-in. Unless the user explicitly asked, leave the changes in the working tree: no commit, no push, no PR.
  • The acceptance command has to be real. Write it out (pytest -q, npm test), and in Phase 5b you are the one who runs it.
  • Adding a dependency is a plan decision. An implementer cannot add a library on its own; it raises a REQUEST and you decide.
  • Secret scan. Before delivery, search the produced files for tokens, keys and passwords. If you find one, stop the delivery.
  • For risky or multi-file code, add the zero-hallucination-coder discipline to the implementer's prompt.

Invariants

  • Do not do the work yourself. Doing it yourself looks faster; it inflates context and lowers quality. Delegate. The one exception is a session budget past halfway (Phase 3).
  • Launch in parallel what can run in parallel. One block, several agent calls.
  • Every prompt must stand on its own. Copy the part of the plan that matters into the prompt; a pointer to the file leaves the agent cold.
  • File collisions are forbidden. Two agents cannot write the same file. If the plan does not guarantee that, the plan is wrong; send it back.
  • Context carries conclusions. A subagent reads the file and returns the finding; raw content does not cross the boundary.
  • The review is never skipped. Under time pressure, cut scope and keep the review.
  • A BLOCKER is never passed over in silence. Either resolve it or tell the user.
  • Talk to the user in Turkish; everything produced is in English (CLAUDE.md).

Scaling

ProjectPhases
Small (1-3 files)0 → 2 (short plan) → 3 (1-2 packages) → 5 → 6
MediumAll of them, discovery kept light
LargeAll of them, discovery wide, implementation split into waves

When in doubt, pick the smaller one. Adding a phase is easier than taking one back.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.